An arched, paneled wardrobe is one of the easiest joinery items to get wrong and one of the most expensive to fix after the fact. The curve changes how a door is built, how it sits against a ceiling that is never perfectly level, and how the whole run reads once the lights are on. Because these pieces are made to measure for each space, a supplier can only quote them properly once a short list of information arrives complete. Here is exactly what we need from you, and why.

What We Mean by Arched Paneled Wardrobes

Our Arched Paneled Wardrobes belong to the Classic Paneled Wardrobes collection. The doors carry a framed panel — a stiles-and-rails construction with a raised or recessed centre — and the arched version puts that curve into the top rail, either as a soft arc across one door or as a shared arch across a run of doors. Panel style, finish and layout are specified per project, so the same arch profile can be built in painted MDF, wood veneer or solid timber depending on the look you are after.

If your brief is closer to a flat, handleless wall of storage than to a paneled door, that is a different product family — see our custom minimalist bedroom wardrobes. Both are made to measure; they simply need different information to price.

1. The Room and the Exact Opening

Send us a sketch or a set of dimensioned drawings of the bedroom, with the wardrobe wall dimensioned in millimetres: overall width, overall height at several points along the run, and depth at the top, middle and bottom. Old buildings and site-built plasterboard walls rarely hold an even depth, and a 10 mm variation across three metres changes scribe widths and the position of the arch apex.

Tell us specifically what happens at the top of the unit:

  • Does the wardrobe run to the ceiling, stop below a cornice, or sit under an exposed beam?
  • Is there a ceiling rose, sprinkler head, downlight, air grille or curtain track in the zone above or in front of the doors?
  • Is there a skirting board to scribe around, and does it continue behind the unit?
  • Are there power points, switches or radiator positions inside the footprint?
For an arched door, height is not one number. We need the straight rail height and the rise of the arch — how far the curve lifts above that line — so the arch reads correctly against the ceiling rather than crowding it.

2. Door Layout, Opening Direction and How the Arch Spans

This is where most revisions come from. Send a door schedule: number of doors, width of each, hinged or sliding, opening direction, and which side handles and hinges sit on. Then state how the arch behaves across the run — one arch per door, or one continuous arch formed by two or three doors meeting.

A few practical points worth settling before you draw:

  • Hinged paneled doors need clearance to swing; sliding doors need a track zone and lose a little internal depth. Our sliding door wardrobes show how a track arrangement works where a swing path is not available.
  • A continuous arch across three doors means matching the curve at each stile, so equal door widths make the job cleaner and cheaper to repeat across several rooms.
  • Very narrow doors cannot carry a deep panel profile; very wide single doors get heavy. Tell us your preferred door width and we will flag where the profile has to change.

3. Internal Layout and What Has to Fit Inside

Interior fit-out drives cost more than the doors do, so send the storage plan rather than leaving it to us:

Item to confirmWhy it matters for the quote
Hanging zones: single or double hang, and hanging heightsSets shelf positions and carcass heights per bay.
Drawer count, drawer type and widthRunners and soft-close hardware are quoted per set.
Shelves, shoe shelves, trouser pull, valet rod, jewellery trayEach accessory is a line item; guessing them inflates or understates the price.
Items to store: luggage height, long coats, ironing board, safeDetermines clear internal heights and reinforced shelf spans.
Built-in lighting, sensors or mirror panelsNeeds power positions, driver access and a switch plan agreed early.

4. Materials, Finish and Edge Details

We can build the arch profile in several substrate and finish combinations, and each is quoted differently. Tell us:

  • Carcass board and door material preference — solid timber, MDF with paint, or wood veneer. Our classic paneled solid wood wardrobes and the walnut versions in that range are the closest reference points for a painted or stained paneled door.
  • Colour reference: paint code or physical sample, sheen level, and whether the arch profile is to be painted in the same colour as the panel or contrasted.
  • Panel profile: raised, recessed or flat, with the moulding width you want on the stiles and rails.
  • Edge and visible-side treatment — does one side of the unit face into the room and need a finished return?

If the joinery continues elsewhere in the project — vanity, media wall, niche paneling, walk-in wardrobe fit-out — send those details too. Matching a finish across several items in one production run is simpler than matching it later.

5. Quantities, Site Conditions and Delivery

For a single bedroom we quote from your dimensions. For a villa or an apartment floor, send the room-by-room schedule and the number of repeats: when the same door layout appears in several bedrooms, one production run covers them all, which is where made-to-measure joinery starts to make commercial sense across a project.

Also state the practical delivery facts, which affect packing and cost:

  • Project address and whether the site is a high-rise with lift size limits or a house with stair access — assembled carcasses and long panels must fit the route in.
  • Which trade installs: our team on site, your local installer from our assembly drawings, or supplied flat-packed.
  • Target on-site date, working backwards from plastering, flooring and painting being complete.
  • Any glazing, hardware or accessories you intend to supply yourselves.

What You Receive From Us, and in What Order

Our cooperation steps are fixed for a reason: each stage closes a decision before money is committed. First the project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. In practice that means we return a marked-up drawing showing arch geometry, door schedule and internal layout for your sign-off before the order enters production.

Because we are a one-stop furniture and building materials supplier, the same joinery can be produced alongside the rest of the fit-out — cabinetry, wall paneling, doors, flooring and bathroom fixtures — under one production and logistics plan. Our custom and OEM service covers bespoke profiles such as an arch moulding developed for your design, and our logistics and door-to-door delivery covers freight, packaging and container loading to the site address you give us.

A Practical Enquiry Checklist

Copy this list into your email and attach what you have. A complete enquiry usually comes back with a firm quotation; an incomplete one comes back with questions.

  • Dimensioned drawing or sketch of the wardrobe wall, in millimetres, including ceiling height at several points
  • Arch detail: rise of the curve and how many doors it spans
  • Door schedule: count, widths, hinged or sliding, opening direction
  • Internal layout with drawer counts and accessories listed
  • Material and finish reference, plus sheen and profile preference
  • Quantity of rooms or repeats
  • Site address, access constraints and target on-site date
  • Photos of the room, including the ceiling line and skirting

Send us the drawings. Email santerson@qq.com or reach us on WhatsApp at +86-13928214007 (attention: PHILLIP). Include the wardrobe wall dimensions, your arch reference and the internal layout, and we will come back with a marked-up drawing and an itemised quotation.

Prefer to look first? Browse the built-in furniture range or the contact page.