A rendered kitchen elevation is not yet a cabinetry order. Between the design brief and a firm quotation for light & dark grey modern kitchen cabinets sits a set of decisions that most buyers only discover when prices start to diverge: door construction, panel finish, carcass make-up, appliance interfaces and the tolerance plan for on-site fitting. The checklist below follows the enquiry sequence SANTERSON uses on villa, apartment and boutique hotel projects, so your first message produces comparable pricing instead of three different interpretations of one drawing.
Why two-tone grey cabinetry punishes vague briefs
Two-tone layouts make every inconsistency visible. Light grey uppers and dark grey lowers, as on the light and dark grey kitchen cabinet reference design, read as one system only when the flat panel profile, edge treatment and surface sheen match across runs. A supplier quoting from an incomplete brief will pick a default: one run in matte lacquer, another in foil-wrapped board, uppers hung on a different carcass depth than the drawing assumed. None of that is visible in a render, but it is obvious once installed under under-cabinet lighting.
Glass display cabinets amplify the same problem. The reference layout places warm-LED-lit glass cases at both ends of the run, with an under-cabinet light strip over the working top. That means glazing type, shelf loading, transformer position and a serviceable cable route all belong in the enquiry, not in a later variation order.
Step 1: Send the drawing package, not a mood board
Mood boards set direction; they do not carry dimensions. For a cabinetry enquiry, attach what the workshop actually needs to price:
- Scaled elevations of every wall the cabinetry touches, with overall heights and run lengths marked.
- A plan showing the work triangle and clearances, so drawer stacks and door swings can be checked against circulation.
- An appliance schedule with model numbers or at least cut-out dimensions for the built-in refrigerator, oven and any wine storage.
- Ceiling height and a note on bulkheads, beams or service runs that interrupt a full-height run.
- The finish reference you want matched: a physical sample, a manufacturer code, or an existing installed photo taken in daylight.
Step 2: Fix the door and carcass specification before asking for a price
The single largest source of price spread on flat panel cabinetry is what sits behind the door face. State your preference, or ask us to quote two options side by side so the trade-off is explicit.
| Decision | What to specify in the enquiry | Why it moves price and lead time |
|---|---|---|
| Door construction | Flat panel, slab or shaker; core type; edge detail (square, bevelled, ABS, lacquered) | Thin flat panels telegraph substrate flaws; a better core and edge banding cost more but hold their line on long runs |
| Surface finish | Matte or high-gloss lacquer, acrylic, laminate or foil; light grey and dark grey codes for uppers and lowers | Lacquer and acrylic need more handling stages than foil; gloss shows fingerprints and demands careful site protection |
| Carcass make-up | Cabinet depth and height per run, back panel fixing, adjustable shelf positions | Full-height and deep base units use more board and heavier hardware than the standard sizes most quotes assume |
| Hardware | Hinge and runner brand or grade, soft-close requirement, handleless profile or pull type | Handleless routed fronts change door construction; runner grade decides how a deep pan drawer behaves after years of use |
| Glass and lighting | Glass type and thickness for display cases, shelf spans, LED colour temperature, driver location and access | Lit glass cases are joinery plus electrical work; the driver needs an accessible position before the case is fixed to the wall |
| Appliance interfaces | Cut-out dimensions, ventilation gap, door-hinge side, panel-ready or integrated trim | A wrong hinge side or missing ventilation channel turns a cabinet into a site modification |
Step 3: State the project context and quantities honestly
Cabinetry for one apartment kitchen and cabinetry repeated across thirty similar units are different manufacturing problems. Tell us:
- Whether this is a private villa, a high-rise apartment or a boutique hotel fit-out — the reference design lists all three as applications, and each carries different wear expectations.
- The number of identical or near-identical sets, and whether any set varies by unit type.
- Where the goods land and who installs them, because that decides packing specification and how much pre-assembly is worth doing in the workshop.
- Your target site date, with a realistic allowance for approval drawings rather than an assumed start.
Repetition is where custom manufacturing earns its keep. Once the first set is approved, repeat units are produced from the same cutting files, which is why OEM furniture manufacturing enquiries that name quantities early usually give us more room to optimise packing and production batching than one-off requests do.
Step 4: Expect the enquiry to come back as drawings, not a number alone
Our working sequence on cabinetry is short and deliberate: project brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. For kitchens, the stage between quotation and production is where the workshop converts your elevations into shop drawings — carcass breakdown, door schedule, hardware list, glass sizes, lighting circuit.
Read those drawings. Confirm the shelf positions you actually use, the drawer configuration in the tall unit, whether the display cases sit at eye level or above the hob, and that the appliance cut-outs match the schedule you submitted. Sign-off at this point is what keeps production and the site date aligned.
Step 5: Close the logistics questions while production is still ahead of you
Cabinetry travels badly when it is treated as generic freight. In the enquiry, confirm that the quotation covers packing suited to sea freight, container loading sequence matched to your site access, and the documents your customs broker will ask for. Our furniture logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, shipment tracking and documentation; Incoterms, duties and delivery scope are confirmed per project rather than assumed.
Then fix the receiving plan: storage conditions on site before installation, who signs for each crate, and how damaged or missing panels get replaced. A replacement door in a specific grey code has to be re-produced and re-finished, so it is worth naming the spare-parts route in the order paperwork.
A short enquiry template you can copy
Send this and we can usually come back with an itemised quotation and a shop-drawing schedule, rather than one rounded figure:
- Project: villa / apartment / boutique hotel; location; site target date.
- Sets: number of kitchen runs or identical units, plus any variations by unit type.
- Reference design: Light & Dark Grey Modern Kitchen Cabinets with LED Glass Cabinets, or your own drawing package attached.
- Doors and finish: flat panel construction preferred; light grey uppers, dark grey lowers; matte or gloss stated; sample or colour code attached.
- Carcass and hardware: depths and heights per run, soft-close requirement, handleless or pull type.
- Glass and lighting: number of lit display cases, glass preference, LED colour temperature, driver access point.
- Appliances: schedule with cut-out dimensions and hinge sides.
- Delivery: port of destination, delivery address, Incoterms preferred, installer named or to be advised.
Send the brief when it is half-finished, not when it is perfect
You do not need a complete specification to open an enquiry — you need elevations, quantities and your intended finish. Send what you have and we will return the gaps as questions with priced options attached, so the decision on lacquer versus laminate or handleless versus profile pull becomes a number you can compare instead of a guess. Contact SANTERSON, a one-stop furniture and building materials supplier, with your drawings and target site date.