Open walk in wardrobes are one of the easiest built-in items to misquote and one of the easiest to get wrong on site. Because there are no doors to hide a bad proportion, every dimension, finish edge and lighting line stays visible once the room is finished. Buyers who send a supplier nothing more than a room name usually get a vague price back, then spend weeks going round in circles. The checklist below covers what to gather before you make that first enquiry, so one message is enough to start a real quotation.

1. The room dimensions, taken the way an installer will measure them

Send the length and width of the space plus the floor-to-ceiling height at more than one point, not a single average figure. Slab floors, old walls and plastered ceilings rarely run true, and with an open layout any out-of-plumb wall shows in the shadow line between shelves. Note obstructions that a drawing often leaves out:

  • Skirting or baseboard heights, and whether they will be removed or scribed around
  • Recessed power sockets, switches, thermostats and data points on the wardrobe walls
  • Air-conditioning ducts, sprinkler heads, downlights and ceiling cornices above the run
  • Door openings, window reveals and the swing path of the room door
  • Adjacent floor finish and its thickness, which decides whether a plinth is needed

If you have architectural drawings, send the plan and at least one section through the room. A marked-up phone photo of each wall, with tape-measure readings written on it, is more useful than a beautiful 3D render, because the render hides the awkward corners.

2. How the room will actually be used

Open wardrobes work best when the internal layout follows a daily routine rather than a generic shelf pattern. Before you write, decide what has to live in the room and how much of each:

  • Long hanging for coats, dresses and suits, and short double hanging for shirts and folded tops
  • Drawers for knitwear and undergarments, and whether you want shallow jewellery or watch trays
  • Open shelving for bags and shoes, plus a height allowance for seasonal storage above the door line
  • Full-length mirror position, ironing or laundry access, and a seat or island if floor area allows

Say who uses the room and how many people. A shared bedroom wardrobe needs two clear hanging zones; a single-user dressing room can put most of its budget into drawers and display shelving instead.

3. Layout options you want quoted, not just one

Walk-in wardrobe layouts are usually settled by floor area and by where the room door lands. Ask for two or three configurations and compare them on circulation width and total hanging metres rather than looks alone.

LayoutSuitsWhat to check in the drawing
Two parallel runsNarrow, long rooms and corridors off a bedroomAisle width between the two runs, including drawer pull-out
L-shaped runBedroom corners and box rooms with one doorHow the corner is resolved: shared hanging, angled shelf or blank carcass
U-shaped runLarger dressing rooms with three clear wallsWhether the centre stays free to move and dress in
Run plus islandRooms wide enough for a central unitIsland height, worktop use and clearance on all four sides

SANTERSON's walk-in wardrobe range includes Open Walk in Wardrobes, L Shaped Walk in Wardrobes, U Shaped Walk in Wardrobes and Island Walk in Wardrobes. Each is made to measure, with the finish, layout and dimensions specified for the individual project, so sending your drawings against a reference model gives the supplier a starting point instead of a guess.

4. Materials, finishes and the edges you can see

With no doors, the carcass, shelf edges and back panels become the visible design. Tell the supplier what the rest of the room already looks like: flooring, wall colour, joinery in the bedroom and hardware finish in other bathrooms or kitchens. Then state your preferences on:

  • Board type and grade for carcass, shelves and doors to any closed cupboard within the run
  • Surface finish — lacquer, laminate, veneer or solid timber — and whether it is single-sided or double-sided where a unit stands free
  • Edge banding colour and thickness, and which edges are exposed to view from the room
  • Back panel thickness and fixing method, which affects how flat the unit sits against an uneven wall
  • Hardware: drawer runners with soft close, hinges, shelf pins, hanging rails and their load rating

Ask for a physical sample board of the exact decorative finish, not a photograph on screen. Warm whites and greys shift noticeably between laminates, and open wardrobes are lit from several angles.

5. Lighting and electrical details

Lighting is where open wardrobe projects most often stall, because the joinery and the electrician have to agree before panels are cut. Send:

  • Which shelves, hanging rails or niches need lighting, and whether you want sensor, door-contact or manual switching
  • Preferred colour temperature and whether fittings are surface-mounted or routed into the shelf
  • Where drivers and transformers will be hidden, and how they will stay accessible for replacement
  • Cable routes and any conduit needed inside carcasses, plus who supplies the low-voltage cabling on site

If you are also buying bathroom or bedroom lighting from the same supplier, mention it in the first message. Coordinating fixtures across rooms is straightforward when they are specified together and expensive to fix later.

6. Project context: who you are buying for and where it is going

A single villa wardrobe and a repeated hotel or apartment schedule need different paperwork. State clearly whether this is one room or a multi-unit job, the delivery city, and your role — owner, builder, designer or developer. For repeat units, ask how the supplier handles type approval, then unit-to-unit consistency.

Also set out how much of the fit-out you want from one source. Wardrobes rarely sit alone: skirting, doors, vanities, wall panelling and flooring usually meet them. Buying those items together reduces the number of trades arguing over tolerances, which is where a one-stop furniture and building materials supplier earns its keep.

If dimensions are still moving, ask for the custom furniture design and prototyping route rather than ordering straight away. Confirming a layout at drawing stage costs little; re-cutting panels after production starts does not.

7. Commercial questions to include in the same message

Buyers often leave these until after a price arrives, then lose two weeks. Put them in the first enquiry:

  • Pricing basis: per linear metre, per unit or itemised bill of materials, and what is excluded
  • Payment terms and stage payments before production begins
  • Packaging standard, container loading plan and whether the units ship flat-packed or assembled
  • Freight mode and who handles customs clearance on your side; sea, air and rail are all options for furniture consignments
  • Site installation: local labour, or a supplier-supervised fit with snags handled afterwards
  • Spares policy for hinges, runners and shelf pins, so replacements match years later

Ask the supplier to confirm dimensions and the selected specification in writing before cutting panels. That single confirmation line protects both sides if a wall turns out to be 20 mm out.

8. A short message you can copy

Keep the enquiry under 300 words and structure it so nothing has to be chased:

  • Project type, city and whether it is one room or several units
  • Room dimensions per wall, ceiling height and known obstructions
  • Preferred layout reference from the range, plus what you want stored inside
  • Finish preference, hardware expectations and lighting intent
  • Target delivery date and your preferred port or site address
  • Drawings, marked-up photos and finish references attached

Suppliers reply faster and more accurately to enquiries that already answer the obvious questions. A supplier such as SANTERSON, which works on villa, hospitality and office projects from design through production, logistics and installation, can usually return a first layout and quotation within a few working days once drawings and dimensions are in hand.

Frequently asked questions

Do I need drawings, or is a photo enough?

A photo with written measurements can start the conversation, but a plan and one section let the supplier check hanging heights, corner handling and lighting routes in the same pass. Without them you will get an indicative price rather than a quotation.

When should measurements be taken?

Take first-fix dimensions once floors, ceilings and plaster are complete, then confirm the final set before production. Where finishes are still undecided, ask for a tolerance range instead of one fixed number.

Can open wardrobes be made to match other joinery in the house?

Yes, if you send finish samples or the make and reference of existing cabinetry. Board substrate, edge banding and hardware all have to match, not just the colour.

What is the most common cause of delay?

Late changes to internal layout or lighting after panels are cut. Freeze storage requirements and cable routes before production, and keep any change to a written revision with a re-quoted price.

Before you send: room dimensions per wall, ceiling height at several points, obstruction list, storage requirements, layout references, finish and hardware preferences, lighting intent, project type and delivery city, plus commercial terms you need. That is enough for a supplier to return a real layout and price rather than an estimate.
If your wardrobe room drawings are ready, send the plan, marked-up wall photos and finish references together in one enquiry — contact SANTERSON to start a made-to-measure open walk in wardrobe quotation for a villa, apartment or hotel project.