A wardrobe order rarely goes wrong at the drawing board. It goes wrong in the gap between what the drawing says and what the factory understood. The pages below list exactly what a manufacturer needs to price, build and ship wooden sliding door wardrobes correctly the first time.
Why Sliding Door Wardrobes Are Briefed Differently From Hinged Ones
Sliding doors hang from a track and run past each other, so the tolerances are not the same as a hinged wardrobe. A hinged door is fixed at one edge; a sliding panel has to travel its full width without touching the carcass, the adjacent panel, skirting, carpet or a wall return. That single fact changes several numbers in your brief at once.
Three consequences follow, and each one belongs in the enquiry rather than in a later email:
- Opening width versus panel width are not the same figure. Two panels on a 2,000 mm opening do not measure 1,000 mm each. Panels must overlap at the meeting stile and clear the end stops, so the manufacturer sizes panels from the finished opening after track allowance, not from your elevation dimension.
- Depth is consumed twice. A sliding mechanism needs a track zone at the base or head, and panels ride in front of the carcass opening. Interior storage depth is therefore smaller than overall furniture depth. State which number you care about: total projection into the room, or usable shelf depth behind the door line.
- Floor finish level decides whether the door works at all. Tile thickness, screed, adhesive and a rug edge all sit under a bottom track. If the finish floor level is not yet settled, say so in the brief and ask for the wardrobe to be dimensioned off a marked datum line rather than an assumed one.
The Seven Items Your Enquiry Should Contain
Manufacturers quote made-to-measure joinery in rounds when information arrives in rounds. Sending these seven items together is usually what separates a firm quotation from an estimate with caveats.
| Item | What to state | Why the manufacturer needs it |
|---|---|---|
| Openings, not elevations | Width, height and depth of each recess at three points (top, middle, bottom), plus out-of-plumb and out-of-level readings if walls are not true. | Older and renovated villas rarely have square recesses. A single nominal dimension forces the factory to guess the clearance. |
| Datum line | The finished floor level and finished ceiling level the unit must fit between, and whether skirting is removed or scribed around. | Determines track position, panel height and whether scribing is required on site. |
| Door layout | Number of panels, which panels move, which are fixed returns, and the direction each panel travels. | Fixes the internal division positions before carcass panels are cut. |
| Internal fit-out | Rail heights, shelf counts, drawer banks, trouser or shoe provision, lighting, and any items that must be reachable past a half-open door. | Drawers and pull-out rails only work where a panel does not block them. This has to be resolved before the carcass is built. |
| Door face material and finish | Timber species or engineered substrate, veneer or lacquer system, grain direction, and a physical sample reference rather than a colour name alone. | Colour names mean different things across suppliers. A sample code or physical swatch removes the argument later. |
| Interface details | Adjacent wall and floor materials, handle or profile-edge preference, door stop positions, and clearance to switches, doors or furniture in the swing path. | Prevents a new panel fouling an existing door or covering a light switch. |
| Access and delivery | Lift dimensions, stair width, corridor turns, container or crate requirements, and the site address for delivery. | Panels that cannot pass a landing have to be split into smaller units, which changes both construction and price. |
Specify the Finish System, Not Just The Colour
For matte sliding door wardrobes and high gloss sliding door wardrobes, the surface treatment matters more than the colour code, because large flat panels show sheen variation before they show hue variation. A brief that names only "oak" or "grey" invites a panel that matches your sample under daylight and not under the room's lighting.
Practical things to write down instead:
- Whether the face is solid timber, veneer over an engineered substrate, or a laminated panel; each moves differently with humidity and each has different edge treatment.
- Grain direction across all panels in one run, and whether adjacent units in the same room share one grain orientation.
- For gloss faces, how edges are finished, since a wrapped edge and a sprayed edge read differently at an angle.
- The light source you will live with: downlights grazing a gloss panel reveal surface undulation that a sample held upright never shows.
Mirror And Glass Panels: What Changes In The Brief
If a mirror or glass panel is under consideration alongside timber, add it to the same enquiry rather than treating it as an option later. Panel weight changes the track, the hanger specification and the maximum panel size, and re-specifying after carcasses are cut usually means new parts.
A mirror sliding door wardrobe also needs a decision about safety backing and edge polish, because the mirror is a visible edge in daily use. A glass sliding door wardrobe needs the glass type, thickness and any frosting or tint stated on the drawing, since these are not substitutions a factory can make silently.
Where two-tone rooms are planned, ask for the pair to be quoted together. Two tone sliding door wardrobes share a frame and track system between finishes, so a combined order keeps the split line consistent across rooms.
Ask For A Shop Drawing Round Before Production
The most reliable checkpoint in custom joinery is a shop drawing issued by the manufacturer for your sign-off. It should show finished dimensions at each opening, panel divisions with travel arrows, internal elevations of the fit-out, and the selected finish references. Read it against the site, not against your original concept image.
Three checks take two minutes and prevent the commonest call-backs:
- Do the marked heights on the shop drawing match what was measured at the three points you recorded, or has one nominal figure replaced them?
- Does every drawer and rail sit in a zone that is reachable when only half the opening is clear?
- Are finish references quoted as sample codes you can identify, rather than descriptive names?
How A One-Stop Supplier Changes The Coordination Load
Wardrobes rarely sit alone on a site programme. Flooring goes in under them, wall panelling butts into their reveals, doors and skirting have to meet their edges, and lighting has to serve the interior of the units. When these come from separate suppliers, your team becomes the interface between them, and dimensional disagreements get resolved on site at speed.
Sourcing wardrobes alongside custom niche paneling, wooden sliding doors and the room's flooring means one party holds the dimensional chain from floor to ceiling. Santerson works this way as a China-based furniture and building materials manufacturer, supplying custom wardrobes together with the surrounding built-in elements for villa, hospitality and office projects, under turnkey interior project solutions that cover design coordination, custom and OEM production, door-to-door logistics and installation support. Project references published on the site include villas in Sydney, Melbourne, Perth and Willoughby.
That scope does not remove your responsibility for accurate site measurement. It removes the handover arguments. Ask one supplier to confirm floor levels, panel sizes and reveal details together, and hold them accountable as a set.
A Short Pre-Order Checklist
- Three-point measurements for every opening, with level and plumb noted.
- Finished floor and ceiling levels confirmed, or the expected variation flagged.
- Panel count, travel direction and fixed returns drawn, not described.
- Internal fit-out resolved against a half-open door.
- Finish specified by sample code, with grain direction stated.
- Access route measured for the largest panel you might receive.
- Shop drawing signed before panels are cut.
Send that package and a competent manufacturer can quote without caveats. Anything still missing is a decision, not a detail, and decisions are cheaper to make on paper than in the field.
Send us your wardrobe drawings.
Santerson manufactures made-to-measure wooden sliding door wardrobes with project-specific dimensions, layouts and finish options. Share your openings, datum levels and fit-out schedule, and we will return a shop drawing for your review before production.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com