A wardrobe quotation can look complete on paper and still leave the expensive decisions unresolved. Two drawings, two similar-looking glass samples, and two very different invoices usually mean the checklist was never closed out. If you are specifying smoked glass aluminum frame wardrobes for a villa bedroom, a walk-in robe, or a run of apartment interiors, the checklist below is the one we ask buyers to work through before a drawing is released to production.
What the checklist has to cover before you request a quotation
A buying checklist for this product type is not a shopping list. It is a decision record. Glass-fronted, made-to-measure joinery is manufactured around your dimensions, so every item you leave open becomes either a change order or a compromise at handover. Three questions frame everything else:
- Where exactly is the wardrobe going, and what does the room constrain - floor level, ceiling height, skirting, doors, switches, air-conditioning grilles?
- What will sit behind the glass, and how much of it do you want visible?
- Who measures, who approves the drawing, who receives the goods, and who fits them?
Section 1 - Scope: confirm the wardrobe is the right product family
Smoked glass set in a slim aluminum frame sits between two other options in our catalogue, and buyers often move between them once the room is measured.
| Option | What it reads like in the room | Choose it when |
|---|---|---|
| Smoked Glass Aluminum Frame Wardrobes | Tinted glass with a defined metal edge; contents are legible as shapes, not details | You want the lightness of glass without displaying every folded garment |
| Clear Glass Aluminum Frame Wardrobes | Fully transparent doors, same frame language | The interior is styled as part of the room and stays tidy |
| Frosted Glass Aluminum Frame Wardrobes | Diffused surface, soft light transmission, no clear view in | Privacy matters more than display, for example a shared or guest room |
| Glass Sliding Door Wardrobes | Glass doors on a track rather than a framed hinged or full-height leaf | The bedroom walkway is too tight for doors to swing clear |
All four sit inside our built-in furniture range and are made to the project's dimensions rather than ordered in fixed widths. That single fact drives the rest of this checklist: you are buying a specification, not a stock line.
Section 2 - The items that must be on the drawing before it is released
Work down this list with your supplier or designer and get each item initialled on the drawing. Anything still blank at sign-off will be resolved on site, which is the most expensive place to resolve it.
1. Verified opening dimensions, taken twice
Record width, height and depth at several points, not one. Floors and ceilings in renovation work are rarely square, and a made-to-measure carcass ordered off a single measurement will show the difference at the scribe. Note finished floor levels, skirting heights, architraves, and any rebate the unit has to sit into.
2. Exact glass tint and frame finish
"Smoked" and "bronze" read differently under warm bedroom lighting than they do on a sample board in a showroom. Our bronze glass aluminum frame wardrobes and the smoked version are close neighbours on a board and a world apart against a dark feature wall. Fix the finish by sample, in the room, at both day and night lighting.
3. Frame profile and colour
Aluminum frames carry the visual line of the whole elevation. Black, graphite and natural-tone profiles change how much the wardrobe reads as furniture or as part of the wall. Match the frame to other metal in the room - bed detailing, door ironmongery, lighting - and record the profile on the drawing so replacement leaves later match.
4. Interior layout, planned around what you actually own
Long-hang for coats and dresses, double hang for shirts, drawers for folded items, shelves for bags, a lit niche for display pieces. Count the items, then set the hanging heights. Glass doors make poor internal planning obvious, so this is the item to over-invest in.
5. Door type and clearance
Hinged leaves need a clear swing; sliding leaves need track depth and wall run. Measure the walkway between the bed and the wardrobe before you commit. Where the room is tight, compare against two tone sliding door wardrobes to see how a mixed material front handles the same opening.
6. Lighting inside and outside the carcass
Glass doors transmit whatever is behind them. Vertical profiles with an integrated cable run, or a separate lighting detail agreed with the electrical contractor, both work - but they must appear on the drawing before the carcass is built, not after installation.
7. Handles or handleless edges
A frame profile can read as the handle. Where it cannot, specify the pull and its position so fingers do not land on glass. Record whether hardware is integrated into the aluminum extrusion or a separate fitting.
8. Edge, corner and fixings detail
Note how the unit returns at corners, whether it butts a window reveal or another cabinet, and how it is restrained to the wall. For an L-shaped room, our L shaped corner wardrobes show how a return is normally resolved.
9. Delivery route and package size
Full-height leaves travel in long crates. Check the lift, stairwell, doorway and turning radius at the property before the crate arrives, and confirm who carries the goods into the room.
10. Installation responsibility and handover
State plainly who fits the unit, who levels and packs it, and what a completed installation is checked against. If your project is being coordinated end to end, furniture installation and after-sales support covers on-site fitting, inspection and snagging.
Section 3 - Procurement items most checklists leave out
The drawing closes the technical questions. These close the commercial ones.
- Consolidated ordering. Wardrobes rarely sit alone on a job. Cabinetry, doors, wall panelling, flooring and lighting all touch the same reveal lines, so ordering them together keeps those junctions in one production run instead of three.
- A named specification sheet per room. One page per wardrobe: elevation, glass code, frame finish, interior layout, hardware. It is the document you compare quotations against.
- Sample retention. Keep the approved glass and profile sample signed and dated. It is how a later batch is checked.
- Change control. Agree in writing what happens if a dimension changes after release, because on made-to-measure joinery that is where cost appears.
How a made-to-measure wardrobe moves from brief to site
Our own route runs through custom furniture design and prototyping first: dimensions and finishes are fixed, a drawing is issued for approval, then the unit enters production. Where a project needs more than wardrobes, we work as a one-stop furniture and building materials supplier, so joinery, wall finishes, flooring and fixtures are specified against the same set of drawings rather than reconciled on site. Freight by sea, air or rail with door-to-door delivery is arranged through the same project coordinator, which keeps the crate-size question answered before dispatch.
For buyers comparing several suppliers on the same drawing, this is also where quotations become comparable: identical glass code, identical profile, identical interior layout, identical inclusions at delivery. Ask each supplier to price against your specification sheet rather than their own standard range.
Before you sign: five checks that catch most problems
- Every dimension on the drawing was taken from finished surfaces, not structural ones.
- Glass tint and frame finish are recorded by code and backed by a retained sample.
- The interior layout reflects a real garment count, with hanging heights written in.
- Door swing or track run is confirmed against the measured walkway.
- Delivery route, installation responsibility and snag inspection are named in writing.
Send us your elevation
If you have a bedroom or walk-in robe drawing and want it priced against this checklist, send the dimensions, glass tint and interior layout and we will return a specification sheet for the smoked glass aluminum frame wardrobe you are specifying, along with matching cabinetry and joinery from the same production run.