A swim spa quotation is only useful when it prices the exact shell, equipment set and site conditions you actually intend to build. Because Outdoor Swim Spa WS-P001 is a configurable model rather than a fixed package, the information you send with the enquiry determines whether the factory can quote it at all. The checklist below is the one our project team works from when a villa, resort or private residence buyer asks for a firm number.
Start With the Model and Its Catalog Baseline
Name the model first. WS-P001 sits inside our configurable outdoor swim and hydrotherapy range, and its published catalog baseline is what we quote against before any options are added:
| Model | WS-P001 |
| Catalog dimensions | 3500 × 950 mm |
| Jet total | 81 pcs |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Control system | 1 set |
| LED lights | 2 pcs |
| Total power | 8.35 kW |
| Features shown on the product page | Water jets, LED lighting, Ozone |
Treat these figures as the catalog baseline for this model, not as a finished specification. A swim training system is not listed for WS-P001 in the catalog, so if lap swimming is part of your programme, say so in the enquiry and we will confirm which configuration supports it.
Send the Site Conditions Before You Ask for a Price
Most back-and-forth on a swim spa quotation comes from site information arriving late. Include these details in your first message and the quotation comes back with fewer assumptions:
- Installation setting. Above-ground on a terrace or deck, semi-recessed, or fully recessed into a pool surround. This changes the shell access, steps and insulation you need.
- Available footprint and access route. The delivered dimensions have to fit through gates, lifts or crane reach, not just the finished location.
- Power supply on site. Voltage, phase and the dedicated circuit available for the equipment. Total power is quoted at 8.35 kW for the catalog configuration; a heat pump or extra pumps change that load.
- Water supply, drainage and local code requirements your engineer must satisfy. We design to what you specify; we do not certify compliance on your behalf.
- Who handles civil works. Foundation, plinth, waterproofing and the plant room are normally local contractors; tell us where their drawings end so we quote the spa accordingly.
List the Options You Want Priced as Line Items
Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each option against WS-P001 rather than assuming it fits. Send your preferred list and we return a quotation with every option as a separate line, so you can cut scope without re-quoting the whole unit.
If your programme needs something outside that list — a different shell shape, a bespoke finish, or a spa integrated into an existing pool terrace — our Custom & OEM Service covers custom design and prototyping alongside standard production. You can also compare the baseline against other layouts in the range, such as a long outdoor swim spa with hydrotherapy and relaxation pool or a customizable-shape outdoor spa, before you commit.
What the Quotation Should Return
When the enquiry contains the model, site conditions and option list above, the reply includes the confirmed equipment schedule for the selected configuration, the delivered dimensions and weight for logistics planning, packaging and container loading details, and a freight quotation to your port or site. Our logistics and door-to-door delivery service covers sea, air and rail forwarding with the customs paperwork your import requires; the commercial terms, duties and transit arrangement are agreed case by case for each destination.
After the Order
Production follows a confirmed drawing set and option schedule, and installation and after-sales support covers on-site guidance, inspection with your contractor, spare parts and ongoing maintenance. Warranty terms, response times and the scope of on-site attendance are stated in the contract for your project, so read them against your programme dates rather than assuming a standard package.
As a one-stop furniture and building materials supplier, we also supply the surrounding outdoor furniture, wall and ceiling finishes, lighting and interior fixtures for the same terrace or spa deck. Coordinating those items in one procurement package keeps finishes, levels and lead times aligned across the whole outdoor area.