A wood grain melamine wardrobe looks straightforward on a drawing: a warm oak or walnut tone, a flush run of doors, clean internal fittings. The difficulty arrives at the quotation stage, when you discover that two suppliers can read the same detail and ship completely different furniture. This guide is written for buyers, builders and project coordinators who need to place wardrobe joinery with a China-based factory and want the finished installation to match the tender documents.

Why Wood Grain Melamine Is Specified So Often

Melamine-faced panel is a decorative paper surface pressed onto an engineered board substrate. Used for Wood Grain Melamine Wardrobes, it reproduces the figure of oak, walnut or smoked timber without the cost and movement of solid boards. That matters in built-in wardrobes, where a long run of solid-timber doors costs more and moves with humidity in a conditioned room.

Three practical reasons drive the specification:

  • Consistency across a run. A printed decorative surface repeats predictably, so doors made weeks apart in the same batch carry the same grain and tone. Solid timber cannot promise that.
  • Surface durability in daily use. The cured melamine layer is easy to wipe down and holds up to the marks wardrobes actually collect: fingerprints, cosmetics, clothing dyes, the occasional knock from a bag strap. Our catalogue separates Matte Finish Melamine Wardrobes from Glossy Finish Melamine Wardrobes precisely because sheen changes how wear reads in a bedroom.
  • Predictable cost per linear metre. On a project with repeating bedroom layouts, panel-based joinery gives you a unit rate that is easier to hold across the bill of quantities than bespoke solid-timber work.

What Your Enquiry Must State Before a Factory Can Price It

Most delays in overseas wardrobe sourcing come from an incomplete first enquiry, not from production. A factory can only quote what you define. Send these items with your request:

ItemWhat to specify
Openings and setoutRoom-by-room dimensions with finished floor and finished ceiling levels, plus a note on which walls are true and which need scribing.
SubstrateThe engineered board behind the melamine surface, and its grade for the environment it sits in. Ask the factory to state what they normally use and why.
Surface and edgeGrain direction, sheen level, and how edges are finished — ABS or PVC edge banding on visible edges, colour-matched to the face.
Door systemHinged, sliding or open. Our Matte Sliding Door Wardrobes and hinged ranges carry different hardware and clearance requirements.
Internal layoutRail heights, shelf spans, drawer banks, and whether the layout is hanging-focused or shelf-focused. Layout drives price more than decoration does.
Fixing interfaceWhat the carcass bears against: stud wall, masonry, plasterboard, or an existing floor build-up. This decides packing and support detail.

Where a design is still open, custom and OEM work lets you develop it with the factory rather than around them. SANTERSON's Custom & OEM Service covers bespoke finishes and textures, prototyping and private labelling for buyers who supply wardrobes under their own brand.

Reading a Quotation Without Getting Burned

Compare quotations line by line, never on the bottom figure. Two quotes of identical value can describe very different furniture.

Check what is excluded

Ask directly whether the price includes plinths, scribes, top panels to ceiling, soft-close hardware, drawer boxes, internal lighting provision and back-panel thickness. These are the items most often moved out of a base price after you have committed.

Check how tolerances are handled

On site, floors are rarely level across a long run. A made-to-measure wardrobe should be quoted with scribing or packing allowance, and the detail should show how the carcass is levelled without exposing an unfinished edge. Confirm dimensions and selected specifications for each project before tooling begins.

Check finish samples against your own light

A wood grain print photographed on a white background tells you little. Order physical samples of the exact surface, view them in the room where the wardrobe will stand, and check both daylight and warm artificial light. Grain prints can look flat or busy depending on lamp temperature. Approve the sample in writing and keep a signed copy — it becomes your reference if a batch arrives off-tone.

Packaging, Freight and Receiving

Wardrobes are panel goods, and panel goods are damaged at the corners. Specify corner protection, panel thickness of the carton or plywood crate, and a packing list that names each panel against its position on the shop drawing. That single step changes unloading from guesswork into sorting.

SANTERSON's Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading plans, shipment tracking and delivery to site. Confirm the Incoterms on your own quotation, along with who carries duty, insurance and last-mile handling — these are commercial terms that vary project by project, not fixed guarantees.

Before you sign: agree in writing which document governs the order — the approved shop drawing or the written specification. When the two disagree, factories build to whichever they were instructed to follow, and so should you.

Installation and Handover

Built-in joinery fails at the interface: where the carcass meets an unlevel floor, where a door rubs a skirting, where a sliding track binds against a carpet pile. Agree who installs before you order. Where we support installation and after-sales on a project, the scope should be written into the contract, including what happens to panels damaged in transit and how replacements are shipped.

At handover, walk each unit with the approved sample and drawing in hand: check door alignment and gap consistency, drawer run, edge banding on all visible edges, and tone match across the run. Snag list against panel numbers from the packing list, not against room names.

A Short Checklist

  • Dimensions taken to finished levels, not structural ones.
  • Substrate and edge treatment stated in the quotation, not assumed.
  • Physical finish sample approved under site lighting and retained.
  • Hardware, plinths, scribes and top panels confirmed as included or excluded.
  • Packing list keyed to shop-drawing panel numbers.
  • Incoterms, insurance and duty allocation agreed before order confirmation.
  • Installation responsibility and replacement process written into the contract.
SANTERSON is a China-based manufacturer of furniture and building materials, supplying made-to-measure built-in joinery for villa, hospitality and office projects, with manufacturing running since 2008. Send us your room setout and finish preference — our Wood Grain Melamine Wardrobes range can be configured to your layout, with material and finish options specified per project. Talk to us about your wardrobe package.