A drawer unit quote is rarely one number. It is the sum of a carcass size, a front style, a finish, a hardware set and a delivery address. The more of those variables you hand over in the first enquiry, the closer the first price is to the final one. This guide lists exactly what our estimating team needs for Santerson Drawer Units, and what happens at each stage when a detail is missing.
Why the Same Drawer Unit Can Carry Several Prices
Drawer units in our Storage Units collection are made to order rather than picked from stock. The product page states that finish, layout and dimensions can be specified for each space, with made-to-measure sizing and material and finish options listed in the configuration. That flexibility is why a single line such as "one drawer unit, 600 mm" cannot be priced: two rooms of the same size can need completely different internals, fronts and fixings.
It also explains why we ask for drawings before quoting. An early figure based on guesswork is not a saving; it is a re-quote later, usually against a fixed programme.
The Site Survey Pack: Dimensions and Clearances
Send measured dimensions taken on site, not from a design intent drawing that has not been checked on the ground. For each location we need:
- The finished width, height and depth of the recess or wall run, stated as minimum, nominal and maximum where walls are out of plumb.
- Finished floor level and finished wall face, including the thickness of the tile, plasterboard or panel build-up that will sit behind and under the unit.
- Clearance in front of the unit for full drawer travel, plus the swing radius of any adjacent door, shower screen or vanity door.
- The position of waste pipes, soil stacks, isolation valves, socket outlets and underfloor heating manifolds that the carcass must avoid or be notched around.
- Ceiling height and the depth of any bulkhead, skirting or cornice the unit has to scribe into.
Where a wall-hung unit is required, tell us the wall construction (stud partition, masonry, or framed with backing timber) and confirm that solid blocking is drawn in at the fixing line. That one line on a drawing decides whether the bracket detail is standard or bespoke.
Layout and Configuration Details
The layout determines the carcass build, so describe it room by room:
- Number of drawers per stack, their heights and which stacks sit beside each other.
- Whether any bay is open shelving, a pull-out hamper bay such as our Pull Out Laundry Hampers, a fitted tray for folded linen or a plain closed drawer.
- Handedness: which side the tall or narrow stack falls on, and whether it changes between room types in the same project.
- How the unit relates to neighbouring items. A drawer unit beside a Santerson Floating Vanity has to share a datum line and a finish; one paired with Santerson Freestanding Cabinets or Santerson Open Storage has to share a carcass depth.
- Adjacent laundry arrangements, if the same joinery run continues into WasherDryer Cabinets or Linen Cabinets. Sharing one drawing set across the run keeps depths and reveals consistent.
Materials, Finishes and Hardware
Our Custom & OEM Service covers bespoke material, finish and texture choices alongside custom design and prototyping. For a drawer unit we need the following named as specifically as you can:
- Carcass and drawer box: substrate and board thickness, plus edge treatment on visible surfaces.
- Fronts: profile (flat, shaker or routed), material, colour or decor reference, and sheen. A RAL, Pantone or a physical sample beats a photograph every time.
- Handles or handleless detail: integrated profile, milled recess, or supplied pulls. If you have a preferred supplier for ironmongery, name the model.
- Runners and closing: side-mount or undermount runners, soft-close or push-to-open, full extension or part extension.
- Interior fittings: dividers, felt-lined trays, matting, or fitted inserts in the top drawer for smaller items.
- Surfaces above the unit: whether a stone or Santerson Stone & Marble Surfaces top is supplied by us, and its thickness and edge profile.
- Lighting: if a lit niche or toe-kick light is wanted, send the switch or sensor arrangement and where the driver may sit.
A note on samples: colour and texture on a screen are not decisions. For any project where the finish has to match existing cabinetry or flooring, request a physical sample of the front and the edge band before you sign off the schedule.
Project Context That Changes the Price
Quantity and repetition affect cost more than any single option, because identical sets are cut together while one-off variants carry their own setup. Tell us:
| What we ask | Why it matters |
|---|---|
| Total units, and how many rooms share one identical configuration | Identical sets are produced as a batch; variants are set up separately. |
| Project type (private villa, apartment, hotel or serviced residence) | Sets the durability expectation, hardware grade and spares quantity. |
| Programme: required on-site date and any staged release | Determines production sequencing and whether partial shipments are needed. |
| Whether drawings come from your architect or need our input | Our Interior Design Services cover space planning, layouts and 3D renderings, plus production coordination. |
| Who installs on site | Decides the level of pre-assembly, fixing packs and instruction detail we supply. |
Delivery Terms and Site Access
Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to the project address. To price it correctly we need:
- Delivery address and the Incoterms you want quoted (FOB, CIF or delivered to site).
- Largest single package dimension and weight, so we can confirm it passes lifts, stairwells and door sets.
- Site access constraints: lift size, loading bay hours, parking restrictions, crane or hoist requirements.
- Import paperwork your customs broker expects, including commercial invoices, packing lists and certificates of origin.
- Whether you want Installation & After-sales Support, or whether a local contractor will fix the units.
A Ready-to-Send Enquiry Checklist
Copy this list into your email and fill it in. A complete pack usually returns a firm quotation without a second round of questions.
- Project name, delivery address and required on-site date.
- Room-by-room schedule: unit type, quantity, width, height, depth.
- Layout sketch or architectural drawing with dimensions and pipe positions marked.
- Carcass, front and finish references, plus handle or handleless choice.
- Runner type and interior fittings per drawer stack.
- Countertop requirement, material and thickness.
- Wall construction for any wall-hung unit.
- Preferred Incoterms and installation responsibility.
- Contact name, phone number and email for the estimating team.
What Happens After You Send It
Enquiries follow the sequence we publish on the site: project brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. Once your pack arrives we review the schedule, flag any dimension or finish that needs clarification, and return a quotation itemised by room so you can compare it against your own bill of quantities.
If a configuration has to change to suit site conditions, that change is priced as a revision rather than absorbed silently. As a one-stop furniture and building materials supplier, we can put drawer units in the same drawing set and shipment as vanities, tall cabinets, laundry joinery, wall panelling, lighting and flooring, so a villa or hotel fit-out runs on one production schedule and one delivery window rather than several.
Send your room schedule and drawings for a quotation.
Contact: PHILLIP · Phone / WhatsApp: +86-13928214007 · Email: santerson@qq.com
Enquiry form: santerson.com/contact