A drawer bank is the part of a fitted wardrobe that fails first when it is specified badly and installed carelessly. Doors can be adjusted, shelves can be re-pinned, but a drawer front that sits out of square or a runner that binds after a few months of use pulls the whole joiner's work into question. If your project schedule includes drawer focused modular wardrobes, the installation plan is where most of that risk is removed — before a single panel leaves the factory.

Below is the working checklist we apply on bedroom and dressing-room joinery packages, written so that a site team, a main contractor and a procurement lead can all read the same document and agree on what "ready to install" actually means.

Start with the room condition, not the wardrobe

Modular wardrobes are made to measure, but they are installed into buildings that were never built square. The plan should record what the site will look like on the delivery date and what has been verified beforehand.

  • Final floor finish level confirmed — screed, tile, engineered timber or carpet, with the actual finished height marked on the wall.
  • Wall plumb and square checked at three points along the run, with the deviation recorded rather than assumed.
  • Skirting removed or scribed, decided in advance and written into the trades schedule.
  • Electrical outlets, switches and downlights repositioned out of the carcass zone before panels go up.
  • Ambient conditions noted: wet trades finished, plaster dried through, and heating running if the fit-out happens in winter.

Drawer runners are intolerant of a racked carcass. Where the wall bows, the plan should state whether the answer is a scribed filler, a packer-and-trim detail or a shadow gap — and who pays for it.

Fix the drawer specification before production starts

A drawer focused modular wardrobe layout lives or dies on small decisions that are cheap to change on paper and expensive to change on site. The installation plan should carry a signed-off drawer schedule, not a drawing alone.

Item to confirmWhy it belongs in the plan
Drawer count and depth per bankSets runner load rating and tells the site team how much clearance each front needs to open fully.
Front height and reveal between drawersDetermines whether handles clash and whether the reveals read evenly across the run.
Runner type — side-mounted or undermount, full extension or partialUndermount runners hide fixings but need a true carcass width; side-mounted runners tolerate more tolerance.
Soft close and push-to-openAffects the gap at adjacent walls and the closing force a resident will feel.
Interior finish and base of each drawerLinen, felt or bare board changes what slides well and how the bank is cleaned after handover.
Handle or handleless detailIntegrated pulls need a finger clearance that has to be dimensioned on the elevation.

Where the layout also includes combination modular wardrobes that mix drawer banks with hanging and shelf modules, note which module carries which function on the plan. Mixed runs are where spares, fixings and finishing trims get miscounted.

Sequence the delivery so the joinery is not the last thing standing in the corridor

Modular wardrobes arrive as panels, carcasses and hardware in separate packs. A plan that lists only "wardrobes, 1 off" gives the site team nothing to work with.

  • Pack list keyed to room and module reference, so a crew can pull one bedroom's worth of material without opening every crate.
  • Storage location named — dry, internal, off the floor, and close enough to the room that panels are not carried through finished areas.
  • Inspection window on arrival: panel edges, finish, hardware quantities and runner sets checked against the schedule while a claim is still possible.
  • Access route confirmed for long panels, including lift dimensions, stair turns and door widths.

For projects ordering from a one-stop furniture and building materials supplier that ships internationally, the plan should also name who handles customs clearance and who signs for the container at the point of delivery. Those two lines prevent the common situation where joinery arrives on site but nobody on the crew has the paperwork or the tools to open it.

Write the installation method into the plan, step by step

This is the part most installation documents skip. A short method statement avoids a crew improvising around a made-to-measure product.

  1. Lay out module positions on the floor and walls from the drawing, marking the datum line.
  2. Install the first carcass as the reference unit — level, plumb and packed — before anything else is fixed.
  3. Join modules with the specified connector, checking square across each pair rather than at the end of the run.
  4. Fit drawer runners to the carcass, then hang fronts and set reveals, working from the centre of the run outwards.
  5. Fit doors, then scribed trims and beading against the wall and ceiling lines.
  6. Adjust every runner and hinge with weight in the drawer, not empty — an unloaded test tells you nothing about sag.

Set a hold point after step 4: drawer fronts aligned and reveals consistent across the whole run. Once trims are fixed, that adjustment becomes a demolition job.

Include the snag list and the handover pack

The installation plan should end with what the client receives, not just what the crew installs.

  • A snag sheet per wardrobe run: drawer operation, front alignment, door closing, finish damage, trim gaps.
  • A spare-parts note — runners, hinges, handles and any matching touch-up material held on site or with the client.
  • Care instructions for the finish and the drawer bases, written in plain language for the end user.
  • Named contact for post-handover adjustment, since a new building settles and drawer fronts move with it.

Where the wardrobe is one item inside a wider fit-out — built-in furniture, cabinetry, flooring and doors ordered together — coordinating those trades in one plan is what keeps the joinery date from sliding.

How SANTERSON supports this stage

SANTERSON is a China-based furniture and building materials manufacturer that has operated since 2008, and supplies project packages for villas, hospitality and office developments. Wardrobe modules are made to measure with selectable material and finish options, and the layout is tailored to the space rather than chosen from a fixed size range.

On a typical package we work through the brief and drawings, confirm specifications and quotation, then move into production, packing and shipment. Dimensions and selected specifications are confirmed with your team before manufacturing begins, so the drawer schedule in your installation plan and the one on our production sheet match.

Planning bedroom or dressing-room joinery for a villa, apartment or hospitality project? Send us the drawings and drawer requirements, and we will price a made-to-measure wardrobe package against your specification.