A wardrobe quote that looks cheap on the first read often turns out to be the most expensive one by the time the units are on site. With glass modular wardrobes, the gap between two quotations rarely shows up in the headline number — it hides in what each supplier assumed about sizes, glass, hardware, and who carries the risk when something arrives wrong. This guide walks through the line items worth reading closely before you sign, using the way we quote these systems ourselves as a worked reference.

Start With the Assumptions, Not the Price

Two quotes for what appears to be the same wardrobe can differ because each supplier solved a different problem. Before comparing figures, check that both quotations answer the same brief:

  • The drawings behind the number. A price without dimensioned elevations is an estimate of an idea. Ask for the layout drawing the quote was based on, with overall width, height, depth and module breaks marked.
  • How the sizes were obtained. Made-to-measure cabinetry should state whether dimensions came from a site survey, contractor-supplied drawings, or your own tape measurement — and who re-measures before production starts.
  • What the modules actually contain. The same external footprint can hold four shelves or twelve drawers. Ask for an interior configuration list per module, not just a front elevation.
  • The scope boundary. State plainly whether the price covers carcass and doors only, or also internal fittings, lighting, plinth, scribes, pack-out, and site installation.

The Line Items That Change a Wardrobe Quote Most

Once the assumptions match, compare these specific items. Each is a place where an attractive quote quietly reduces scope.

ItemWhat a complete quote statesRisk if it is missing
Glass type and buildClear, bronze, smoked, ribbed or frosted glass; single or laminated build; edge finish; whether the glass is framed in aluminium or mounted another wayYou learn at delivery that "glass door" meant a different look and a different safety profile
Frame and panel substrateThe board or aluminium system behind the doors, its surface treatment, and the colour reference usedColour drift between batches, and finishes that do not hold up in the intended room
Hardware scheduleHinge, slide and handle brands or model references, closing action, and load ratings for drawersSoft-close specified verbally but supplied as standard; slides rated below the intended load
Internal configurationShelf spans, hanging rails, drawer counts, and any dedicated zones such as display nichesA wardrobe that fits the wall but not the way the resident actually stores clothing
Made-to-measure tolerancesHow out-of-square walls and floor levels are handled — scribes, adjustable legs, or site adjustment allowanceGaps at skirting and ceiling lines that become a site variation you pay for twice
Packaging and pack-outPanel-by-panel packing list, glass protection method, and crate or carton typeBreakage claims that cannot be matched to a specific panel on the manifest
Delivery termsIncoterms, port or site destination, number of packages, and who unloadsGoods delivered to a port you then have to clear and transport yourself
Installation and after-salesWhether installers attend, what inspection covers, warranty scope and spare-part supplyNo named owner for alignment snags or a failed hinge two years later

Reading the Glass Section Properly

Glass is where most of the visual character sits, and where substitution is easiest to miss. A usable quote names the glass for each elevation rather than writing "glass" once across the whole bill. Wardrobes in our catalogue illustrate why this matters: bronze glass wardrobes and frosted glass wardrobes read completely differently in a bedroom, and they behave differently under bedside lighting and near a bathroom doorway.

Ask three questions of the glass line: what build is quoted (including whether laminated safety glass is included where local practice or the project specification calls for it), what edge and surface treatment is priced, and whether the tint or texture is confirmed by a physical sample before production. A supplier who supplies custom wardrobes routinely should be able to send samples; if they cannot, you are approving a colour from a screen.

Modular Layouts: Check What the Module System Actually Allows

"Modular" is used loosely. In a genuine modular system, the internal fitout is planned around repeatable module widths and heights, which is what makes it possible to mix open display, drawer-heavy and hanging zones without custom joinery at every junction. Our Modular Wardrobes range shows that split — combination modular wardrobes mix closed storage with display, while drawer-focused and shelf-focused layouts prioritise different storage habits.

In the quote, look for whether modules are dimensioned individually. A single lump-sum "wardrobe, 3.6 m wide" tells you nothing about whether the interior was designed or simply divided by three. If a room needs a display niche beside a full-height hanging bay, that should appear as its own module with its own dimensions and fittings.

Commercial Terms Worth Reading Twice

  • What the price excludes. Site preparation, electrical work for internal lighting, making good after installation, and any hoisting or lift access are commonly excluded by default.
  • Payment stages against verifiable milestones. Drawing approval, sample approval, production release, pre-shipment inspection, delivery. Vague "50% deposit" terms with no checkpoints put all the risk on the buyer.
  • Change-order pricing. Ask now what a post-approval dimension change costs, because wardrobe dimensions are the specifications most often revised after the brief is issued.
  • Inspection rights. Whether you or a third party may inspect before shipment, and how non-conformance is resolved.
  • Spare parts and service. Which hardware can be replaced locally, and how replacement panels are re-ordered for the same finish reference.

A practical test: hand two quotations to a colleague who did not write either one and ask them to list what each includes. Where they cannot tell, the quote is ambiguous — and ambiguity in a custom wardrobe specification is always resolved later at someone's cost.

How We Quote Glass Modular Wardrobes

For residential wardrobe projects, our quotations are issued from dimensioned drawings with the interior configuration listed module by module, and with finish, glass type and hardware references stated rather than implied. Sizing is made to measure for each space, and material and finish options are confirmed before production release so that what was approved on paper is what is manufactured. Where a project also needs other built-in cabinetry or finishes, we coordinate those in the same package so that one supplier carries responsibility for the joined-up scope.

If you have drawings or room dimensions ready, send them with your current quotation and we will mark up what is missing rather than simply returning a competing number.

Questions Buyers Ask Us

Should I compare wardrobe quotes by total price?

Only after the scope is identical. Price comparison on unequal scope rewards whoever omitted the most. Align glass build, hardware schedule, module configuration, delivery terms and installation responsibility first.

What drawings should a wardrobe quote come with?

Dimensioned external elevations, an interior configuration drawing per module, and a reflected ceiling or skirting line where the unit meets those surfaces. That combination is what exposes tolerance handling.

Can I change the internal layout after approving a quote?

Usually yes before production release, and at a cost after it. Modular systems make this easier than fully bespoke joinery, but any change reopens drawing approval, so get the change-order terms in writing with the original quotation.

Send us your drawings and current quotation. We will review the glass build, module configuration and scope gaps line by line and return a like-for-like proposal for your wardrobe project.

SANTERSON is a China-based furniture and building materials manufacturer offering custom and OEM service with door-to-door delivery. Contact: PHILLIP, +86-13928214007, santerson@qq.com.