A design brief tells a cabinet maker what the kitchen should look like. It rarely says enough about what has to be manufactured, measured, packed and installed. The gap between those two documents is where cost overruns, rework and delayed handovers come from. Below is the practical path we use at SANTERSON when a client sends mood boards and renderings and asks for a wood grain pvc cabinet quotation — the same sequence applies whether you are fitting out one apartment or a batch of villas and hotel units.

Start with what the brief already gives you

Most briefs we receive from architects, builders and owner-representatives contain three usable items: a visual direction, a room layout, and a completion date. That is a good foundation. What is usually missing is the information a factory needs to cut board — finished heights, appliance schedules, door swing directions, wall tolerances and who is doing the on-site measuring. Turning a brief into an enquiry therefore means converting design intent into a set of confirmable decisions.

Write those decisions down before you contact a supplier. An enquiry that lists rooms, quantities and open questions gets a real quotation within days. An enquiry that says "oak look kitchen, modern, 12 apartments" gets a price per linear metre that nobody can rely on.

The six items a cabinet enquiry must answer

ItemWhat to state in the enquiry
Scope and quantitiesNumber of kitchens, wardrobes or vanity units per project; single unit or repeated typology; whether appliances are supplied by you or excluded.
Site dimensionsMeasured drawings or a survey report, with finished floor levels and ceiling heights. Mark columns, pipes, ducts, skirting and any wall that is out of plumb.
Panel and door constructionFlat panel, shaker profile, handleless or glass fronted. This drives the substrate, the edge treatment and the price band.
Surface and colourTimber species or décor reference, gloss level, grain direction, and a physical sample number rather than a photograph.
Interior fit-outDrawer stacks, pull-out trays, pantry racking, cutlery organisation, lighting channels, hinge and runner preference.
Delivery termsDestination city, port or site address, packaging standard, and whether installation is included or the goods are for a local fitter.

Choosing the construction before you ask for a price

The wood-look look can be achieved on several different constructions, and they behave differently in service. Send the supplier your preferred appearance and let them quote two or three constructions against it, so you are comparing like with like.

PVC-wrapped substrates for a timber appearance

A wood grain pvc cabinet carries a decorative PVC film over the door and panel substrate, with the grain texture pressed into the surface. Because the film is applied as a continuous wrap, edges are covered rather than left exposed, which matters in kitchens where hands, pots and cleaning cloths hit the door faces every day. Our PVC kitchen collection is made to measure, so door heights, drawer fronts and panel sizes follow the site dimensions instead of a fixed module grid, and finish options can be mixed within one project — matte on tall units, gloss on a feature run.

Related variations in the same family are worth asking about when the design calls for something more specific: Santerson Shaker Style PVC Cabinets where the brief asks for a framed, transitional profile, and Santerson Glass Front Pvc Cabinet where display shelving breaks up a wall of solid doors. For external kitchens, poolside pantries and covered barbecue pavilions, ask specifically for Santerson Outdoor Ready PVC Cabinets; the specification there is handled as a separate enquiry because the exposure conditions change the material and hardware selection.

Melamine when the project needs a flat, economical timber décor

Where the design is clean-lined and the priority is a consistent décor across many identical units, Wood Grain Melamine Cabinets are usually the more direct route. The same décor logic carries through to bedrooms in Wood Grain Melamine Wardrobes, which lets a builder match kitchen, wardrobe and media wall panels from one order rather than coordinating three trades.

What the supplier sends back, and in what order

A structured enquiry produces a structured response. Our cooperation steps follow the same sequence on every project: brief and design proposal first, then quotation with detail confirmation, then production, shipment and follow-up.

StageWhat you receiveWhat you must confirm
1. Brief and proposalLayout review, construction recommendation, indicative price range, flagged risks.Budget band, room list, target handover date.
2. DrawingsShop drawings with elevations, section details and appliance clearances; 3D views for the visual decisions.Every dimension, every door swing, every internal arrangement.
3. QuotationItemised pricing by unit, hardware schedule, packaging and freight options.Substitutions you will or will not accept, delivery terms, payment stages.
4. ProductionProduction schedule with a pre-shipment approval stage for colour and sample panels.Sign-off before the full batch is cut.
5. Logistics and handoverPacking list by room, container loading plan, shipping documents, tracking; on-site installation and snagging where included.Receiving arrangements, storage on site, access for installers.

The stage most buyers skip is the second one. Shop drawings are not a formality: once they are signed, change requests become re-cut panels and re-wrapped doors. Build one review cycle into your programme with the design team present, and treat the signed drawing set as the contract document.

A short pre-send checklist

Before you send an enquiry, confirm you have attached or stated:

  • Room-by-room quantities and whether units repeat across floors or buildings.
  • Surveyed dimensions with finished floor levels, not architectural estimates.
  • Appliance schedule with model numbers and clearances for built-in ovens, fridges and dishwashers.
  • Two or three construction options to price, not one assumed solution.
  • A physical or coded colour reference rather than a screenshot.
  • Destination address, packaging expectation and whether installation is required.
  • The date you need goods on site, working backwards from handover.

Why one supplier makes the enquiry simpler

Cabinetry rarely travels alone on a project. The same drawings that define a kitchen also define wardrobes, TV walls, vanities, flooring transitions, wall panelling and lighting positions. Coordinating those items with separate vendors multiplies the number of drawing sets, sample approvals, shipping schedules and snag lists. As a one-stop furniture and building materials supplier, we manufacture cabinetry alongside flooring, wall and ceiling finishes, lighting, bathroom ceramics, outdoor furniture and decorative screens, so one drawing set and one shipment plan covers the fit-out. Our Turnkey Interior Project Solutions cover consultation, design and planning, production, logistics, installation and after-sales as a single scope.

For projects outside China, our Logistics and Door-to-Door Delivery service handles freight by sea, air and rail, export paperwork, container loading plans and shipment tracking to the site address. Freight terms, duties and import requirements are confirmed per destination during quotation — we do not assume they are identical between an apartment block, a boutique hotel and a private villa.

Send the brief, get a buildable quotation

If you have drawings, renderings or even just photographs of the look you want, send them with the room list and dimensions above. We will come back with a construction recommendation, shop drawings and an itemised quotation for review — including the wood grain PVC options if those suit the specification.

Contact SANTERSON to open an enquiry: Contact Us. Phone / WhatsApp +86-13928214007, attention PHILLIP, email santerson@qq.com. Factory and head office in Longjiang, Shunde, Foshan, China, with additional offices in Vietnam, Singapore and South Africa.