A curio cabinet looks simple on a drawing until the site team asks for the glass type, the shelf spacing, the lighting feed and the exact recess it has to fit. That is where custom display furniture usually goes wrong: the schedule says "curio cabinet", the workshop receives a picture, and production starts with three numbers missing. This guide sets out how to write a product specification for Santerson Curio Cabinets that a factory, an interior designer and an on-site installer can all read the same way: item by item, with nothing left to interpretation.

What a Complete Specification Has to Answer

Curio cabinets in the Santerson display cabinets range are configurable rather than catalogue-fixed. The product page for this collection lists made-to-measure sizing, material and finish options, and a layout tailored to each project, which means the specification you send is what actually defines the unit. A usable schedule answers six questions before anyone talks price:

  • Where it sits. Recessed into a joinery wall, freestanding against a solid wall, or fixed to a wall as part of a panelled run. Wall-mounted and built-in units need substrate and load information that a freestanding unit does not.
  • What goes inside it. Porcelain, glassware, books, metal objects, framed art or mixed collectables each ask for different shelf depth, loading and edge treatment.
  • How the objects are seen. Open shelving, glazed frontage, or a lit interior changes the hardware, the glass and the electrical work.
  • How it relates to the joinery around it. A curio cabinet in a living room normally has to match adjacent cabinetry in door profile, veneer or lacquer and ironmongery.
  • Who installs it and when. Built-in units interact with flooring, skirting, wall finishes and services, so the installation sequence belongs in the specification.
  • What is confirmed before production. Sample approvals, shop drawings and sign-off responsibilities, named as deliverables with dates.

The Six Specification Blocks to Fill In

1. Location, opening and clearances

State the room, the wall, and whether the unit is built-in, wall-mounted or free-standing. Give overall width, height and depth as three separate figures, then state the finished floor level the height is measured from and any tolerance on the surrounding opening. For a recessed unit, record the structural opening size separately from the cabinet size; the gap between them is what the installer packs out, and leaving it blank invites either an immovable unit or a visible shadow gap.

2. Interior layout and shelf schedule

Do not specify "shelves"; specify spacing and adjustability. List each bay: number of shelves, clear height between them, whether the shelves are fixed or on adjustable supports, and the intended load per shelf. Tall objects, such as a vase or a standing model, need one bay called out at its own height, otherwise standard spacing wins by default. If a shelf is to carry heavy ceramics or stone objects, say so; it affects shelf thickness and support type.

3. Materials and finish

The collection covers bespoke material and finish selection, so name the exact system rather than a look. Write "matte lacquer in RAL or designers' colour reference X" or "wood veneer, species and grade Y, with grain direction noted", not "grey cabinet". Record the interior lining separately from the exterior. Interior panels are visible through glass all day, and matching them to the carcass is a decision, not an assumption. Where the cabinet must match existing joinery, attach a physical sample reference or a swatch number, and note whether the comparison is made under daylight or artificial light.

4. Glazing and doors

If you want glazed frontage, decide between this curio cabinet line and the Glass Front Display Cabinets in the same collection, then state the choice once. Specify the glass type and thickness the project requires, the opening action (hinged, sliding or lift-up), handle style and finish, and whether hinges are concealed. Also record dust access: how the interior is cleaned, and whether a shelf sits close enough to the glass to be difficult to reach.

5. Lighting and services

For lit interiors, use the Illuminated Display Cabinet configuration as the reference point and specify the lighting in full: fitting type and position, colour temperature, colour rendering if the objects need accurate colour, dimming control, switch or sensor location, transformer or driver position and how it stays accessible for maintenance. Confirm the lighting specification and all electrical details with the project electrician before production, because a driver buried behind a sealed panel is a service call waiting to happen.

6. Installation, access and handover

Record who supplies power and data connections, who carries out fixing to the wall, and what the site must complete before the unit arrives. For upper storeys and tight stairwells, state the maximum single-piece dimension and weight the unit may be built to, so the design stays deliverable. Close the block with the handover items: final shop drawings, sample sign-off records, spare shelf pins or hardware, and the inspection list you will use on site.

Specification Sheet Template

Copy this into your schedule of finishes and fill every cell. Blank cells are the ones that come back as questions during production.

ItemWhat to record
Unit referenceDrawing number, room, tag used on all correspondence and packing lists
ConfigurationBuilt-in / wall-mounted / freestanding; curio cabinet or glass front display cabinet
Overall sizeWidth, height, depth as separate figures; finished floor level datum; tolerance on opening
Structural openingRecess size and wall build-up, substrate type, fixing method, packing gap
Bays and shelvesShelf count per bay, clear spacing, fixed or adjustable, load per shelf, special-height bay
Exterior finishMaterial system, colour or species reference, sheen level, sample approval status
Interior finishLining material and colour, shelf-edge treatment, whether it matches the carcass
GlazingGlass type and thickness, frame profile, door action, hinge type, handle model and finish
LightingFitting type and position, colour temperature, CRI if required, dimming, driver location, access panel
ElectricalFeed location, circuit, switch or sensor position, who terminates the connection
Delivery routeLift or stairwell limits, maximum single-piece size and weight, packaging standard
ApprovalsShop-drawing date, sample sign-off date, production release signature
HandoverSnag list, spares supplied, warranty document reference, as-built changes recorded

Common Gaps That Cause Rework

  • A single dimension. "1200 wide" is not a specification. Width, height and depth relative to a stated datum are.
  • A finish named by look. "Grey", "oak-look" or "black high gloss" cannot be reproduced consistently across batches; a reference can.
  • Lighting left to the last minute. Interior lighting changes panel thickness, cable routes and access; adding it after drawings are issued means cutting finished panels.
  • Matching joinery assumed. If the cabinet must match adjacent doors or wall panelling, both items need the same reference on the same approval date.
  • No installation sequence. Flooring, skirting and wall finishes around a built-in unit must be fixed in an agreed order, or the reveal is decided by whoever arrives first.
Where the specification touches local building requirements, electrical work or load-bearing fixings, confirm those details with the project's local consultant and supplier for the specific site. Product configuration options, materials and finishes should be confirmed against the selected configuration rather than assumed from a photograph.

How Custom & OEM Support Helps You Lock It Down

Santerson's Custom & OEM Service covers custom furniture design and prototyping, bespoke material finishes and textures, and flexible minimum order quantities, with 3D modelling and prototyping described on the service page. Used well, that means a specification can be tested rather than argued: submit the sheet above, receive shop drawings and a prototype or sample for approval, then release production against signed documents. The same route applies when display cabinets are ordered alongside other built-in furniture for a villa or apartment fit-out, so finishes, ironmongery and installation dates sit on one schedule instead of several.

Frequently Asked Questions

Can a curio cabinet be made to an unusual size? Yes. The collection is specified with made-to-measure sizing, so the width, height and depth are set per project, subject to what the wall, doorway and delivery route allow.

Should I specify a curio cabinet or a glass front display cabinet? Choose by how the objects are displayed and accessed. Both sit in the same display cabinets collection and both are configurable; pick one line per unit and record the decision on the schedule so pricing and drawings follow the same item.

What is the minimum information needed for an accurate quotation? Location and configuration, three overall dimensions with a datum, the bay and shelf layout, the named finish references, glazing choice, lighting requirement and the installation responsibility split. Missing items become assumptions, and assumptions change the price after the order.

Can the cabinet match existing cabinetry on site? Provide a physical sample or manufacturer reference for the existing work, state whether the match is judged in daylight or artificial light, and put both items under one approval record.

A specification that records location, layout, materials, glazing, lighting and installation responsibility removes most of the arguments that appear between order and handover. Prepare it once, reuse it across every display cabinet in the project, and let production start from signed drawings instead of a reference photograph.