A glass partitions submittal is the package a contractor, designer or project owner reviews before anything is cut, framed or shipped. When it is complete, approval moves quickly and the opening on site is already prepared. When it is thin, the questions come back one by one, and each round of questions costs days that a fit-out programme rarely has. The checklist below follows the order our own project team works through when we prepare submittals for SANTERSON Glass Partitions and the wider Custom Partitions & Paneling range, so you can send it to your supplier as a request and use it as a review list when the documents arrive.

A practical test before you approve: could a site foreman set out the opening, order the fixings and hang the panels using only this pack, with no call to the factory? If not, something is missing.

1. Scope drawing and setting-out plan

Start with a drawing that shows where each partition sits in the building, not just how it is built. A single elevation of one panel tells you nothing about the wall it has to meet or the floor finish running underneath it.

  • Plan view showing every run, its length and its position relative to structural lines, doors and services.
  • Elevations for each run, with heights measured from a stated finished floor level.
  • Sections through the head, base and jambs, including skirting or floor finish build-up.
  • Coordination with adjoining work: plasterboard walls, tiled walls, joinery, vanities and any door opening next to the glass.

Where a glazed screen forms part of a wet area or a bedroom division in a villa, note the ceiling type above it. A partition that stops below a suspended ceiling needs a different head detail from one fixed to a structural slab, and that difference is decided at submittal stage, not on site.

2. Confirmed dimensions and opening tolerances

Made-to-measure glazing exposes every discrepancy between drawing dimensions and the built opening. A good submittal states both figures and shows how the gap is handled.

  • Drawing dimension and site-verified dimension for each run, with the date the site check was taken.
  • Tolerance band the supplier will work to, plus who takes responsibility if the opening falls outside it.
  • Which party carries out the site re-measure before manufacture is released.
  • Clear opening width for any sliding or hinged leaf, checked against the finished wall build-up rather than the structural opening.

For partition sliding systems, the track allowance at the head is the item most often left out. The ceiling or pelmet has to be built up before the panels are made, otherwise the hardware will not fit and a ceiling has to be rebuilt.

3. Glass build-up and finish schedule

Specify the glazing itself panel by panel. A single line reading "glass partition" cannot be priced, approved or checked on delivery.

  • Glass type and thickness for each location, with clear, low-iron, tinted, frosted or printed finish stated.
  • Surface treatment: sandblasted pattern, gradient frosting, film, or polished arrises and edges.
  • Which face of the glass receives the treatment, so cleaning and jointing details match.
  • Edge detail: polished, seamed, chamfered or mitred, and whether exposed edges face into the room.

If a project mixes finishes across rooms, list them by room number on the drawing key. Finish names taken from brochures are not enough on their own; a sample reference or approved mock-up board removes the argument later.

4. Frames, ironmongery and hardware

The metalwork decides how the glass reads in daylight and how it behaves after years of use. Record it as a schedule with a product reference for every item.

  • Frame material and profile: aluminium frame with glass panel, or frameless with patch fittings and channels.
  • Finish and colour reference, matched to the joinery or door ironmongery schedule where they meet.
  • Handles, pulls, patch fittings, hinges, patches, wall channels and floor guides.
  • Track, rollers and stoppers for sliding panels, with the load rating stated by the hardware supplier.
  • Sealants and gaskets: type, colour and whether they are tooled or left as a shadow gap.

Where partitions sit next to glass sliding doors or glass sliding panels, ask for one hardware schedule covering all of them. Different suppliers often specify visually similar but incompatible tracks, and the mismatch only appears at installation.

5. Structural, safety and performance information

Reviewers ask the same questions here every time, so answer them in the pack rather than waiting to be asked. State what has been tested or calculated, by whom, and against which reference.

  • Glass safety category for each position: toughened or laminated, and where overhead or impact-exposed glazing applies.
  • Fixing detail into the substrate, with the fixing type called out for masonry, timber frame or steel.
  • Load and deflection limits for tall panels, with the calculation or test reference attached.
  • Water exposure details for shower and wet-room screens, including drainage falls and seal lines.
  • Acoustic or fire performance only where the project genuinely requires it, with supporting documentation. Do not expect a decorative partition range to carry ratings that were never tested; ask the supplier to state plainly what is and is not covered.

6. Mock-up, samples and approval route

Fix the approval sequence in writing before manufacture. It protects both sides when a finish looks different at full scale.

  • Sample board: glass offcuts in each finish, frame extrusion pieces, hardware samples.
  • A mock-up panel on site or at the works, with what it proves and who signs it off.
  • The approval chain: contractor, designer, client, and the order in which they review.
  • Long-lead items flagged early, especially printed or laminated glass and imported ironmongery.

7. Manufacture, packing and delivery plan

Glass arrives on the last day of most programmes and has to pass through finished spaces. The logistics section is where avoidable damage gets prevented.

  • Packaging method: stillage type, edge protection, glazing tape, and how panels are identified against the drawing key.
  • Delivery route on site, lifting equipment needed, and access constraints for upper floors.
  • Container and shipment plan for imported work, including packing list and marking that matches the room schedule.
  • Sequence of deliveries where partitions for different levels or buildings arrive at different times.

For projects served from overseas factories, ask for a door-to-door delivery plan covering freight, customs paperwork and the delivery point, so the site team knows which documents travel with the glass. Our logistics and door-to-door delivery service covers sea, air and rail freight, with packing, container loading and shipping documentation handled by a project coordinator.

8. Installation method statement and after-sales terms

Close the submittal with how the work gets built and what happens afterwards.

  • Installation sequence, required trades, and the preparatory work other contractors must complete first.
  • Site conditions assumed: temperature range, level tolerance, curing time for adjacent screed or plaster.
  • Protection regime until handover, and who cleans the glass before practical completion.
  • Snag list process, warranty scope, spare parts availability and maintenance guidance for coatings and hardware.

Submittal checklist at a glance

SectionMust appear in the packTypical gap that causes delay
DrawingsPlan, elevations, head and base sectionsNo finished floor level stated
DimensionsDrawing plus site re-measure, tolerance bandSliding track allowance omitted
Glass scheduleType, thickness, finish, edge detail per panelTreatment face not specified
HardwareFrames, ironmongery, load ratingsTrack incompatible with adjacent doors
PerformanceSafety category, fixings, calculations or testsRatings assumed but never tested
ApprovalsSamples, mock-up, sign-off orderNo full-scale sample before manufacture
LogisticsPackaging, marking, delivery route and documentsAccess to upper floors unaddressed
InstallationSequence, assumed conditions, warranty termsPrerequisite trades not identified

How a single supplier changes the submittal

When partitions, sliding systems, doors and the joinery they meet come from separate suppliers, you receive several packs in different formats, each silent about the others. Coordination then becomes your job, and the errors appear at the junctions. Consolidating that scope with one manufacturer means a single drawing set, one finish schedule and one installation programme. As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, SANTERSON supplies custom partitions and paneling alongside wall panel systems, cabinetry, wardrobes, doors and bathroom fixtures, with custom sizing and finish selection handled through the same project team from design through to installation and after-sales support.

Send this checklist to your supplier as a submittal request. If the returned pack answers every line, you are looking at a manufacturer that has built these screens many times before.

Prepare your partitions submittal with us

Share your drawings, opening dimensions and finish preferences, and we will return a complete submittal pack covering glass build-up, hardware schedule, fixing details, packing plan and installation guidance for your project.