A customizable shape outdoor spa is not a catalogue item you can order from a single line of dimensions. A personalized hydrotherapy pool has to fit a specific terrace, garden or resort deck, carry the right structural support, and arrive with the plant and access arrangements already planned around it. That is why a request for quote (RFQ) for this category needs more information than an RFQ for a standard rectangular plunge pool. The quality of the quotation you receive — and how quickly it arrives — depends almost entirely on how much site and usage detail you supply at the first contact.
This guide sets out what a procurement team, builder or villa owner should put in front of a one-stop furniture and building materials supplier before asking for a price on a made-to-order outdoor spa, and what you should expect to see returned.
Why Shape Is the First Thing You Must Specify
Our Customizable Shape Outdoor Spa, Personalized Hydrotherapy Pool is produced to order in square, round, oval and curved plans, so the geometry of the shell drives everything downstream: how the acrylic shell is formed, how the reinforcement is laid out underneath, where seats and jet lines can sit, how the coping runs, and how many pieces the unit ships in. A buyer who writes "one outdoor spa, about 3 m by 2 m" gives a manufacturer almost nothing to price.
In the RFQ, state:
- The plan shape you want — square, round, oval or free-form curved — and whether it follows an existing architectural drawing.
- Overall external dimensions plus the internal water envelope you need, with a dimensioned sketch or marked-up plan attached.
- Water depth at the seat line and at the deepest point, and whether the profile is flat-bottomed or graded.
- The number of bathers the spa must serve at once, which determines seat count and jet layout.
- Whether the unit sits above the finished deck, is recessed into it, or stands on a prepared plinth.
If your project has a curved or irregular outline, attach the drawing as a PDF or DXF file rather than describing it in words. Curved shells are quoted from drawings; a text description invites a wrong number and a re-quote cycle that costs both sides time.
Site Conditions Belong in the RFQ, Not in a Later Email
Hydrotherapy pools fail far more often because of what is around them than because of the shell itself. Every line of site information you include shortens the specification loop and removes the most common source of variation orders.
| Site item to state | Why the manufacturer needs it |
|---|---|
| Installation location: rooftop, terrace, garden, pool deck or indoor wet room | Determines shell access route, lifting method and whether the reinforcement layout must be increased for a suspended slab. |
| Substrate and load path: concrete slab, timber deck, steel frame or pavers on screed | Fixing detail and support frame design differ by substrate; rooftop positions also require a structural check by your engineer. |
| Access width, stair runs, lift size or crane reach at the delivery point | A one-piece shell that clears a ground-floor doorway may not clear a rooftop landing; access decides whether the unit is built in sections. |
| Local water supply, drainage point and overflow route | Determines plumbing positions for fill, drain and overflow before the shell is formed. |
| Available power supply: single-phase or three-phase, breaker rating, cable run length | Heater, pump and blower loads must match what the site can actually deliver. |
| Exposure: full sun, wind-loaded rooftop, shaded courtyard, coastal spray | Influences finish selection, insulation detail and cover specification. |
| Climate of the project location and whether the spa runs year-round | Sets insulation thickness, heater capacity and freeze-protection approach. |
Send photographs of the prepared or partially prepared area together with the drawing. A set of six site photos routinely answers questions that would otherwise take three rounds of email.
Hydrotherapy Function: Specify the Therapy, Not Just the Jets
"Hydrotherapy pool" covers a wide range of performance. In your RFQ, describe how the spa will actually be used — post-training recovery in a villa gym, guest wellness in a hotel leisure deck, or daily family use — and then state the functional package you want:
- Jet type and count: rotary jets, directional jets or lounger jets, and which body zones they should target.
- Jet zone control: single circuit or separately switched zones for seat, back and foot wells.
- Pump capacity and whether a variable-speed pump is required for low-noise operation near bedrooms.
- Air treatment: blower for air jets, ozone or another sanitisation route, and the filter type you prefer.
- Water heating: heat exchanger tied to an existing boiler or heat pump, or an integrated electric heater.
- Water features and lighting: LED colour scheme, waterfall spout, or a plain water surface.
- Controls: wall-mounted panel, touch panel, or remote control from the deck.
If you are comparing several suppliers on one tender, write this functional list once and send the identical list to each of them. Quotations for made-to-order spas are only comparable when the equipment schedule behind them is identical; otherwise you are comparing different products at different prices.
Finish, Colour and How the Spa Meets Your Deck
Acrylic shell colour, coping detail and edge profile are where a made-to-order spa either blends into a design scheme or stands out as an afterthought. Include in the RFQ:
- Shell colour or finish, with a reference sample, RAL code or a page from your finishes schedule.
- Coping material and profile — matching stone, tile, timber or a flush acrylic rim.
- Overflow arrangement: skimmer boxes or perimeter gutter, which changes both the shell form and the plant room size.
- Access hatch position for equipment service, agreed against your ceiling or deck lining drawings.
Where a spa sits inside a larger fit-out, ask the supplier to coordinate it with the surrounding package. Our outdoor furniture and poolside collections are specified on the same project drawings, so a spa, its loungers and its shading structure can be coordinated from one production schedule instead of three.
Commercial Terms a Serious RFQ Should State Up Front
Buyers often leave commercial detail to the end of the negotiation and then lose weeks. Put these items in the first message:
- Quantity across the project, including any later phases you want priced as options.
- Required delivery window and the on-site installation date the spa must support.
- Incoterms you want quoted — FOB, CIF or delivered to site — and the named port or address.
- Destination country and the import documents your customs broker requires.
- Whether you need the unit crated for container share or loaded as full-container cargo.
- Your payment terms and whether a production sample or prototype is required before the main order.
For projects that also carry bathrooms, kitchens, lighting, flooring and joinery, bundling the spa into a single turnkey interior project solution reduces the number of shipments to track and puts one production coordinator in charge of the whole schedule. Our logistics and door-to-door delivery service covers sea, air and rail freight with the export paperwork handled on our side; you still need to confirm duties, import conditions and final delivery terms for your own country with us in writing.
What a Complete Quotation Should Return to You
Judge the supplier by what comes back. A quotation worth advancing should contain:
- A dimensioned production drawing of the proposed shell in your requested shape, showing seats, jet positions and depth profile.
- An itemised equipment schedule: pumps, jets, filter, heater, blower, controls and lighting, each with a make or model reference.
- Shell, insulation and reinforcement specification stated in material terms, not marketing adjectives.
- Clear unit price, tooling or mould cost shown separately if it applies, packing cost and freight as separate lines.
- Production lead time measured from drawing approval, plus the shipment route and estimated transit period.
- The information you still owe: final drawings, power detail, or site access confirmation.
A quotation that gives one lump-sum figure with no drawing attached is not a quotation for a made-to-order spa. It is an estimate, and it will change once the drawing exists.
Before You Send: A Short Pre-Submission Check
Confirm that your RFQ names the shape, gives dimensioned drawings rather than a rough size, states bathers and water depth, records power and drainage availability at site, lists the jet and treatment package, fixes the finish and coping reference, sets quantity and delivery window, and names the Incoterms and destination. If any one of these is missing, expect a follow-up question before you get a firm number.
Send that package to us with your project location and we will return a production drawing and an itemised quotation for the spa in the shape your site needs — and if the same project also needs poolside furniture, wall finishes or bathroom fixtures, we can price them against one schedule.
Send your drawings and site details to SANTERSON for a made-to-order outdoor spa quotation.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Factory and head office: Longjiang, Shunde, Foshan, China. Contact page working hours are Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).