A request for quote on black high gloss cabinets usually comes back with a number that means very little. Two suppliers can price the same kitchen layout far apart, and the difference is rarely the colour of the door. It is what sits behind the door, how the panel was finished, which hardware was assumed, and what the supplier was allowed to leave out of the calculation. A complete brief produces comparable prices; a sketch with a colour name produces two answers you cannot compare.
Below is the information we need from a purchaser or project team before we can put a serious figure against black high gloss cabinets, and what each item does to the final quotation.
1. The drawings, not just the room size
A floor area tells us nothing about cabinetry. Send the elevations or a measured layout that shows where every run of cabinets starts and stops, including the tall units.
- Linear metres of base units and wall units, plus the height and depth of each run.
- Tall and integrated units: oven housing, fridge housing, pantry or larder, and any full-height storage wall.
- Corner treatment you expect — corner carousel, pull-out magic corner, open corner shelf, or a simple diagonal carcass.
- Appliance schedule with model numbers and cut-out dimensions, so built-in housings are made to the right size the first time.
- Ceiling height, floor-to-ceiling restrictions, skirting, windows, radiators, pipework and any structural column that interrupts a run.
If you have a 3D scheme or a designer's elevation set, send it. Where there is no drawing yet, tell us the room dimensions and we can work from a measured site survey brief; our interior design service covers space layout planning, concept development and 3D renderings before production starts.
2. The finish you actually want, stated precisely
"Black high gloss" covers several different door constructions, and they do not cost the same. Say which one you are buying, or ask us to quote two options side by side so you can see the trade-off. The finish families below each have their own product pages on this site; use them as a naming reference in your enquiry.
| Door construction | What to specify |
|---|---|
| Lacquer / painted high gloss | Number of lacquer coats, polish stage, and whether the reverse face is matched or white. See high gloss lacquer cabinets. |
| Acrylic-faced high gloss | Acrylic thickness, edge banding material and colour match on the return edges. See high gloss acrylic cabinets. |
| Melamine-faced high gloss | Board substrate, edge tape colour code, and whether the surface is scratch-resistant grade. See high gloss melamine cabinets. |
| PVC-wrapped high gloss | Foil grade, wrap direction and edge continuity on routed profiles. See high gloss PVC cabinets. |
| Metallic high gloss | Whether the black carries a metallic flake under the gloss, and on which faces. See metallic high gloss cabinets. |
| Veneer or wood-effect high gloss | Grain direction across the run, and whether grain-matched or random. See high gloss wood effect cabinets. |
| Two-tone scheme | Which runs take the gloss black and which take a contrasting body colour. See two tone high gloss cabinets. This is also where a white high gloss upper run paired with a black base run gets priced. |
For black specifically, state the reference you are working to — a RAL or Pantone number, an existing door sample you can post to us, or a competitor's board code. Black reads differently on lacquer than on acrylic, and a "same black" instruction across two constructions will not match.
3. Carcass, interior and hardware assumptions
The door is only part of the price of a cabinet. The rest is the box and what is inside it, and this is where quotations diverge most.
- Carcass: board type and thickness, edge thickness, carcass colour (white interior or matched to the door), and whether plinths, scribes and filler panels are included or quoted separately.
- Hinges and slides: brand and line, soft-close or standard, opening angle for tall corner units, and drawer runner load rating and travel.
- Handles or handleless: if you want a flush, handle-free front, say so at RFQ stage. Handleless high gloss cabinets need integrated profiles or push-to-open hardware, and that has to be priced with the doors rather than added later.
- Interior fittings: tall unit pull-outs, internal racking, spice and bottle drawers, waste bins, laundry hampers, cutlery trays, and any LED lighting in glass-front or open display units.
- Worktop and splashback: state whether they are in this quotation or being bought locally. Mixed scopes make price comparison impossible.
4. Quantity, project type and delivery terms
One apartment kitchen and a block of identical repeat-layout vanities are not the same order, even with the same door. Give us the count and the context.
- Number of sets or number of units, and whether the layout repeats across rooms or floors. Repeats let us tool up once and price accordingly.
- Project type: owner-occupied villa, apartment for resale, serviced apartment, hotel or hospitality fit-out. This drives the durability grade we specify, not just the finish.
- Delivery terms you want quoted — FOB, CIF or delivered to site — plus the destination port or site address and who handles customs clearance.
- Required arrival window and any phasing, so production slots are reserved against your programme instead of guessed at.
Where we can help: SANTERSON is a China-based manufacturer supplying custom kitchen cabinets for residential and hotel projects, along with other interior fixtures for villa, hospitality and office work. Cabinets are made to measure, with material and finish options and layouts tailored to each project. We also cover freight coordination and door-to-door delivery where the buyer wants a single scope rather than separate supply and shipping contracts.
5. The questions that expose a weak quotation
Before you accept a price, ask the supplier to confirm these in writing. A quotation that dodges them is not complete.
- Is the price per linear metre or per unit, and what exactly is inside that rate?
- Are plinths, scribes, filler panels, valances and end panels included?
- Which side of the door is gloss, and is the reverse face matched?
- What hardware brand and model, and are soft-close hinges standard or an upgrade?
- Who pays for packaging, inland haulage, ocean freight, insurance and duty at your quoted term?
- What tolerance on panel size will be used on site, and who supplies the fixing pack?
- How are replacements handled — a spare door, or a re-made panel with new lead time?
Finish names, board grades and hardware lines follow each project specification. Confirm the selected specification and dimensions against the production drawings before order confirmation; published product pages describe collections and configuration options rather than a fixed standard build.
6. A short RFQ template you can copy
Send these nine lines with your drawings and you will get comparable prices back from every supplier on your list.
- Project name, location, project type and required delivery month.
- Elevations or measured layout, plus appliance schedule with cut-out sizes.
- Door construction and finish reference (lacquer, acrylic, melamine or PVC), including reverse-face treatment.
- Carcass specification, edge thickness and interior colour.
- Hardware brand, line and soft-close requirement; handle or handleless.
- Interior fittings list and any lighting in display units.
- Worktop, sink, tapware: included or excluded.
- Matching joinery elsewhere in the project — wardrobe doors, vanity fronts, tall storage panels — and whether they must come from the same batch as the kitchen doors.
- Delivery term, destination, phasing, and whether installation support is required.
If you are comparing black gloss against a softer surface for the same layout, ask for both on one quotation. A black matte front hides fingerprints in a busy family kitchen and shows fewer swirl marks during site handover, while the gloss front is the one that carries the reflections and the light. The right answer depends on the room, not on which sample looked better in the showroom.
The same logic applies to matching joinery elsewhere in the project. If you are specifying a run of high gloss lacquer wardrobes to match the kitchen doors, ask for the door sample and the edge detail on one sheet covering both rooms, so the lacquer batch, the edge banding and the handle profile are decided once instead of twice. Doors ordered separately for separate rooms can drift in shade even when the finish name is identical.
Send us the brief
Attach your drawings, the finish reference and the quantities, and we will return an itemised quotation with the assumptions written out, so you can compare it line by line against any other supplier's. Our custom furniture solutions cover bespoke material finishes and textures alongside made-to-measure production; for projects that have not reached drawing stage yet, tell us where the site is and what stage it has reached.