A swim spa looks simple on a specification sheet: one model code, four dimensions, a list of jets. On site it is a civil, electrical and waterproofing interface at once. The documentation below is what we ask our own project teams and buyer-side counterparts to have in writing before an Outdoor Swim Spa WS-S12-T leaves the factory gate.
Why this model needs a fuller document pack than standard furniture
Most items in a villa or resort package are accepted against finishes and dimensions. A swim spa is different: it carries water, power and pumping equipment onto a structure that was designed for people. If the procurement record does not capture the interface conditions, the site team discovers them on installation day, when the cheapest fix already costs the most.
The WS-S12-T sits at the long end of our configurable swim and hydrotherapy range, and its catalog entry lists a full jet bank, a swim training system and a combined power figure. Each of those lines has a site consequence: an access route that fits the shell, a distribution board sized for the load, a deck detail that tolerates splash and drainage. Documentation is how those consequences get settled before order confirmation rather than after.
The catalog figures you should be working from
These are the values published on the product page for WS-S12-T. Treat them as the starting point of the conversation, not as a signed-off configuration; options and included equipment change with the specification you confirm.
| Item | Catalog value shown on the product page |
|---|---|
| Model | WS-S12-T |
| Catalog dimensions | 11740 x 2200 x 1470 mm |
| Jet total | 73 pcs |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Control system | 1 set |
| Swim training system | 1 set |
| LED lighting | 1 main light plus 50 small LED lights |
| Total power | 7.65 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Two figures in that table carry most of the site risk: overall length and total power. The 11740 mm shell dictates the delivery route, the crane or lifting path and the finished opening in the deck. The 7.65 kW figure is a catalog value for the configuration shown; the electrical design needs the confirmed equipment list behind it.
Site and structural records to open the file with
- The slab, pad or deck design drawing, signed by the local engineer, showing the point and line loads accepted for the installed weight of a filled spa of this footprint.
- Finished level and dimension checks at the setting-out point: overall length, width, shell height and the clearance needed for the cabinet and any steps.
- The drainage and overflow arrangement around the unit, including how splash-off from the deck returns to the gully.
- Access notes for delivery and lifting, with the route measured against the catalog dimensions rather than assumed.
Electrical and services sign-off
- Circuit rating, protective device selection and cable run confirmed against the equipment list in the ordered configuration, not against a generic figure.
- Supply characteristics at the site board, recorded as measured on site: phase, voltage and frequency available where the spa will land.
- Location of the isolator and control access relative to the deck, agreed with the installer before finishes are fixed.
- Earthing and bonding details from the local electrical contractor, held in the same file as the product data sheet.
Our engineering team issues the wiring requirement for the confirmed configuration; the local contractor remains responsible for compliance with the rules applying at the site. Keeping both documents in one file prevents the common dispute where a site-ready spa waits weeks for a board upgrade nobody recorded.
Configuration, options and what is actually included
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the purchase record should state which of them are in your scope and which you are sourcing locally.
- A line-by-line option list on the quotation, with each item marked included, optional or site-supplied.
- Written confirmation that the swim training system and ozone unit shown for WS-S12-T are in the shipped set.
- Any finish or cabinet selection recorded by name and code, since exterior cladding affects the deck interface.
- The water treatment and dosing regime you intend to run, so insulation and filtration choices match it.
Water treatment, commissioning and handover evidence
- A commissioning record covering pump and jet operation, filter cycle, ozone function and lighting circuits, signed at handover.
- The operator's manual and spares list in the language your maintenance team works in.
- A stated routine for filtration runtime and water chemistry checks, agreed with whoever will run the spa after practical completion.
- Photographs of concealed services before the deck is closed up, filed with the as-built drawings.
Commercial terms worth pinning down early
Because a swim spa crosses categories, it often falls between the furniture package and the civil works package. Settle that in writing: who supplies the base slab, who connects power, who protects the shell between delivery and handover, and how damage claims are raised. Our logistics and door-to-door delivery service covers freight, customs paperwork and container loading; the site-side scope still needs a local party named against it.
If the spa is part of a larger fit-out, group it with the rest of the wet-area procurement. Our one-stop furniture and building materials supply approach exists for exactly that situation: one specification file covering swimming pools and swim spas, bathroom fixtures, outdoor furniture and finishes, coordinated through the same project team.
A short checklist before you place the order
- Structural sign-off for the filled weight, with the engineer's name on it.
- Delivery route and lifting path measured against 11740 x 2200 x 1470 mm.
- Confirmed equipment list and option schedule attached to the purchase order.
- Electrical requirement from our engineering team matched to the site board by your contractor.
- Commissioning, handover and maintenance responsibilities named in the contract.
Next step for your procurement file
Send us the swim spa location drawing and your target configuration, and our project team will return the confirmed equipment list, power requirement and delivery plan for your site. Enquiries through our contact page.