A U shaped kitchen run looks simple on a drawing and complicated on site. Two returns, two corners, three runs of cabinetry and every appliance in between. When the specification only says "U shaped corner cabinets, as shown", the buyer, the drafter and the factory each fill the gap with their own assumption, and the difference shows up later as a change order. The specification below is the one we ask for on our own U Shaped Corner Cabinets enquiries, and it works just as well when you are comparing two or three suppliers.
Why corner units need a specification of their own
Straight cabinets are forgiving. Order a 600 mm base unit and the internal dimensions follow from it. Corner units do not behave that way. Their size depends on the wall return, the door style, the access hardware and how the adjacent run terminates. Two suppliers can both quote "U shaped" for the same room and deliver completely different internal volumes, because one has solved the corner with a rotating shelf and the other has carried the carcase through at a 90 degree angle.
That is why our Custom Kitchen Cabinets for Residential and Hotel Projects range is quoted from a drawing rather than from a room description. The same rule applies whether you are fitting out one apartment kitchen or a repeatable unit type across a residential development.
The seven items every corner specification needs
Written as a short list, these are the fields that remove most of the argument. If any of them is blank, expect a question back from the factory or a surprise at handover.
| Specification field | What to state | Why it changes the price |
|---|---|---|
| Wall-to-wall dimensions | Finished-face measurement of each leg, plus the depth of each run, taken after plaster and floor finishes | Rough-shell measurements can be off by tens of millimetres; the corner carcase absorbs the error |
| Corner geometry | Whether the corner is a square carcase, a blind/angled end unit, or a dedicated corner module | Determines internal volume and whether special hardware is needed at all |
| Access solution | Rotating shelf set, pull-out basket system, or open shelving in the corner | Mechanisms are priced per set and need clearance that fixed shelves do not |
| Door style and opening side | Hinged, sliding, handleless or push-to-open; which leg the door swings from | Affects handle choice, adjacent appliance clearance and reveal lines |
| Panel material and finish | Board type, surface (matte, high gloss, wood grain, lacquer), edge treatment | Film, lacquer and veneer doors are not interchangeable in cost or lead time |
| Hardware schedule | Hinges, slides, soft-close, legs, brackets; brand or grade where required | Bulk projects usually specify a hardware grade once and repeat it across units |
| Interface conditions | Skim boards, scribe fillers, appliance housings, worktop bearing points, splashback cut-outs | Undeclared interfaces become site-made fixes and extra timber |
Choose the corner mechanism before you choose the door
The order matters. Mechanism first, then door style, then finish. A pull-out corner needs side clearance for the baskets to travel; a rotating shelf set needs an unobstructed opening; open shelving needs none of it but shows everything stored inside. Decide what has to live in that corner — pots, small appliances, dry goods, recycling — and the mechanism follows.
- Pull Out Corner Cabinets — baskets travel out of the carcase, so deep storage stays reachable without kneeling and reaching.
- Lazy Susan Corner Cabinets — rotating shelves that bring the rear of the carcase to the opening; useful for pots and infrequently used items.
- Open Shelf Corner Cabinets — no mechanism, lower cost, best where the corner is used for display or everyday items.
- Glass Front Corner Cabinets — glazed doors on a corner unit, typically specified where the corner faces a living space.
These are listed individually in our catalogue so each one can be quoted on its own line. Where the room is closer to an L than a U, the same fields apply and the L Shaped Corner Cabinets line covers that geometry.
How to measure and record the room
For a made-to-measure order, take the measurements in this sequence and put them on one page. A single annotated sketch beats three separate emails.
- Leg A and Leg B: finished-face to finished-face along each wall, recorded at floor level and again at worktop height. If the two differ, note both — out-of-plumb walls are normal and need scribing.
- Run depth: base depth and tall-unit depth separately. A U run often has a deeper leg where appliances sit.
- Corner set-back: distance from each wall to the front face of the corner carcase, which sets what door width is possible.
- Obstructions: soil and waste stacks, flues, radiators, skirting depth, switch and socket positions, window reveal height above the worktop.
- Appliance list with model numbers: not "an oven" but the actual external dimensions and door opening direction. Built-in ovens, dishwashers and fridges each have their own housing requirement.
- Worktop and splashback: material, thickness and where the joint lands across the corner.
Send the drawing as a PDF or DWG with the dimensions written on it. Once we have it, we return a production drawing for your sign-off before any panel is cut, so the numbers in your specification and the numbers in the factory are the same numbers.
Materials, finishes and hardware to name in writing
Panel material and surface finish are where a quotation can look comparable and not be. State the board type, the surface system and the edge treatment for each door family, and keep the naming consistent across the whole order.
- Surface: matte solid colour, high gloss, wood grain melamine, lacquer or veneer. Matte and gloss doors in the same colour are not the same product line.
- Edge: ABS edge banding, wrapped or painted edge; on gloss and veneer this is visible at the reveal.
- Handle detail: handleless profile, integrated rail, or push-to-open. If you want a clean frontage across the corner run, specify it once and apply it to every unit — see Handleless Minimalist Kitchen Cabinets for that treatment.
- Fittings: soft-close on hinges and drawers, load rating on slides, adjustable legs and connecting brackets. For project work we supply the matching hardware with the carcases so it arrives in the same consignment.
What a complete specification unlocks from your supplier
A complete spec is not paperwork for its own sake. It is what lets a manufacturer quote accurately, and it is what makes a turnkey scope useful rather than theoretical.
- An itemised quotation. With the mechanism, material and hardware declared, prices arrive per line and you can compare like for like between suppliers instead of comparing lump sums.
- A production drawing for approval. Corner geometry, door swings and appliance housings drawn to your dimensions before cutting starts.
- Cross-trade coordination. Plumbing, electrical and tiling positions come off the same drawing, so sockets do not end up behind an oven housing.
- Packaging and delivery planning. Known carcase sizes mean known carton counts and container loading, which matters on door-to-door orders. See our Logistics & Door-to-Door Delivery service page for the scope we handle.
- A defined handover. Installation, inspection and snag lists are checked against the approved drawing rather than against a verbal brief. Our Installation & After-sales Support page sets out that stage.
If the corner is part of a larger fit-out — cabinetry, wall panelling, doors, flooring and lighting for the same property — one consolidated specification across all of it prevents the same misunderstanding repeating in each trade. That is how we run One-stop Solution projects, with a single detail-confirmation step before production.
Common specification gaps and what they cost
| Gap in the specification | What usually happens on site |
|---|---|
| Measurements taken at rough-shell stage | Scribe fillers cut on site; visible gaps at the ceiling and the wall return |
| No appliance models given | Housing sizes wrong; a built-in oven that will not vent or a dishwasher door that fouls the corner door |
| Mechanism left to the supplier | A rotating shelf set installed where pull-out baskets were expected, with no way to reach the rear of the carcase |
| Finish named by colour only | Gloss and matte doors delivered in the same colour code but with different reveals and edge lines |
| Hardware not scheduled | Substituted hinges and slides, then a mismatch when spare parts are ordered later |
Dimensional tolerances, hardware grades, material certifications, lead times and warranty terms vary by project and by market. Confirm these for your specific order with our team before placing it; nothing above should be read as a stated guarantee.
Send us your corner dimensions
If you have a U shaped kitchen run to price, send the annotated dimension sheet, the appliance list and the finish you want. We will return a production drawing and an itemised quotation covering carcases, mechanisms, doors and matching hardware — including U Shaped Corner Cabinets made to your measurements. Contact details are on our Contact page.