A stacked laundry unit looks like a small item on a commercial take-off sheet, and that is exactly why it gets mispriced and mis-specified. The quotation line usually says one thing - "stacked laundry cabinet" - while the real cost and the real site risk sit in what the drawing behind it does or does not say: which appliances sit inside, how their doors swing, where the services run, and who carries the panel finish through to the corridor wall. The Stacked Laundry Units in our Laundry Integration collection are made-to-measure for each project, so the proposal we return is only as good as the information supplied with it. The checklist below is the one we use from the manufacturer side, and reading a quotation against it will save you a variation order later.
1. Confirm what the line item actually covers
Before comparing prices, compare scopes. Two proposals for the same room can differ by a wide margin because one includes only a carcass and the other includes the full assembly. Ask each supplier to state, in writing, whether the price covers:
- the cabinet carcass, doors and internal fittings, or the carcass alone;
- the worktop or cover panel, and its material;
- appliance housings, ventilation voids and access panels;
- cut-outs and provisions for water supply, waste and electrical outlets;
- skirting, scribes and the finishing pieces that meet wall and floor;
- hardware brand and grade, soft-close specification and hinges rated for the door height;
- packaging, crating and the container or pallet configuration.
A proposal that lists only dimensions and a unit price cannot be compared with another one. Request a bill of materials per unit, so that when you move from the sample floor to the production batch you are checking the same list you approved.
2. Check the sizing basis, not just the numbers
Stacked units fail on site for one of two dimensional reasons: the appliance envelope was taken from a catalogue image rather than the actual model, or the finished floor level was not fixed when the cabinet height was set. A proposal is credible when it shows the reference it worked from — clear opening heights, allowance for the machine feet, and a stated tolerance for the installation gap. Where the unit sits in a stack against a ceiling, ask how the top is closed and whether a removable panel gives access to services above.
Our units are made to measure, with layout, dimensions and finish specified per project. That flexibility is an advantage only if the drawings you send are at the same stage as the quotation. If the room layout is still moving, say so on the request for quotation and have the supplier note which figures are provisional.
3. Read the material specification against the room's real conditions
Laundry rooms in apartment blocks, staff quarters, serviced apartments and villas run warm and humid, and doors get used hard by people who have no reason to be careful. The proposal should name the substrate, the board thickness, the edge treatment and the surface system — not just "moisture resistant panel". Ask specifically for:
- the board type and thickness for carcass, doors and shelves;
- edge banding material and adhesive method, since lifted edges are the first failure in a wet room;
- the finish system — lacquer, laminate, melamine or veneer — and how it is specified for the rest of the project's cabinetry, so the laundry does not introduce a fourth variation of the same colour;
- hardware corrosion protection where the room has no mechanical ventilation.
Where the proposal offers a choice of material and finish, ask for the options to be priced separately rather than bundled. A cheaper board with better edge detailing often outperforms a more expensive board with a poor seal, and you cannot see that trade-off in a single line total.
4. Test the drawing package before the price
The fastest way to judge a supplier's competence is the quality of what they send back after your enquiry, not the number they quote. A usable proposal for this category includes elevation drawings for each unit type, a plan showing door swing and circulation clearance, appliance locations with services marked, and finish references tied to the project schedule of finishes. If only a photograph of a similar previous job arrives, treat the price as indicative.
This is also where coordination problems surface early. A stacked unit shares a wall with a bathroom or kitchen wet zone; whoever draws the elevation will discover whether the waste stack conflicts with the cabinet side panel. Resolving that on paper costs nothing. Resolving it after the tiler has finished costs the whole wall.
5. Compare how delivery and installation responsibility is drawn
For multi-unit projects, laundry cabinets arrive in the same shipment as vanities, wardrobes and tall cabinets, and they are usually among the items last needed on site. The proposal should state how the units are packed and identified by room or unit number, where they are handed over, and what happens if a crate is damaged in transit. Where the same supplier also provides other joinery for the building, ask them to confirm that the laundry carcass colour and door profile are produced from the same batch as the kitchen and bathroom cabinetry.
Clarify who installs. A supplied-only price and a supply-and-fit price are not comparable, and a supplier who will coordinate on-site installation and inspection removes one interface you would otherwise manage yourself.
6. What a complete proposal should contain
| Element | Acceptable | Weak |
|---|---|---|
| Scope | Bill of materials per unit, exclusions listed by name | Unit price with a photograph only |
| Dimensions | Elevations with clear openings and stated tolerances | Overall width, height, depth in one line |
| Materials | Substrate, thickness, edge treatment, finish system named | "Moisture resistant" with no further detail |
| Hardware | Brand or grade, hinge count per door, soft-close scope | "High quality fittings" |
| Appliances | Model envelope confirmed by the client's appliance schedule | Catalogue image of a generic machine |
| Delivery | Packing method, room-number labelling, handover point | "FOB" with no further detail |
7. Where the other Laundry Integration products fit
Not every unit type in a project should be stacked. In compact rooms, Compact Laundry Solutions keep the footprint to a single column and free the circulation space; where residents also need somewhere for sorting and storing supplies, a Laundry and Storage Combo carries that storage in the same run instead of adding a second loose cabinet. Comparing these three across the unit mix — rather than specifying one type for every room — is usually where the commercial gain appears, because the smaller typologies are cheaper to build and easier to site within an existing riser.
Before you award: send the same appliance schedule, the same set of finished floor levels and the same schedule of finishes to every bidder. Most price gaps in this category are not margin — they are scope differences that only become visible when the inputs are identical.
Next step
If you are pricing a laundry provision for apartments, serviced apartments, staff accommodation or a villa scheme, send us the room layout, the appliance models and the joinery finish schedule. We will return elevations for each unit type with dimensions and material options priced separately, so your comparison sheet is built on the same basis for every bidder.
Product dimensions, finishes and specifications are confirmed per project at quotation stage; figures shown in drawings and samples are indicative until approved.