A folding door that folds flat against a wall and still reads as a piece of joinery is hard enough to specify at home, let alone order from a factory two time zones away. This guide walks through exactly what to send an overseas manufacturer so the Santerson Wood Veneer Folding Doors you approve on a drawing is the door that arrives on site, opens correctly and matches the cabinetry around it.

What You Are Actually Ordering

The wood veneer folding door sits inside SANTERSON's folding doors collection alongside Classic Folding Doors and Glass Folding Doors. The product page describes it as a made-to-measure residential door: finish, layout and dimensions are specified per project rather than chosen from a fixed size chart. The configuration options listed are made-to-measure sizing, material and finish selection, and a layout tailored to the opening.

That single sentence carries most of the procurement risk. There is no standard width to fall back on, so every dimension, hinge side, panel count and veneer match has to be agreed in writing before production starts. Treat the quotation as a specification document, not a price line.

Step 1: Send the Opening, Not the Idea

Start with measured drawings of the opening rather than a photograph and a rough estimate. For each opening, provide structural depth and clear width at three points across the span, finished floor level, the wall build-up (plasterboard, brick, framed partition), and where the door head meets the ceiling or soffit. Note anything that interferes with the folding path: skirting, architraves, light switches, radiators, curtain rails, or a tiled reveal.

State the intended use in plain words — wardrobe closure, pantry, room divider between study and bedroom, closet in a guest suite. Panel count and folding direction follow from that. A door used daily in a main bedroom takes different hardware handling than one opened twice a month in a store cupboard.

Step 2: Fix the Veneer Before You Fix the Price

Veneer is where remote orders go wrong most often, because two samples can share a name and look nothing alike under site lighting. Decide these before confirming the order:

  • The species and cut — plain sliced, crown cut or quarter cut changes the grain figure across the panels.
  • The tone range. Ask for the tone to be matched against a reference you hold: a sample offcut, an existing cabinet door, or a colour from your schedule.
  • The finish — matte, satin or gloss — and whether the veneer is sealed on all faces, which matters in a wardrobe next to an external wall.
  • Grain direction across the panels, and whether panels are to be grain-matched as a set.

If the same veneer appears elsewhere in the project — Dark Tone Veneer Cabinets, Wood Veneer Panels on a wall, or veneer wardrobes — order those from the same batch and say so on the purchase order. Panels cut from different lots of the same species will not read as one continuous surface once installed side by side.

Ask for a physical veneer sample and a door corner sample before releasing production, and pay for the courier. A printed photograph on a screen cannot settle a grain or tone decision, and it is far cheaper to correct a finish at sampling stage than after a container has shipped.

Step 3: Specify the Mechanism as Carefully as the Face

The visible face sells the door; the track decides whether it still works in year five. Confirm with the factory:

  • Whether the door is top-hung or bottom-rolling, and what floor finish you are laying so the threshold detail can be resolved.
  • The load rating of the hinges and track against the finished panel weight at your panel thickness.
  • Number of panels in the fold, which panel carries the leading edge, and where the door stacks when open.
  • Whether an integral handle, recessed pull or magnetic catch is required, and whether a lock is needed for a bathroom or office application.
  • The adjustment range on the hardware, so the fitter can true up the leaves on site after building tolerances are discovered.

Step 4: Agree the Drawing Approval Gate

Before cutting anything, require a production drawing showing elevation of every leaf, overall and clear opening dimensions, hardware positions, veneer grain direction marked on each panel, and the edge detail where the leaves meet. Read it against your own site survey. This one approval step is what turns a made-to-measure order into something you can hold the supplier to.

SANTERSON's design and project coordination service covers drawings, production coordination and on-site guidance, with cooperation running from project brief and design proposal through quotation and detail confirmation to production and shipment. Use that stage deliberately — request the drawing even if your own drawings were already sent.

Step 5: Packaging, Freight and Receipt on Site

Folding doors are a poor freight item if they are packed carelessly: thin leaves, exposed edges, hardware fixed to the face. Ask for edge protection on every leaf, hardware bagged separately with fixings labelled by door set, and each set marked with the room it belongs to rather than a generic carton number.

SANTERSON lists sea, air and rail freight forwarding with customs paperwork, packing lists, certificates of origin and container loading planning. Confirm the Incoterm on your quotation, who holds the import clearance, and whether cargo insurance is included or quoted separately. Transit terms and duties differ by destination and should be settled case by case rather than assumed.

On arrival, check each set against the packing list before the installer opens it: leaf count, veneer face for transit damage, hardware inventory, and dimensions against the approved drawing. Report discrepancies with photographs while the packaging is still intact.

Step 6: Installation and Snagging

Give the fitter the approved drawing, not just the boxes. Head track level is the single most important setting on a folding door; if it is out, no amount of hinge adjustment will make the fold sit neatly. Check that the head track is set to the finished floor level you specified, that each leaf folds without binding along the full travel, and that the meeting stiles close flush.

SANTERSON's after-sales scope covers on-site installation support, inspection and snagging, warranty coverage, spare parts and replacement, and ongoing maintenance. Response times and warranty terms vary by project and region, so get the applicable terms in writing for your order rather than relying on general website copy.

Buyer Checklist Before You Release the Order

  • Measured opening dimensions at three points, with wall build-up and finished floor level confirmed
  • Veneer species, cut, tone reference and finish signed off from a physical sample
  • Panels ordered from the same batch as matching cabinetry or wall panelling
  • Hardware type, load rating, panel count and folding direction specified
  • Production drawing approved in writing, with grain direction marked
  • Incoterm, insurance, import clearance responsibility and delivery address agreed
  • Room-by-room labelling on cartons and a packing list matched to the drawing set
  • Snag period and after-sales terms stated on the order documents

Ordering More Than One Door Type Together

Where a project mixes door types, keep the veneer consistent across them. The same wood veneer finish is available in hinged and pocket formats, so a folding closure to a dressing room, a hinged door to the en-suite and a pocket door to the study can be specified as one joinery package with matching grain and tone. Ordering those together from one factory removes the matching problem that appears when they come from three different suppliers on three different delivery dates.

Send your opening dimensions, finish reference and project schedule to SANTERSON for a made-to-measure quotation and production drawing review before any panel is cut. Contact details are on the contact page.