A swim spa sits between a pool and a spa in one deliverable: shell, pumps, jets, controls, lighting and insulation arriving together, usually crated as a single unit. That makes the shortlisting exercise different from buying loose furniture. You are not only comparing a cabinet finish or a fabric swatch; you are comparing how each manufacturer defines the equipment inside the quoted price, and how much of that definition you can hold them to in writing. This guide uses our Outdoor Swim Spa WS-S06B-T as the worked example, so every question below can be tested against a real specification sheet rather than a brochure promise.
Start With the Site Envelope, Not the Model Number
Model codes in this category are short and easy to confuse: WS-S06B and WS-S06B-T sit next to each other in a catalogue, and one letter can change depth, equipment set and connected load. Before you ask anyone for a price, fix the physical envelope of your own installation. Our catalog lists WS-S06B-T at 5800 x 2200 x 1420 mm overall.
Write down four numbers for each candidate position on site: the clear internal footprint you can give the vessel; the finished water level you want relative to the surrounding deck; the access route from the delivery vehicle to that position; and the plant space left for pumps, filtration and any heat pump. A supplier who receives those four numbers answers differently from a supplier who receives only "a 5.8 m spa". The first reply comes with a setting-out drawing; the second comes with a price.
Read the Equipment List Line by Line
The specification area for WS-S06B-T on our site records one control system, one swim training system, one water pump, one filter pump, 40 jets in total, three LED lights plus 26 small LED lights, and a total power figure of 8.75 kW. Treat that kind of table as the minimum evidence you should expect from any manufacturer you shortlist, and check four things about it:
- Counts, not features. "Water jets" is marketing copy. "40 pcs" is a quantity you can compare, cost-engineer and inspect against at handover.
- What the power figure covers. A total connected load of 8.75 kW is the number your electrician designs the supply around. Ask whether the quoted figure includes an optional heat pump or excludes it; two suppliers quoting "the same" spa can differ by several kilowatts once that choice is made explicit.
- Which systems are standard and which are options. The swim training system on WS-S06B-T is listed as included. On other models in the range the equivalent line may be blank, because equipment sets genuinely vary between variants of the same shell size.
- Whether dimensions are overall or internal. A 1420 mm depth reads very differently depending on which one it is, and seat heights and swim-channel length follow from it.
Compare Two Variants of the Same Shell to Test a Supplier's Rigour
The most useful shortlisting test is also the simplest: ask each candidate manufacturer to quote two adjacent models from their own range and explain the difference in their own words. Take our Outdoor Swim Spa WS-S06B beside WS-S06B-T. Both are catalogued at 5800 x 2200 mm overall, but the depth is 1250 mm against 1420 mm, and the equipment behind those shells is arranged differently.
| Item | WS-S06B | WS-S06B-T |
|---|---|---|
| Catalogued overall dimensions | 5800 x 2200 x 1250 mm | 5800 x 2200 x 1420 mm |
| Water pumps / filter pump | 3 pcs / 1 pc | 1 pc / 1 pc |
| Total jets | 48 pcs | 40 pcs |
| Total power | 13.35 kW | 8.75 kW |
| Features shown on the product page | Water jets, LED lighting, Ozone, Waterfall | Water jets, Temperature setting, LED lighting, Ozone, Swim training system |
A shallower shell built around three pumps and a waterfall feature, and a deeper shell listed with a single water pump and a swim training system, are different machines wearing similar model numbers. A supplier who walks you through that difference is doing engineering; a supplier who says "both are 5.8 m spas" is selling from a price list. Use the answer to decide which conversations are worth continuing.
Put Every Option in Writing Before Price Comparison
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option that exists on WS-S06B-T may not bolt onto another shell without a design change. Ask each shortlisted manufacturer to price the same option set and to state, for each line, whether it is factory-fitted, shipped loose for site installation, or unavailable.
Insulation and heat pump choices deserve particular attention because they move running cost rather than purchase price, and a supplier who cannot explain how the shell and lid are insulated has not thought about your operating season. Insulation detail, filtration type and sterilisation method are the three places where quotations that look identical often turn out to be different machines.
Score Suppliers on Delivery and After-Sales, Not Just Specification
A swim spa that arrives undamaged is only half the job. Crating and container loading, customs paperwork, and a delivery address where a crane or forklift can actually set the vessel down all decide whether the project date holds. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail with the paperwork that goes with it; ask any other shortlisted supplier to name their forwarder arrangement, packing standard and what they hand you on arrival.
Then test the back end. Commissioning support, a spare-parts position for pumps, jets and controls, and a stated route for warranty claims are worth more than a marginally lower quotation, because a swim spa is a mechanical plant item inside an architectural finish. Our installation and after-sales support page sets out how that stage is handled on our projects; whatever you buy elsewhere, get the same three answers in writing: who commissions the unit, who supplies spares after year two, and what the warranty actually excludes.
Shortlist With a Single Comparison Sheet
Run every candidate through one sheet, filled in only from what they send you: overall dimensions and depth; jet count and pump count; swim training system included or not; total connected load and whether the heat pump is inside that figure; insulation and filtration method; options priced versus excluded; crating and delivery scope; commissioning and spares commitment. That sheet, rather than a first impression of price, is what reduces a long list to two suppliers you can actually compare, because it exposes which quotations were built from a specification and which were built from a photograph.
If you are specifying several villas or a resort wellness area at once, the same sheet doubles as your turnkey project procurement baseline. Swim spas rarely arrive alone: they sit in one programme and often one shipment alongside outdoor furniture for villas and resorts, pergolas and poolside loungers, all of which have to be coordinated with the same deck levels and the same site dates.
One more reality check before you sign. Catalogue pages in this category publish shell dimensions, equipment counts and a power figure, but they do not tell you how your local supply authority wants the circuit protected, or whether your certifier requires a barrier around a vessel of this depth. Those are your project's questions, not the manufacturer's; the manufacturer's job is to give you accurate load, weight and dimension data so your engineer can answer them. Judge the shortlist on how completely that data arrives.
Send us your site envelope. Share the clear footprint, desired water level, access route and plant space for your project, and we will return a configuration sheet for WS-S06B-T or the closest fit in the range, with equipment included and excluded stated line by line.
Start the conversation: contact SANTERSON.