A wardrobe quotation goes wrong long before the doors arrive. It goes wrong in the brief. Two projects can order the same Flat Panel Hinged Wardrobes and receive completely different furniture, because one buyer specified a finish code and a carcass depth while the other wrote "white, modern, built-in." This guide sets out what to send a China-based manufacturer so that flat panel hinged wardrobes are made to your drawings the first time, and what you should expect back in return.

Why flat panel hinged doors reward a precise brief

Flat panel doors have no mouldings, no raised field, no decorative routing. That simplicity is exactly why they are unforgiving: a full-height slab door shows every deviation in substrate flatness, edge treatment and surface finish, and a hinged opening puts the whole leaf weight on hinges for years of daily use. Panelled alternatives hide tolerances in their profiles; a flat panel exposes them. So the specification you send is not paperwork — it is the quality control.

SANTERSON's Hinged Door Wardrobes collection, which includes Flat Panel Hinged Wardrobes, Classic Wooden Hinged Wardrobes and Two Tone Hinged Wardrobes, is listed as made-to-measure, with material and finish options and a layout tailored to each project. That wording matters: nothing about these wardrobes is standard, so the burden of definition sits with the buyer. The product page itself closes with an instruction to confirm dimensions and selected specifications for each project.

The six items every enquiry should contain

ItemWhat "complete" looks like
Room scheduleA line per wardrobe: room or unit number, opening width, height, depth, and whether the carcass is recessed, alcove or surface-mounted.
Door layoutNumber of leaves, hinge side for each leaf, which bay takes the mirror or glass panel, and door widths in millimetres.
Internal fit-outHanging rail heights, shelf positions and depths, drawer banks, trouser or jewellery units, lighting provisions, and any integrated ironing or valet hardware.
Finish definitionNamed substrate, named surface system (lacquer, laminate, veneer), colour code or physical sample reference, sheen level, and grain direction on any wood-effect door.
Interface conditionsFloor finish build-up at the threshold, skirting treatment, ceiling level and whether the carcass runs to structural slab or to a set-down for cornice.
Delivery and accessShip-to address, Incoterms basis, container or consolidated preference, lift and stair dimensions on site, and the room each component must reach.

Send those six items and a manufacturer can price accurately. Send three of them and you will receive an indicative number that changes after tooling, plus furniture that arrives correct in spirit and wrong in millimetres.

Specify the door, not just the colour

For flat panel hinged doors, ask three questions the finish sample cannot answer. First, what substrate carries the leaf — a laminated particleboard core, an MDF core, or a solid-timber frame with a panel infill? Substrate decides whether a 2.4 m leaf stays flat through a humid summer. Second, how is the edge handled — ABS, lacquer-wrapped, or a matching profile? Edge detail decides how the door reads at close range and how it survives being brushed daily. Third, what hinge set and load rating is quoted, and does the quotation include the soft-close hardware or list it as an option?

Write the answers into the brief rather than accepting them in a sales call. If your drawings show a full-height door over 600 mm wide, say so explicitly and ask the factory to state the hinge quantity and anti-sag provision for that leaf. A manufacturer working from a dimensioned drawing will respond with a technical comment; one working from an adjective will respond with a price.

Get the carcass and the interior agreed before doors are cut

Hinged wardrobes fail in practice at the inside, not the front. Confirm hanging heights against the actual user — long-garment zones, double-hang zones for shirts and skirts, shelf depths that suit folded knits rather than a generic 350 mm. Confirm drawer bank positions relative to the door line so runners are not obstructed by a hinge plate. If integrated lighting is wanted in display niches or above rails, state it now: cable routes and transformer access have to be built into the carcass, not retrofitted on site.

SANTERSON's Custom Minimalist Bedroom Wardrobe page is framed around modern storage solutions built to a project's layout, and its modular entries — shelf-focused, drawer-focused and combination layouts — are catalogued separately. Use those category pages as a starting vocabulary when you describe internal zoning; naming the configuration type speeds up the drawing loop.

What a competent manufacturer should return

  • A dimensioned shop drawing per wardrobe, with door swing clearances and handle or pull detail marked.
  • A material schedule listing substrate, surface system, edge treatment, hardware brand or grade, and finish code.
  • A quotation broken into carcass, doors, interior fit-out, hardware and packing, so substitutions are visible rather than buried.
  • An explicit list of what is excluded — site measurement, installation labour, import duty — stated in the document, not implied.
  • A sample or physical finish reference before production release, especially for lacquered and veneered doors.
One practical note on finishes: gloss and high-gloss surfaces show handling marks and require careful packing and on-site protection, while matte and textured surfaces are more tolerant of daily contact. Decide this per room — a children's corridor wardrobe and a master suite rarely want the same sheen — and record it in the schedule.

How the order actually moves

SANTERSON describes its cooperation steps as project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Read that sequence as a checklist for your own file: your brief is only as strong as the confirmed detail sheet that closes it. Before releasing production, ask for one document that carries the final drawings, the material schedule and the hardware list together, signed off by whoever on your team controls the design intent. That single page prevents the most common dispute — two versions of a drawing circulating in two languages.

If your project needs more than wardrobes, bundling pays coordination dividends. The same supplier covers built-in furniture, wall finishes, flooring and sanitary fixtures, which means one drawing set governs the interface between wardrobe carcass, skirting, architrave and floor build-up. When those items are ordered together, the tolerance chain is decided once instead of three times.

Questions worth asking before you commit

Ask how made-to-measure sizing is verified — whether you supply site measurements or the factory works purely from your drawings, and who signs the dimension sheet. Ask what happens if a leaf arrives out of flat: replacement, on-site correction, or an allowance in the price. Ask how doors are packed for a long sea leg and whether they travel loose or pre-hung to the carcass. Ask which hardware is stocked as spare, because hinge and runner replacements decide the wardrobe's second decade.

Ask these questions in writing and keep the answers attached to the purchase order. Nothing here depends on a promise; it depends on what is documented before the first panel is cut.

Send a better brief, get a quieter site programme

A well-briefed flat panel hinged wardrobe order produces a boring installation: panels arrive numbered, doors hang true, and the snag list stays short. A thin brief produces the opposite — rework on site, replacement leaves in transit, and a joinery trade waiting on a container. The difference costs nothing to fix at enquiry stage. Prepare the room schedule, name the finishes, define the interior fit-out, and ask for drawings and a material schedule before release; that is the whole discipline.

SANTERSON is a China-based furniture and building materials manufacturer offering custom and OEM work with door-to-door logistics. Send your wardrobe drawings to the project team and let the first reply show you how precisely they read them.