A glass pocket door looks simple on a drawing: a panel that slides into a wall cavity and disappears. On site it is one of the least forgiving items in a joinery package, because the opening, the framing, the hardware and the finish all have to agree before the first fixing goes in. For Australian buyers ordering Santerson Glass Pocket Doors from a China-based manufacturer, the questions worth asking are mostly about what gets confirmed on paper before production starts.

SANTERSON is a China-headquartered manufacturer and one-stop supplier of furniture and building materials, working on villa, hospitality and office projects. Its door range sits under Windows & Doors and includes pocket, sliding, hinged, folding and concealed types. The glass pocket door page describes made-to-measure sizing, material and finish options, and a layout tailored to each project — which is exactly the right starting point, and also the reason the verification list below matters.

Why pocket doors fail more often than other internal doors

A hinged door can absorb a few millimetres of slack. A pocket door cannot. The panel travels inside a cavity, so the wall build-up, head clearance, floor level and architrave detail are locked in once the frame is set. Three things cause most of the problems reported on projects:

  • Cavity depth that does not match the door assembly. The pocket has to take the panel plus the track and studs, and glass panels with frames sit differently from a flat timber leaf.
  • Floor finishes decided too late. Threshold and floor build-up change the clear opening height; if the door is already made, that gap cannot be recovered.
  • Hardware specified after the panel. Track load rating, soft-close gear, jambs and skirting detail have to be agreed together with the panel size and glass weight.

None of these are manufacturing faults. They are coordination gaps between the shop drawings and the site sequence, and they are avoidable when a made-to-measure supplier receives complete information rather than a schedule written before the wall detail was resolved.

What to verify before you place the order

Use this as a working checklist for any door enquiry, and treat anything unanswered as a reason to hold the release for production.

Item to verifyWhat a clear answer looks like
Opening sizes and wall build-upStructural opening width, height and finished wall thickness for every opening, taken from the coordinated set — not from the door schedule alone.
Panel make-upGlass type, colour and thickness with framing material; whether the leaf is single or double glazed, and how the edges are finished.
Hardware setTrack and hanger load rating matched to the panel weight, soft-close or push-open detail, jamb and architrave profile, skirting return.
Veneer or timber species matchingWhen pocket doors sit beside Santerson Wood Veneer Pocket Doors or other joinery, the species, cut and finish are stated for each item so they can be approved together.
Shop drawings and sign-offA drawing per opening showing sizes, hand, glass split and hardware, returned signed before production release.
Packaging and crate markingCrate labels matched to the door schedule numbers used on site, so the trade can find each leaf without unpacking everything.
Site sequenceWhen frames are fixed relative to wet trades and floor coverings, and who sets out the pocket framing.

How a made-to-measure order should run

SANTERSON's service pages describe a workflow of consultation, design and planning, production, logistics, installation and after-sales, with project design coordination covering drawings, production coordination and on-site guidance. For doors that sequence is worth following closely, because the drawing stage is where the pocket geometry gets fixed.

In practice an order should produce three documents you can hold the supplier to: a confirmed schedule of openings with finished dimensions, signed shop drawings for each door, and a packing list keyed to those same numbers. If any of the three is missing when goods arrive, snags follow.

Freight matters just as much at this stage. The logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. For glass pocket doors specifically, ask how panels are crated and dunnaged, whether spares for hardware travel in the same consignment, and how crate markings map to your schedule. Confirm Australian import terms, duties, Incoterms, insurance and transit arrangements case by case — marketing descriptions of coverage are not a substitute for a written quotation for your port and site.

Reading the door range as a system

Buying doors one line at a time creates matching problems later. The Windows & Doors range is broad enough that a villa or small hotel package can be resolved as a set: pocket doors for concealed circulation, Santerson Wooden Sliding Doors where a cavity is not available, and flush or concealed doors where the wall finish has to read as one surface. Specifying them together means one set of reveal sizes, one hardware philosophy and one finish schedule.

The same logic applies beyond doors. Where pocket doors abut built-in joinery — wardrobes, media walls, concealed storage — the reveal, skirting and shadow gap should be drawn once and applied consistently. That is where a single supplier handling fixtures and finishes saves rework, and it is why coordinating the whole fit-out package is usually cheaper than buying each item separately and reconciling them on site.

Claims to keep out of your approval record

Buyers should not carry supplier marketing statements into a project document without checking them. Factory area, export percentages, staff numbers and certification figures appear inconsistently across the company's own pages, so if a submission form requires those details, request written confirmation of the current figures rather than quoting the website. The same applies to installer availability in Australia, warranty terms, response times and exclusions: the site describes installation, snag inspection, warranty coverage, spare parts and maintenance, but the applicable terms should be confirmed for your project in writing before they appear in a specification.

Practical rule: anything that affects acceptance on site — sizes, glass make-up, hardware duty, finish matching, packaging, delivery point — belongs in signed drawings and a written quotation. Anything that is only a website claim stays out of the approval record until confirmed.

A short pre-production sequence

  • Issue the coordinated door schedule with finished wall thicknesses, floor levels and opening hands.
  • Ask for a hardware recommendation against panel weight before sizes are frozen.
  • Approve shop drawings per opening, including glass splits and jamb profiles.
  • Confirm crate markings against your schedule numbers and the delivery point on site.
  • Book the frame-fixing date around wet trades and floor coverings, not the other way round.
If you are pricing pocket doors for an Australian villa, apartment or hospitality job, send the door schedule together with wall build-up details and request shop drawings before release for production. SANTERSON's turnkey project solutions cover design coordination, custom/OEM manufacturing, logistics and installation support across a fit-out package, so doors can be resolved alongside the joinery and finishes they have to match.