A glass-front tall cabinet looks simple on a drawing. One narrow unit, full height, a glazed door, and it disappears into a wall of cabinetry. On site it is one of the easiest items to get wrong: the reveal is out of square, the door swings into a fixture, the glass finish does not match the rest of the joinery, or the cabinet arrives after the tiler has already closed the wall. A Santerson Glass Front Tall Cabinets installation plan is the document that prevents those problems. Below is what a complete plan should contain before production starts, written for buyers, site supervisors and fit-out contractors who have to sign it off.

1. Measured conditions, not design dimensions

Every tall cabinet in the Tall Cabinets collection is made to measure, so the plan must start with field measurements taken on the completed substrate rather than the architectural drawing. Record the finished floor level, the finished wall face, and the clear height under any ceiling bulkhead, beam or service run. Glass-front units are usually specified full height, so even a small difference between the drawing and the site shows up as an obvious gap at the top.

  • Width, height and depth measured at three points each, with the smallest value noted for clearance.
  • Out-of-plumb and out-of-level readings on the wall and floor the unit will sit against.
  • Positions of waste pipes, water supply points, isolating valves, sockets and light switches that fall inside the cabinet footprint.
  • Door and drawer swing paths checked against vanities, toilets, shower enclosures and room doors.

2. Storage configuration agreed before the glass is ordered

Glazing fixes the internal layout, so change it after the door is made and you are replacing a component rather than adjusting a shelf. The plan should show an elevation of the interior: shelf heights, drawer positions, adjustable versus fixed shelves, and any integrated lighting or power inside the cabinet. Confirm which items will actually be stored there, because glass-front units in bathrooms and pantries usually hold linen, towels, toiletries and glassware at different heights.

Where the glazed unit sits beside closed storage, decide deliberately what is displayed and what is hidden. Our Glass Front Tall Cabinets page states that finish, layout and dimensions are specified per project, and that glass and storage configuration must be confirmed for each project. That confirmation belongs in the plan, signed by the person who will live with the cabinet.

3. Finish and glass specification written down

Write the exact carcass material, door finish, handle or handleless profile, glass type and glass tint in the plan, and match them against the sample reference you approved. Two units ordered from the same range can look different if one is a matte lacquer and the other is a matte melamine, even when both read as "grey" on a schedule.

Item to specifyWhy it belongs in the plan
Carcass and door material and finishKeeps the tall unit consistent with adjacent cabinetry and wardrobes from the same batch.
Glass type, tint and edge treatmentClear, frosted, ribbed and smoked glass reflect light very differently in a small bathroom.
Hardware and opening directionHinge side and handle style must be fixed before the door is manufactured.
Sample reference and approval dateGives you something to check the delivered unit against on arrival.

4. Sequencing with trades and other products

Tall cabinets rarely stand alone. In a bathroom or laundry they sit next to vanities, basins, toilets and shower systems, and in a kitchen they align with the rest of the cabinetry run. The installation plan should place the glazed unit on a dated programme showing who does what first: waterproofing, tiling, electrical rough-in, cabinetry delivery, installation, then glass and hardware adjustment.

If the tall cabinet shares a wall with an appliance housing, resolve that at the same time. Integrated Appliance Tall Cabinets require the appliance dimensions, ventilation and electrical requirements to be confirmed for each project, and those decisions change the carcass size. Where the design mixes glazed and closed storage, note the matching units — Utility Tall Cabinets and Linen Cabinets come from the same collection with the same made-to-measure approach, so ordering them together keeps finishes consistent.

5. Delivery route and handling check

A full-height glazed cabinet is long, heavy and fragile, and it must reach the room intact. Add a short access note to the plan: lift dimensions, stair width, corridor turns, and whether the unit ships assembled or flat-packed for on-site assembly. Confirm the receiving date against your site programme rather than accepting whatever the container schedule says.

SANTERSON handles freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, and installation support is part of the service scope. Import terms, duties and transit arrangements are confirmed case by case for each destination, so your plan should state who acts as importer of record and who receives the goods on site.

6. Installation method and sign-off

The last section of the plan is the one most often left blank: how the unit is fixed and how it is accepted. Specify the fixing method for the wall type, whether packing or scribing is required to bring the frame level in an out-of-plumb reveal, and who carries out the installation.

  • Frame checked plumb, level and square before fixings are loaded.
  • Door aligned and adjusted after the carcass is fixed, not before.
  • Glass inspected for chips and edge damage at the point of installation.
  • Drawers and shelves tested under load, with soft-close operation checked.
  • Snag list written on the day, photographed, and signed by both parties.

One line worth adding to every plan: dimensions, material, loading, glass and installation specifications are confirmed for each selected configuration. A plan that records those confirmations with dates and names is the difference between a resolved variation and an argument on site.

Before you send the plan to production

Read it once as the person who will install the cabinet. If the document answers where the unit sits, what is inside it, what it is made of, when it arrives, and who signs it off, it will survive contact with the site. If any of those five are missing, resolve them now while they are still a drawing change rather than a rectification.