A quotation for matte melamine cabinets only becomes comparable with other quotes once the dimensions, layout and finish inputs behind it are fixed. This guide sets out what a manufacturer or supplier actually needs from you before they can price made-to-measure cabinetry for a residential kitchen, villa or apartment project.

Why Matte Melamine Cabinetry Is Specified Differently From A Standard Kitchen Set

Melamine panel cabinets are supplied to the opening, not to a catalogue size. Each run of base units, wall units and tall pantry housings is cut, edged and assembled around the room it is going into, which is why our melamine kitchen range is offered with made-to-measure sizing, material and finish options, and a layout tailored to the project. The same logic applies across the collection, from minimalist slab melamine cabinets to textured melamine cabinets.

That flexibility is the advantage and the risk. Give a supplier thin information and you get an approximate price that changes after the first site survey, plus panels ordered in the wrong tone or direction of grain. Give complete information and the same enquiry produces a firm quotation, a shop drawing round, and production that starts on schedule.

Room Dimensions To Record Before You Request A Quote

Take measurements from finished surfaces, meaning after tiling, screeding and plasterboard are accounted for. Where those finishes are still to come, record the structural dimension and state clearly what is being applied on top.

InputWhat To RecordWhy It Matters
Wall lengthsEach run, wall to wall, in millimetres, including the return at cornersSets the number and width of base and wall units, and whether a corner unit is needed
Room heightFloor level to ceiling slab, plus the intended finished floor levelDetermines whether wall units stop below the ceiling or run full height with a filler panel
Projection availableClear depth along each run, noting any structural column or ductingConfirms standard carcass depth is workable and that circulation space stays usable
OpeningsWindow sill height and reveal depth; door leaf width and swing directionCabinetry cannot simply run through an opening; the reveal and jamb detail have to be resolved
ObstructionsRisers, soil stacks, radiators, meter cupboards, beams and their offsets from each wallThese are the usual causes of a mid-production change order
Service pointsCold and hot water outlets, waste positions, electrical sockets, hob and oven positions, extraction routeDrives cut-out positions in worktops and panels, and the ventilation path for any integrated appliance housing

Send a simple hand sketch or a floor plan export with those numbers marked, rather than a photograph of the room. A dimensioned plan is what our design coordination step works from when it turns a concept into production drawings.

Layout And Storage Inputs That Shape The Price

Once the envelope is fixed, the layout decisions determine how much carcass material, hardware and fabrication each run needs.

  • Run configuration: single wall, L-shaped, U-shaped, or a galley with an island. Islands and peninsulas add worktop span, plinth detail and access from two sides.
  • Unit mix: how many drawers versus hinged doors, how many tall housings, and whether corner access uses carousel, magic corner or pull-out solutions.
  • Appliance schedule: built-in oven, microwave drawer, dishwasher, fridge column and hob type with dimensions. Integrated appliance housings must be sized to the exact model.
  • Worktop decision: material, thickness, edge profile, whether a backsplash or full-height splashback is required, and the sink cut-out position.
  • Handle strategy: protruding handles, integrated profiles, or touch-to-open fronts. Handleless fronts need consistent panel alignment and the correct hinge specification.
  • Matching joinery: pantry walls, tall larder units, and any cabinetry repeated in bedrooms or laundry rooms, which is easier to order in one batch while panel colours are still open.

If your project leans toward a handleless look, handleless minimalist kitchen cabinets show how flat fronts, concealed hardware and soft-close fittings are combined so the surfaces stay continuous across a long run.

Finish And Material Inputs For A Matte Melamine Specification

With matte melamine, the words in an email rarely match the panel on the production line. Specify these explicitly:

  • Colour or decor reference. Give a code from the supplier's panel range rather than a name such as "grey" or "oak". Matte neutrals read very differently across a large, well-lit kitchen than they do on a sample card.
  • Surface character. A flat matte, a fine textured finish and a wood-grain melamine panel behave differently under raking light and under hand. Our wood grain melamine cabinets are specified by decor, so the grain direction and repeat are agreed before cutting.
  • Panel combination. Two-tone kitchens need the upper and lower tones stated separately, with the transition point marked on the drawing.
  • Edge treatment. Edge colour, thickness and whether edges are matched or deliberately contrasted. This is what makes a matte front look built-in or boxed-in.
  • Carcass interior. Interior decor and shelf colour, which are visible every time a door opens on an open-plan layout.
  • Hardware brand and action. Soft-close hinges and drawer runners, load rating for deep drawers, and any integrated lighting provision.

Order the panel samples early

Request physical samples of the exact matte decor you intend to specify, and view them in the room under both daylight and artificial light before you sign off. Tone is a frequent source of disagreement on a melamine cabinet order, and it is far cheaper to settle it on a sample than to reprint doors.

Project Information That Belongs In The Same Enquiry

Cabinetry for a villa renovation and cabinetry for an apartment scheme arrive at the factory as different briefs, even when the panel is identical. Include:

  • Project type and unit count. One kitchen, several villas, or a repeated apartment module. Repeated modules allow one set of approved drawings to be produced in batch.
  • Delivery location and access. Port or site address, floor level, lift dimensions and any restriction on vehicle size or delivery hours.
  • Sequence and handover dates. When the room will be watertight and when other trades finish, because cabinetry is measured to finished surfaces and installed late in the programme.
  • Division of responsibility. Who supplies worktops, sinks, taps, appliances and lighting, and who carries out installation on site.
  • Approval route. The person who signs off shop drawings and colour samples, so one round of comments is enough.

For projects that combine cabinetry with other fit-out items, custom built-in kitchen cabinets supplied as interior fixtures are usually coordinated alongside wardrobes, vanities and joinery in the same package, which keeps panel colours and hardware consistent across the building.

How The Specification Moves Into Production

A complete input pack shortens the path from enquiry to installed cabinets. Our cooperation steps run from the project brief and design proposal, through quotation and detail confirmation, to production, shipment and follow-up, with drawings, production coordination and on-site guidance in between.

  1. Brief and measurements received. Dimensions, layout intent, appliance schedule and finish references.
  2. Shop drawings issued. Elevations for each run, unit schedule, worktop cut-outs and hardware list for your review.
  3. Comments closed and samples confirmed. Matte decor, edge colour and hardware action signed off.
  4. Quotation confirmed. Panel, hardware, packaging and freight scope stated line by line so nothing is assumed.
  5. Production and inspection. Panels cut, edged and assembled to the approved drawings.
  6. Packing, shipping and site handover. Crate marking matched to the unit schedule so installers know which box belongs to which elevation.

Every step above depends on the quality of the first email. If you can share a dimensioned plan, an appliance list and two or three panel references, we can turn your enquiry into drawings and a firm quotation rather than an estimate that moves later.

Dimensions, finishes and hardware availability are confirmed per project at quotation stage; the inputs listed here are what our team needs to prepare that quotation for matte melamine cabinetry.