A flush hinged door looks simple from the outside: a flat leaf, a concealed frame, no visible hardware. That simplicity is exactly why orders go wrong. Once the door leaf, frame and wall finish arrive on site as separate line items, small gaps in the specification turn into rework, waiting time and extra freight. If you are sourcing Santerson Flush Hinged Doors for a villa, apartment or hospitality fit-out, the questions below are the ones worth settling before you place an order.

1. What does the door need to sit flush with?

A flush door is judged against the surface around it, not on its own. Before anything else, confirm what the surrounding wall will be finished with and how the two meet. A door that reads beautifully against a painted plasterboard reveal can look wrong beside stone cladding, a wood veneer panel or a textured wall panel, because the shadow gap and the plane of the leaf behave differently on each.

  • Which wall system the door is set into: plasterboard, masonry, timber stud, or a panelling system.
  • Whether the leaf is intended to be finished on site with the same paint or wall covering as the surrounding surface, or supplied pre-finished.
  • Where the shadow gap sits, how wide it should read, and which party is responsible for forming it.

If your scheme also uses concealed or handleless doors elsewhere on the same floor line, decide now whether they are being ordered as one family. Mixing collections across a single corridor is where the reveal depths and ironmongery positions start to disagree.

2. Which collection is the right starting point?

SANTERSON lists flush hinged doors within its Windows & Doors range, alongside related configurations that solve different problems on the same drawing.

CollectionWhere it is normally specified
Santerson Flush Hinged DoorsHinged leaf with a flush appearance, made to the opening size and finish selected for the project
Santerson Flush Interior DoorsInternal doors where the flush look is set within the interior door range
Santerson Handleless Concealed DoorsHandle-free appearance with concealed ironmongery, for clean unbroken wall lines
Santerson Decorative Concealed DoorsA concealed door used as a decorative element within the panelling it disappears into
Santerson Wood Veneer Hinged DoorsHinged doors where a timber veneer face is the intended finish

These pages describe configurable products rather than fixed catalogue items, so treat the collection names as a starting point for a conversation about your opening, not as a finished specification.

3. What exactly is being measured on site?

The product information states made-to-measure sizing, with layout and dimensions specified for each project. That only works if the measurements you send are taken at the right moment and describe the opening as it will be, not as it happens to be today.

  • Width, height and wall thickness at several points, not one, since openings rarely hold a single dimension.
  • Finished floor level, with the floor build-up and any screed or topping accounted for.
  • Position of services, insulation, noggins and studs that will affect fixings or the cut-out.
  • Whether the opening is being formed to suit the door, or the door is being adapted to an existing opening.

Send the drawings as well as the numbers. A dimension without a section through the wall tells the factory very little about the reveal you expect.

4. What is included in the price, and what is not?

Flush hinged doors are usually supplied as a set of components that only become a door on site. Ask for the supply scope written out item by item, so you can compare quotations honestly.

  • Door leaf, frame and architrave or reveal detail: which of these are included, and in what finish.
  • Ironmongery: hinges, locks, strike plates, door closers and any magnets or catches, and whether they are supplied by the door supplier or by others.
  • Finishes: material and finish options offered for the leaf face, and whether a sample is available before production.
  • Fixings, sealants and trims that the installer will need but the delivery may not include.

Where ironmongery sits with another supplier, agree who carries the interface risk. That single line in a purchase order prevents most arguments on site.

5. How will the doors travel, and how will they be checked on arrival?

Doors are high-value, low-tolerance items that get damaged in transit more often than almost anything else in a fit-out. SANTERSON describes freight forwarding by sea, air and rail with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery under its logistics and door-to-door delivery service. Ask how leaves are packed and supported, how corners are protected, and how the batch is marked against your opening schedule so installers can find each door where it belongs.

Then decide who inspects on arrival and within what window. Doors that are signed for without inspection leave very little room to claim for transit damage later.

6. Who hangs them, and when?

A flush door is only as good as its hanging: alignment, even gaps on all four edges, and a leaf that stays where you leave it. The installation and after-sales support page describes on-site installation, inspection and snagging, spare parts and ongoing maintenance. Whichever party installs, fix three things in writing: the sequence of works relative to wet trades and floor finishes, the tolerance you will accept on gaps, and how snags are recorded and closed out.

Practical detail matters more than promises here. Ask when the frames go in - early enough to be protected through the build, late enough not to be damaged by it - and confirm that spare leaves or matching doors can be ordered later in the same finish.

7. How do the doors coordinate with the rest of the joinery?

Flush doors rarely stand alone in a modern interior. They sit next to wardrobe fronts, media walls, panelling and concealed storage, and the whole line has to read as one surface. Where cabinetry and doors come from different suppliers, differences in panel thickness, edge detail and finish batch show up immediately.

SANTERSON also produces related built-in work, including Classic Wooden Hinged Wardrobes, and describes custom and OEM work covering bespoke finishes and materials under its custom & OEM service. Ordering doors and joinery together, with one drawing set and one finish schedule, is the simplest way to keep reveals, edges and grain consistent across a floor.

8. What happens after the order is placed?

Ask to see the confirmation stage before production starts: shop drawings or a specification sheet showing each opening, its size, its hand, its ironmongery set and its finish, with your approval on it. That document is what protects both sides if something is later found to be wrong.

Also ask how changes are handled once production has begun, what the practical cut-off point is, and how a revised opening schedule is issued to the site team. Late change requests are the most common cause of doors arriving in the wrong size or the wrong hand.

A short pre-order checklist

  • Wall build-up and finish confirmed, with a section detail for the reveal.
  • Opening sizes, wall thicknesses and finished floor levels verified on site, not from drawing alone.
  • Door hand, ironmongery set and lock preparation agreed per opening.
  • Leaf face material and finish approved from a sample.
  • Supply scope written out: leaf, frame, reveal, ironmongery, fixings.
  • Packing, marking against the opening schedule, and arrival inspection agreed.
  • Installation sequence, gap tolerances and snag process recorded.
  • Shop drawing approval obtained before production starts.

One practical note: the product pages list made-to-measure sizing with material and finish options, and ask that dimensions and selected specifications be confirmed for each project. Anything this article says about sizes, materials or performance is guidance on what to ask - your confirmed order documents are the authority.

If you are specifying flush hinged doors as part of a villa, apartment or hospitality project, send us the door schedule and wall sections and we will confirm sizes, finishes and supply scope against them. Contact SANTERSON to start that review.