A swim spa quote is easy to compare on one number and hard to compare on the whole package. Two quotations for the same shell can differ by a wide margin because pumps, jets, controls, insulation and freight are bundled differently by each seller. The checklist below follows the Outdoor Swim Spa WS-S06C as a worked example, so you can see what a complete line item looks like before you sign anything.
Start With the Shell, Not the Price
The first block of any quotation should state the physical envelope of the unit: overall length, width and water depth, in millimetres or inches, plus the shell material and the frame or cabinet construction. For this model the catalogue lists 5880 × 2380 × 1400 mm. Confirm those three figures against your site drawing before anything else, because a difference of a few centimetres changes the concrete pad, the access route through gates and doors, and the clearance needed for later maintenance.
Ask the seller to state what is included in that envelope. Insulation on the shell and on the cabinet panels is often quoted as an option rather than a standard part, yet it drives running cost more than almost any other line in the specification. If insulation does not appear in your quotation, ask whether it is standard, optional or excluded.
Read the Pump and Jet Schedule Line by Line
This is where quotations for the same model diverge most often. A pump count without a power rating tells you nothing about performance, and a jet count without a location drawing tells you nothing about the hydrotherapy experience. The catalogue specification for this unit reads as follows:
| Specification line | Catalogue value | What to confirm on your quote |
|---|---|---|
| Overall dimensions | 5880 × 2380 × 1400 mm | Fits the prepared pad and the delivery route |
| Water pumps | 3 pcs | Power rating per pump and which zone each one serves |
| Filter pump | 1 pc | Flow rate and filter cartridge size for replacement supply |
| Total jets | 33 pcs | Jet layout drawing and which seats the jets serve |
| LED lights | 2 | Colour or white, and whether the driver is included |
| Total power | 9.95 kW | Voltage, phase and dedicated circuit requirements |
| Control system | 1 set | Model of the controller and whether a spare is offered |
| Features shown | Water jets, temperature setting, LED lighting, ozone | Which of these are standard on your configuration |
Two points deserve particular attention. First, the total power figure covers the equipment set as specified in the catalogue; a heat pump added later changes the electrical load and may change the supply your electrician has to install. Second, the swim training system is not listed for this model in the captured specification, while it does appear on related models in the same series. If your brief calls for lap swimming against a current, ask the seller to confirm in writing whether a current unit belongs on this configuration or whether you should be looking at a variant instead.
Compare like with like. Before you compare two prices, put both quotations into the same table using the rows above. Any row one seller left blank is either excluded from the price or an assumption waiting to become a variation order.
Check What the Optional Extras Actually Cover
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each of these is a place where two quotations can look identical and cost very differently. For each option on your quotation, ask three questions: is it factory-fitted or supplied loose for site installation; is the item sized for this shell volume; and does the quoted price include the wiring, plumbing and control integration needed to make it work.
Water treatment deserves its own line. Ozone appears in the standard feature set for this unit, while UV sterilisation and sand filtration sit in the optional list. Decide which treatment approach your maintenance team can actually service on site, then ask the seller to price that approach rather than leaving it open.
Put the Site Conditions in Writing
A quotation that only covers the product pushes every site risk onto the buyer. The following items should appear as named lines, either supplied by the seller or clearly marked as your responsibility:
- The concrete pad or plinth, its load rating and drainage around the shell.
- A dedicated electrical circuit with the correct voltage, phase and protection device.
- Lifting and placement equipment at the delivery point, if the unit cannot be wheeled into position.
- Steps, cover or enclosure, if these are part of the order.
- Commissioning: who fills, tests and hands over the unit, and what documentation you receive.
Compare the Delivery and After-Sales Terms
Freight is where an attractive product price can quietly disappear. Ask for the quotation on a named delivery term with a stated destination, and check whether it includes customs paperwork, container loading and door-to-door delivery to the site itself rather than to a port. For a swim spa this matters more than for furniture: the unit is heavy, the shell can be damaged by improper lifting, and a late delivery date moves the whole programme.
Then read the after-sales section as carefully as the product section. Spare parts availability for pumps, jets, controllers and filters determines whether the spa is usable in year five, not just in month one. Ask which parts are stocked, how they are shipped, and what support exists when a controller faults.
If you are furnishing a villa or resort as a single package, it is worth asking whether the swim spa can be ordered alongside outdoor furniture from the same supplier. One production schedule and one container reduces the number of handover dates you have to manage on site, and it keeps finishes coordinated between the water feature and the surrounding terrace.
A Pre-Order Checklist
- Dimensions confirmed against the pad drawing and the delivery route.
- Pump count with power ratings, and filter pump flow rate stated.
- Jet layout drawing attached, with jet count matched to the specification.
- Total power, voltage and phase confirmed in writing for your electrician.
- Standard versus optional equipment listed separately, with insulation called out.
- Swim current requirement confirmed or ruled out for this model.
- Water treatment approach fixed and priced.
- Delivery term, destination and customs responsibilities named.
- Spare parts supply and after-sales contact stated in the contract.
Send us the quotation you received and we will mark up what is missing against this model's specification. As a manufacturer of swimming pools and swim spas, we quote equipment line by line so you can compare configurations rather than guesswork.