Open storage looks simple on a drawing: a run of shelves, no doors, nothing to swing open in a narrow bathroom. In production it is one of the least standardised items in a fit-out, because everything about it is decided by the project. Before you send an enquiry about Santerson Open Storage, gathering five sets of information will turn a vague request into a quotation you can actually compare.

1. The room, not just the item

Open storage in our catalogue sits with bathroom fixtures and sanitary ware, which means it is specified alongside vanities, mirror cabinets, tall cabinets and ceramics. Send the room layout first: overall wall lengths, the position of the vanity, toilet, shower enclosure, towel rails, doors and any pipework or isolate valves you intend to keep. A shelf depth that works on one wall will block a door arc or clash with a tap on another.

Tell us how many bathrooms share the same detail. Repeating one configuration across several rooms changes what we can produce and how the units are packed, and it is far cheaper to settle the detail once than to renegotiate per room.

2. Dimensions you can defend

Our storage units are made to measure, so approximate dimensions lead to approximate prices. For each unit we need:

  • Overall height, width and depth, and whether the unit is wall-hung or floor-standing.
  • Finished floor and finished wall levels, so our measurements match your site rather than a structural drawing.
  • The clear gap required at the vanity, basin and mirror, and any skirting or tile build-up that reduces the run.
  • Corner returns, niches and obstructions such as boxes, ducts or insulation.

If the open storage continues into a larger joinery scheme, say so. Santerson Full Height Storage Walls and open shelving are often detailed as one wall; specifying them together keeps the finish, edge detail and shelf spacing consistent across the whole elevation.

3. How the unit will actually be used

Open shelving shows everything it holds, so use decides the specification. Describe the items being stored: towels and linens, toiletries in bulk, glassware, cleaning products, or display pieces. This drives shelf spacing, load requirement, and whether a shelf needs reinforcement or a raised edge.

Also state who will use the room. A family bathroom, a guest suite in a villa and a busy shared bathroom age very differently, and an open unit in a high-traffic bathroom needs a finish that tolerates cleaning products and damp hands. Where the layout is tight, Santerson Corner Open Shelving is often the better answer than a straight run, because it uses depth that would otherwise be wasted behind a door.

4. Material, finish and the rest of the palette

Send the finishes already fixed for the room: cabinet doors, vanities, tapware, mirrors, flooring and wall finishes. Open storage is read as part of that palette, so a mismatch in grain direction, edge band or sheen is visible immediately. If you have not chosen yet, tell us the look you are working towards and we will propose materials and finishes from our range for your confirmation.

Bathrooms are damp spaces. Be explicit about ventilation, whether the room has a window or an extraction system, and whether the unit sits inside a wet zone or outside it. That single detail changes which material and finish combinations we will recommend.

5. Site conditions, delivery and installation

Wall-hung units depend on what is behind the wall. Confirm the wall construction, the fixing substrate, tile thickness and whether reinforcement or blocking is already in the drawing. If it is not, we will flag it early enough for your builder to act rather than discover it on site.

For projects outside China, add the delivery address, the access route to the floor, lift or stair dimensions, and who carries out installation. Our scope covers logistics and door-to-door delivery as well as installation and after-sales support, so we can plan packaging and container loading around your site conditions instead of defaulting to a generic crate.

What the enquiry should contain

InformationWhy it matters
Room layout with fixed services markedPrevents clashes with doors, taps and pipework
Made-to-measure dimensions against finished levelsFixes the price and avoids site rework
Intended contents and shelf spacingDetermines load requirement and shelf detail
Selected finishes or a reference paletteKeeps the open unit consistent with surrounding joinery
Wall construction and fixing substrateConfirms wall-hung feasibility before production
Delivery address, access route and installerShapes packaging, loading and installation planning
Quantity of identical unitsAffects production batching and packing
Programme dates for the roomTells us what has to be produced first

A note on the numbers you will get back

There is no single standard size, fixed lead time or blanket warranty term for these units. Each configuration is quoted against your drawings, and dimensions, materials, load capacity and installation requirements are confirmed with you in writing before production begins. Where your project carries local code or certification requirements, send them to us together with the drawings so we can confirm which parts of the specification they touch.

If you have the layout and dimensions ready, send them over with your target finishes and quantities. We will come back with a specification and quotation for the open storage in your project, together with any clashes we find in the drawings before anything goes into production.