A glass sliding door wardrobe arrives on site in two very different forms of cargo: heavy, brittle glazing and long, finish-sensitive panel components. If either is damaged in transit, the replacement door leaf or carcass panel has to be remade to the same made-to-measure size, and the bedroom joinery programme slips with it. Packaging is therefore a specification item, not a detail the factory settles on its own. Below is what buyers, contractors and project managers should confirm in writing before production starts.
1. How the glass leaves are separated from the panel components
Ask for a packing list that states clearly whether glazing travels with the carcass or in its own consignment, and how each leaf is restrained. Glass should stand on edge, not lie flat, in its own compartment with corner protection and a face separator between leaves; loose hardware, rails and offcuts must never share that compartment. Panels, by contrast, need edge protection and flat, rigid support so the finished faces are not rubbed in transit.
Get the packing list before shipment, not after. It is the only document that lets you check whether the glazing, tracks, frames and carcass panels were separated as agreed.
2. What the crate or carton is actually made of
For a wardrobe that ships internationally, ask what encloses each element and what the material specification is: plywood or timber crate for glazing, and what grade of carton plus edge board and corner protectors for panel components. If fumigated timber is used, ask which treatment applies and what documentation comes with it, because import paperwork for solid wood packaging varies by destination and is checked on arrival.
Ask the same question about the interior packing, not just the outer case: foam density, whether the glass sits in a suspended or edge-supported cradle, and whether the doors are transported in the same orientation they will be installed in.
3. How the sliding hardware is packed and marked
Tracks, rollers, buffers and adjustment fittings are small, easy to lose and expensive to replace on site. Confirm whether hardware is fitted into pre-labelled bags inside a dedicated box, or bundled with panels where it can shift and scratch a finished face. Each package should carry a mark that ties it to one wardrobe module, so the installer on site knows which rollers belong to which leaf.
Ask for a short installation sequence note with the hardware. With made-to-measure joinery, an installer who has to guess the order of track fixing and door adjustment will mark or cut finished components.
4. Labelling that matches the room and module, not just the carton count
A wardrobe delivered to a villa or apartment floor is usually one of several identical units. Labels should read room plus module reference, matching the approved shop drawing, so packages can be routed to the correct bedroom without opening them. Confirm that the label also states handling orientation and any "this side up" requirement for glazing.
5. Container loading and how the crates are secured
Ask how the crates will be blocked and braced in the container, and whether glazing crates sit where they can be lifted straight out rather than being buried behind heavier joinery. If your order also includes other fit-out items, confirm the loading sequence for your delivery window on site.
Our Logistics & Door-to-Door Delivery service covers packaging and container loading as part of the freight arrangements, along with shipment tracking and door-to-door delivery. The scope for any single project is confirmed case by case, so ask for your consignment in writing.
6. Inspection and replacement terms agreed before the container is opened
Agree the inspection window and the evidence you are expected to provide: photographs of each damaged crate before de-vanning, crate numbers, and the packing list line reference. A buyer who has that record in place can raise a claim on the day of arrival instead of arguing about whose damage it was weeks later.
Also confirm how a replacement leaf is handled: whether the factory remakes to the original made-to-measure size from its own records, or whether a site re-measurement is required after damage. For glass this matters, because an old opening dimension may no longer describe the frame once it has been set on site.
7. How packaging decisions change with the product variant
Mirror and tinted or coated glass leaves need face protection against both impact and surface marking, and they show handling damage more visibly than clear glass. Framed variants, such as Smoked Glass Aluminum Frame Wardrobes, add a metal frame that has to be protected at mitred corners, and an aluminium frame can transmit point loads into the glass if a crate lets the leaf shift. Where the design combines materials, as with Glass & Acrylic Combination Wardrobes, confirm that each material is packed to its own requirement rather than all doors being treated the same way.
If your project mixes door types across bedrooms, ask whether the supplier uses one packing standard for everything or specifies per variant. The first option is cheaper and usually carries more risk on the finish.
8. Who is responsible between the factory floor and your site
Fix the responsibility boundary in the order documents: packaging to the agreed standard, loading, freight, and then delivery and installation. Our Installation & After-sales Support service covers on-site installation with inspection and snags, plus spare parts and replacement arrangements; the applicable terms for your project should be confirmed before order, since response commitments and coverage shown on the site are not verified per case.
As a China-based furniture and building materials manufacturer working on villa, hospitality and apartment projects, SANTERSON supplies made-to-measure joinery as part of a wider fit-out package. Where wardrobes travel alongside kitchen cabinetry, doors and wall panelling, one agreed packing standard across the whole order is easier to inspect than several.
A short list to put into your purchase order
- Packing list showing glazing separated from panels and hardware, with crate numbers tied to room and module references.
- Outer case material and treatment, plus documentation for any solid wood packaging.
- Interior packing method for glass: edge support, face separators, corner protection, transport orientation.
- Hardware in labelled bags per module, with an installation sequence note.
- Blocking and bracing plan, and where the glazing crates sit in the container.
- Inspection window on arrival, evidence required, and the replacement route for a damaged leaf.
Send us the opening dimensions, door layout and glass type for each bedroom, and we will confirm the specification together with how each element is packed, marked and loaded for your site. Packaging expectations are easiest to agree while the drawings are still being approved, before the first panel is cut.