A linen cabinet is easy to specify and easy to damage. It is tall, narrow, heavy for its footprint, often glazed at the front, and finished on faces that show handling marks. Most buyers settle the dimensions and the finish in detail and leave the carton to chance. The result surfaces at site, when the packaging comes off.
Our linen cabinets are made to measure — dimensions, layout, material and finish are set per project rather than chosen from a fixed catalogue size. That is what makes them fit narrow bathrooms and awkward alcoves, and it is also why generic packing is a poor assumption. Here is what to confirm in writing before production starts.
Why This Product Travels Badly If Left to Chance
Three characteristics of a made-to-measure linen cabinet drive the packing decision:
- Height without a wide base. A tall, narrow case is hard to brace. Without proper restraint, it racks in transit and the doors arrive out of alignment.
- Fully finished faces. Lacquer, acrylic, veneer, melamine and high-gloss surfaces react differently to contact. Something that protects a matte melamine face can leave a witness line on a gloss one.
- Glass where specified. Glazed fronts need their own protection and their own line on the packing list, not a general remark on the carton.
The Packing Details to Settle Before Production
Ask for the packing method as part of the order confirmation, and request photographs of a packed sample on larger orders.
| Point to confirm | What to ask |
|---|---|
| Assembled or flat-packed | Which method applies to this order. Assembled units skip site assembly; flat-packed units cut shipped volume and pass through narrow access more easily. Do not assume either. |
| Edge and corner protection | Corner boards, edge protectors, and the thickness of foam or board on visible and mitred edges. |
| Finished faces in a stack | What separates them, and whether gloss and lacquer panels travel apart from one another. |
| Glass | Glazed into the door or crated upright on edge, and how each pane is marked and dimensioned. |
| Outer case | Cardboard carton, plywood crate, or carton with a timber frame — and whether the choice depends on transport mode. |
| Moisture | Shrink-wrapping for sea freight, and what protects the case through long container transit. |
| Markings | Project reference, room or unit number, carton number out of total, centre-of-gravity and this-side-up marks. |
| Paperwork | Packing list per carton, assembly drawings for flat-packed units, hardware bagged and labelled to match those drawings. |
Markings matter most on multi-bathroom work. On an apartment or villa package, a case labelled "tall cabinet 1 of 6" cannot be routed to the right floor. Room or unit numbers printed on every carton cut rehandling at site and make a shortage visible at delivery rather than during installation.
Agree the Inspection Point Before Shipping
Decide where responsibility transfers and who checks: at the loading port, at destination, or on delivery to site. Then agree that photographs are taken before packaging is removed. For glazed units this is not a formality — concealed damage frequently only becomes visible once a case is open, and without dated photographs there is nothing to claim against.
Put the packing method, marking convention and inspection point into the order confirmation alongside dimensions and finishes. A packing standard described only in an email thread is difficult to enforce three months later, once containers are booked.
Packing Across a Whole Bathroom Order
Bathroom fit-outs arrive as several product groups at once, and each group travels differently. Ceramics are dense and need shock protection; tall cabinets need bracing against racking; glazed storage needs its own crating.
Split across suppliers, that means different packing standards, different carton markings and no shared reference system for the site team. Ordered from one supplier against a single project schedule, the packing list can be organised by room rather than by product line — which is how delivery should read on site. Our bathroom sanitary fixtures are specified and packed alongside cabinetry for that reason, and our floating vanities share carcass construction and finish options with the tall cabinet range, so both travel under one packing standard.
Distance Changes the Specification
A unit moved by road within one country meets different handling from one crossing an ocean in a shared container, holding at port for days and then moving again on site trucks. International legs add handling touches and condensation risk inside the container, so the packing specification should state the transport mode it was written for.
Our logistics and door-to-door delivery service covers freight by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking. For projects outside China, ask how the packing above is adapted to the chosen mode, and settle insurance terms for the consignment in the same conversation.
Pre-Order Checklist
- Packing method confirmed in writing: assembled or flat-packed, outer case type, corner and edge protection.
- Finished faces identified by material, with interleaving stated for gloss and lacquer panels.
- Glass packed and marked separately, pane dimensions on the packing list.
- Every carton marked with project reference, room or unit number, and carton count.
- Packing list organised by room, matching the order schedule rather than the catalogue.
- Assembly drawings supplied for flat-packed units, hardware labelled to match.
- Inspection point agreed, with photographs before packaging is removed.
- Transport mode confirmed, packing adapted to it, insurance terms settled.
Common Questions
Do made-to-measure linen cabinets ship assembled or flat-packed?
Both are available and they trade off differently — assembled units are ready to fix in place, flat-packed units cut volume and handle narrow access better. Check which one the quotation covers.
Should glazed doors travel fitted to the cabinet?
It depends on door construction and route. Glazing in place saves site work but puts the pane in the same case as the carcass. Confirm how the doors in this specification travel and how each pane is protected.
What belongs on the packing list?
Carton number out of total, room or unit reference, contents by dimension, hardware sets matched to each carton, and glass pane sizes. A list naming only products cannot be used to trace a shortage.
Who inspects on arrival?
Agree it before shipping. Photographs taken before the packaging is removed protect buyer and supplier alike, and turn concealed damage from an argument into a claim.
For tall, fully finished, partly glazed storage, packing is not a footnote to the specification — it is part of it. Settled in the order confirmation, the same document that fixes dimensions and finishes also governs what arrives on site.
To review packing specifications for a bathroom or villa fit-out, contact SANTERSON at santerson@qq.com, or by phone and WhatsApp on +86-13928214007 (PHILLIP).