A swim spa of this size is sold as a configurable unit, not a fixed catalogue item. Two buyers can order the same Outdoor Swim Spa WS-PC06CH and end up with different jet counts, different water treatment, different insulation and a different power draw. The conversation you have with the supplier before the quotation is final therefore decides far more than the model code on the drawing. Below is the checklist we use when a villa or resort buyer asks us to price this unit, together with the figures currently shown in our own catalogue so you know what still has to be confirmed.
Start With the Site You Actually Have
The catalog entry for WS-PC06CH lists a footprint of 6000 × 3000 mm and a depth of 900 mm. Use those numbers to check the position on your plan; they are the catalog figures, and the delivered shell follows the configuration you confirm. Before you choose anything else, send us a dimensioned plan of the intended position: slab or deck edge, clear width and length, the direction the seating faces, and how close the unit sits to a wall, fence or glazed façade. Those five items drive the rest of the decisions.
- Access route. A 6 m shell has to travel through gates, around corners and onto the base. Tell us whether a crane, a tail-lift or manual carry is available on site; that changes packaging and sometimes the delivery method.
- Base and load. Confirm what the slab or deck will carry when full, and who is responsible for building it. The unit comes from us; the groundworks are normally done locally, so name that contractor early.
- Sightlines. If the spa faces a bedroom window, a neighbour or a pool terrace, jet placement and the position of the steps become design issues rather than plumbing issues.
The Specification Lines That Change Between Projects
Our catalogue page shows the following for this model. Treat these as the starting point of a configuration discussion, not as a locked specification:
| Item | Shown in catalogue |
|---|---|
| Model | WS-PC06CH |
| Catalog dimensions | 6000 × 3000 × 900 mm |
| Control system | 1 set |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Jet total | 38 pcs |
| LED lights | 1 pc |
| Total power | 3.25 kW |
| Features shown | Water jets, LED lighting, Ozone |
Each line needs a question attached to it:
Jets and seating layout
The jet total is listed as 38 pcs for the standard catalog configuration. Ask where those jets sit, not only how many there are: hydrotherapy value comes from jet position relative to the shoulders, lower back and calves. Tell us who will use the spa and for what — post-training recovery, guest leisure in a resort, daily use by an older family member — and we can move jets to match rather than shipping a generic layout.
Pumps and filtration
The page lists 2 water pumps and 1 filter pump. Confirm which pumps serve the jet circuit and which serve circulation, and what filtration is included as standard. Sand filtration appears in our optional-accessories list for this range, so if a project wants sand filtration rather than the arrangement quoted as standard, that has to be stated on the order.
Water treatment
Ozone is shown as a feature on this model. UV sterilization is listed among catalog options for the range. These are not interchangeable: state which one the project requires, and ask what the maintenance items are — consumables, service intervals and any dosing requirement — so operating cost is known before handover rather than after.
Heating and insulation
Total power on the catalog page reads 3.25 kW, and heat pumps and insulation both appear in the optional-accessories list for this range. That is exactly why the power figure has to be reconfirmed per configuration: a heated, insulated unit used year-round draws differently from an unheated unit used seasonally. Send us your target water temperature and how many months a year the spa will run; we will tell you which heater and insulation package matches that duty and what electrical supply the finished unit needs.
Steps, lighting and control
Steps are an option rather than an inclusion on this model, so agree entry side and step style early — they interact with decking and with the access route mentioned above. The catalog shows 1 LED light; if the design calls for lighting at more than one position or a coloured scheme for evening ambience, raise it in the same round of discussion. Confirm what the control system covers: temperature, pump operation, jet zones and lighting, and whether the display is mounted on the shell or placed elsewhere.
Shell and cabinet
Ask how the shell is supported and what the cabinet is built from, because both are set by the configuration rather than by the model code. Send the finish schedule from the design pack — shell colour, coping material, and how the surround deck meets the edge — and we will quote against it.
Matching the Spa to the Rest of the Outdoor Package
Poolside and terrace equipment rarely buys alone. When the spa is part of a villa or resort package, we coordinate it with outdoor furniture for villas and resorts — loungers, dining sets, pergolas and swing benches — so frames, finishes and fabrics read as one scheme and arrive on the same shipment. Where a project needs an unusual footprint, our Customizable Shape Outdoor Spa line covers square, round, oval and curved forms for gardens and terraces with constrained geometry.
Because we work as a turnkey furniture and building materials company, the spa can be scheduled against the same project programme as cabinetry, bathroom fixtures, lighting and flooring. That matters on site: a shell delivered six weeks before the deck is poured creates storage and damage risk, while one delivered late holds up handover.
How We Handle a Custom Swim Spa Order
- Brief and drawings. Send the layout, target water temperature, expected user profile and any finish schedule. Our design team returns a proposed configuration with dimensions and equipment listed line by line.
- Quotation and detail confirmation. Every option discussed above — jets, pumps, filtration, treatment, heating, insulation, steps, lighting, control — is written into the quotation as a named item, so nothing is assumed on either side.
- Production. The unit is built to the confirmed configuration, with equipment and finish checked against the signed specification before packing.
- Logistics. Freight by sea, air or rail, with commercial invoices, packing lists and origin documents handled on our side; delivery terms and duties are agreed case by case for the destination country.
- Installation support and after-sales. On-site installation guidance, inspection against a snag list, spare parts and ongoing maintenance. Warranty terms, response times and local installer arrangements are confirmed in writing for each project before dispatch.
What to Send Before You Ask for a Price
A complete enquiry gets a usable quotation back. Include: dimensioned site plan with access route; the intended base construction and who builds it; jet and seating priorities; filtration and water-treatment preference; target water temperature and months of use; the electrical supply available at the position and its supply type; shell colour and coping detail from the design pack; and the delivery window your programme needs. Anything missing from that list becomes a question we will send back, and each round of questions adds time to the order.