A rammed earth look on a curved reception wall, quoted at one flat price per square metre, can still arrive as rigid slabs nobody on site can bend. This is the checklist we work through when reviewing a quotation for MCM flexible rammed earth panel, so the figure you sign covers the wall you actually designed.
What the product line should say
Our MCM Flexible Rammed Earth Panel - Bendable Soft Stone Wall Cladding is a modified clay flexible stone, sometimes called soft ceramic or soft stone panel. It reproduces the layered, matte texture of a traditional rammed earth wall in a thin sheet that can be bent onto curved walls, cylinders and shaped surfaces, and it is fixed with tile adhesive over a cementitious base or gypsum board. Panels cut on site with simple hand tools.
Two colours cover most projects: white and earth brown. If your designer expects a custom tone or a different surface relief, that has to appear in the quotation as a separate line with its own minimum order quantity, not as an assumption carried over from a sample you approved.
Line items that are missing from most quotations
- Substrate preparation. Flexible panels need a flat, sound, dry base. Whether the existing wall is rendered first, and who supplies the bonding adhesive, changes both cost and programme.
- Bending radius. State the actual radius of every curved run on the drawings. Ask the supplier to confirm which panel thickness handles it and what fixing method they recommend for that curve.
- Cut allowance and waste. Cylinders, arches and shaped surfaces generate offcuts. A quotation that lists only net wall area understates the order quantity.
- Edge, corner and joint treatment. External corners, internal angles, skirting junctions and reveals need trim pieces or mitred joints. Ask whether these are included or priced separately.
- Adhesive and primers. Confirm the fixing system being quoted, its coverage rate per square metre, and whether it is suitable for the base board on your drawings.
- Outdoor exposure. For facade and exterior feature walls, confirm the finish or sealer being quoted for sun and rain exposure, and check that the fixing system specified is rated for external use.
Read the unit price against the delivered scope
A low rate per square metre means little if the pallet never reaches your port. Compare quotations on a delivered basis: packed panel area, adhesive and trims, carton dimensions against your container or truck cube, freight mode and Incoterms, and who clears customs. One landed figure for the whole wall package is easier to compare across suppliers than three separate invoices.
We handle this as one package. Our Wall Panels and Wall Cladding range ships alongside flooring, ceiling, joinery and lighting for the same project, so wall cladding can be consolidated into one shipment and one set of documents instead of several.
Sample and approval terms to insist on
- A physical sample of the exact colour and surface finish you intend to approve, with the batch or lot reference stated on the quotation.
- A written confirmation of panel thickness and the bend radius that sample was checked at.
- Batch or lot reference on the quotation, so reorders match the approved wall rather than drifting in tone.
- A named contact who answers technical questions about fixing details before the order, not only after.
How to compare two quotations side by side
| Check | Ask for in writing |
|---|---|
| Product definition | Panel name, thickness, colour, surface finish, batch or lot reference |
| Quantity basis | Net wall area plus stated cut allowance; number of sheets per curved element |
| Fixing system | Adhesive type and coverage, primer, trims, corner profiles |
| Curved work | Confirmed minimum radius, method, any surcharge |
| Exterior use | Sealer or finish specified, fixing system rated for external exposure |
| Packaging and freight | Packed cube and weight, Incoterms, mode, delivery address |
| Lead time and payment | Production window for the stated quantity, deposit and balance terms |
When flexible panel is the wrong answer
Flexible panel is a cladding finish, not a structural or waterproofing layer. Where the wall carries load, needs its own weatherproof rendered skin, or sits in a permanently wet zone, review the specification with your architect or builder before committing to a supplier order. In those cases rigid stone, tile or a different facade system may be the correct product, and a good supplier will say so rather than quote whatever you asked for.
Send us the drawings. Email the elevation views, curved radii and wall areas to SANTERSON, and we will quote panel quantity with cut allowance, fixing materials and delivered freight as one package for review against competing offers.