Wooden sliding panels are one of those products that look simple until the order is placed. A panel that slides well in a showroom can bind on site if the opening was measured to the wrong face, if the track has nowhere to be fixed, or if the finish was decided after the joinery detail was drawn. Most delays we see on residential wall system projects trace back to information that was missing at the very first enquiry.

If you are a builder, interior designer, project buyer or homeowner specifying wooden sliding panels for a villa, apartment or hospitality fit-out, the checklist below is what a manufacturer needs to give you an accurate quotation instead of a rough estimate that later changes.

1. The opening dimensions, measured to the correct face

Sliding panel systems are made to measure, so the numbers you send have to describe the real opening, not the drawing dimension. Before you contact a supplier, record:

  • Width and height of each opening, taken at several points across the span, because floors and head jambs are rarely perfectly level.
  • The finished floor and finished ceiling levels, or how much height is still to be built up by screed, tiling or plasterboard.
  • Clear depth available for the track, the panel stack and any shadow gap or reveal.
  • Whether the panels run in front of a wall, into a pocket, or past a corner where something else has to be kept clear.

Send photographs of the space from both sides plus a simple sketch with your dimensions written on it. A floor plan alone rarely shows the vertical conditions that decide track height and panel drop.

2. How many panels, and which way they stack

The number of panels and their stacking direction change both the hardware and the price. Decide in advance:

  • How many leaves you want, and whether each leaf is a single panel or a bi-fold pair.
  • Whether all panels stack to one side or split to the centre.
  • Whether the panels bypass each other on two tracks or hang in a single line.
  • The clear opening you actually need to pass through, including furniture and appliances during handover.

For room division, our partition sliding systems are configured around the same questions: layout, stack direction and made-to-measure sizing. Fixing those three points before an enquiry keeps the first quotation close to the final one.

3. Substrate and structure above the track

A sliding track carries a moving load repeatedly, and it can only be fixed securely into what is above it. Tell the supplier what you have or what you intend to build:

Condition above the openingWhat to send with your enquiry
Masonry or concrete headConfirm the material and whether the soffit is plastered, and give the fixing depth available.
Timber or steel stud wallSend the stud layout or note that noggins need to be designed in before lining.
Plasterboard onlySay so plainly. Reinforcement is usually needed and it is cheaper to plan than to retrofit.
Existing joinery or wardrobe carcassSend the carcass drawing, including internal depth and any shelf positions that interfere with the travel.

This single item prevents more site problems than any other. If the substrate is unknown, say so in your enquiry rather than guessing; a manufacturer who knows the condition can flag the reinforcement instead of discovering it at installation.

4. Material, core and finish you actually want

"Wooden" covers a wide range of constructions. State what matters to you in appearance first, then let the supplier match a suitable board and finish:

  • Species or grain if you are matching existing joinery, flooring or veneer - send the make and model reference, not just a photograph.
  • Painted, lacquered, veneered or laminated surface, and whether the panels will be seen from both sides.
  • Edge treatment on visible stiles, especially where panels bypass each other.
  • Any matching requirement with textured sliding panels, wall panelling or cabinetry elsewhere in the same project.

Where a specific surface is required, our custom and OEM service covers bespoke finishes and textures alongside made-to-measure sizing. Send physical samples by post when colour accuracy matters; photographs shift under different light, and a panel matched from a phone picture is a common source of disputes.

5. Hardware, operation and any acoustic requirement

Hardware choices are usually invisible once installed, which is exactly why they get left out of an enquiry. Specify:

  • Top-hung or bottom-rolling operation, and whether a floor track is acceptable in that room.
  • Handle style, recessed pulls, or push-to-open - and whether children use the space.
  • Soft-close or dampers on the leaves that see daily use.
  • Whether you need sound separation between the spaces. Acoustic performance depends on the selected configuration and sealing detail, so state the requirement and confirm what the chosen build delivers rather than assuming a figure applies to every layout.

Where separation is the point of the wall, our acoustic sliding panels are configured to the project's opening and layout; send the performance you are being asked to meet and let the build follow it.

6. Storage behind the panels, if there is any

Panels in front of a closet or storage wall need the interior resolved before the doors are made. Shelf heights, hanging rails, drawer positions and any internal lighting all affect the travel clearance and where a track can sit. For bedrooms and wardrobes, closet sliding panels are configured together with the interior layout so that doors, drawers and rails do not clash.

Send the internal elevation even if it is still a sketch. A supplier who sees the storage plan can tell you immediately when a drawer and a panel edge will interfere.

7. Programme, delivery address and who installs

Made-to-measure joinery sits on the critical path of a fit-out, so the commercial details belong in the first message:

  • The required site date, working backwards from handover rather than from when you are ready to order.
  • Delivery address and access - floor level, lift size, and whether panels can be delivered full height.
  • The trade terms you want quoted (for example FOB or CIF), and who handles import clearance at destination.
  • Who installs: your own crew, a local contractor, or the supplier's installation support. This decides whether instructions and fixing details go to you or to another trade.

Panel size is often limited by access rather than by the opening. Flag a tight lift or a narrow stair early; it changes how panels are split and jointed, and it should be priced from the start.

A short enquiry template you can copy

A message that gets a usable quotation back usually contains:

  • Project location and building type; the room and opening each panel set serves.
  • Measured widths, heights and available track depth for every opening, with photographs.
  • Panel count, stack direction and operation preference.
  • Substrate above the track, confirmed or flagged as unknown.
  • Material and finish reference, plus any joinery to match.
  • Hardware preference and acoustic requirement if applicable.
  • Interior storage layout where panels conceal storage.
  • Required site date, delivery address with access notes, the trade terms you want quoted, and who installs.
Send everything you have, even if incomplete. A manufacturer cannot advise on what is missing, so an enquiry that marks the open points clearly moves faster than one that quietly omits them.

Ready to price your opening

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008. Our sliding panel systems are made to measure, with material and finish options and layouts tailored to each project. Send your measurements, photographs and programme, and we will come back with a configuration and quotation built around the opening you actually have.

Browse the Wooden Sliding Panels collection, or contact our team to start a quotation.