A swim spa quotation is only as reliable as the information behind it. For an eight-metre plunge-and-swim shell such as Outdoor Swim Spa WS-PC08T, two enquiries from two different villas can produce prices far apart without either buyer seeing what changed. This guide sets out what to send us so the figure you approve matches the unit that reaches your site.

Why a swim spa quotation needs more than a model number

WS-PC08T sits in our configurable outdoor swim and hydrotherapy range, alongside the other shells in the Swimming Pools and Swim Spas category. The catalogue entry records a shell of 8000 x 3000 x 1500 mm, one control system, one swim training system, one water pump, one filter pump, 28 jets, three LED lights and a total power figure of 10.85 kW. Read those as the reference specification for the standard configuration rather than a fixed delivery list: what arrives on site depends on the options selected at quotation stage.

That distinction matters commercially. A villa owner comparing our number against a local pool contractor's is usually comparing two different scopes. One price may carry heat pump and insulation; another may stop at the shell. Send the details below and we can quote a scope you are able to compare line by line.

What to send with your enquiry

This is the information our project team works from. Drawings are not required for a first estimate, but each item you supply removes a revision later.

1. Site and access

  • Installation setting: recessed in-ground, semi-recessed, on-deck or terrace-mounted, with photographs of the area if this is a retrofit.
  • Ground conditions and slab details, plus how water drains away from the shell.
  • Delivery route: truck size limits, gate widths, whether a crane or HIAB lift is needed, and whether the position sits on an upper level.
  • Distance to the nearest power supply and to the water top-up point.

2. Electrical provision

  • Supply available on site: single-phase or three-phase, the voltage and frequency, and the main breaker rating.
  • Whether a dedicated circuit and isolator can be run to the spa position.
  • Total power for this configuration is listed at 10.85 kW. Your electrician should size protection against the final confirmed equipment schedule rather than that headline figure alone.

3. Water treatment and heating choices

  • Ozone appears as a standard feature on this model; UV sterilisation and sand filtration are catalogue options that change both price and the plant space required.
  • Heat pump duty, and whether the spa runs year-round or seasonally.
  • Insulation specification, which carries more weight in running cost than shell footprint does and should be fixed once the operating season is settled.

4. Use case and occupancy

  • Primary purpose: laps against the swim training unit, hydrotherapy for a set number of bathers, or a mixed family-and-guest arrangement.
  • Expected simultaneous users, which drives jet layout, seating positions and pump duty.
  • On hospitality sites, whether the spa is guest-only, member-facing or part of a treatment programme.

5. Commercial terms

  • Delivery address and preferred delivery terms; our logistics service covers sea, air and rail freight with the customs documentation handled on our side.
  • Whether you need delivery only, or delivery combined with installation support.
  • Quantity, if the enquiry covers a development rather than one villa.

Reading the specification sheet without over-reading it

Jet count is the figure buyers fixate on and the easiest to misread. WS-PC08T lists 28 jets, while a narrower shell in the same family, Outdoor Swim Spa WS-PC08ST, is listed at 6 jets with a lower total power figure. Same eight-metre length, very different hydrotherapy character and electrical load. If you are shortlisting more than one model, ask for the equipment schedule behind each line instead of comparing headline numbers.

Where the spa must fit a fixed footprint or follow a curved terrace edge, our Customizable Shape Outdoor Spa covers square, round, oval and curved shells in an acrylic body with structural reinforcement. For that route send the layout drawing early: a shape change runs through seating, jet placement and access panel positions, and it costs far less to resolve before production begins.

What happens after you send the enquiry

Our project workflow runs through consultation, design and planning, production, logistics, installation and after-sales. For a swim spa enquiry that breaks down as:

  • An equipment schedule confirmed against your site conditions, with every requested option priced separately so substitutions stay visible on the page.
  • Clearance and plant notes for your builder or landscape contractor, including access panel positions for the filter pump and control system.
  • Packaging and container loading plan once the configuration is signed off, since an eight-metre shell dictates how the shipment breaks down.
  • Installation and commissioning guidance at handover, with spare parts listed against the confirmed specification.

Warranty terms, response times and installer arrangements differ by destination. We set them out per project in writing rather than quoting a blanket policy, so raise your specific site instead of assuming a figure from marketing material.

Before you send: check that the model code and shell dimensions on your drawing match the catalogue entry being quoted. If your specification names a variant we do not list under that exact code, say so in the enquiry and we will map it to the nearest production configuration rather than guess at it.

Two enquiries, two very different outcomes

The first reads only "WS-PC08T, price please". The quotation returned covers the standard configuration shipped to port, and the buyer later absorbs a heat pump, an insulation upgrade and an electrician's surprise on discovering that three-phase supply is not available at the spa position.

The second states recessed installation onto a prepared slab, three-phase supply within a short run of the spa position, year-round operation, sand filtration added, four regular bathers plus one daily swimmer, and delivery to Melbourne with installation support. That quotation is longer to produce and to read, but it is the one that lands close to the final invoice.

Send us your WS-PC08T enquiry

Attach site photographs, supply details and your intended use, and our team returns a quotation built on that configuration. Contact PHILLIP on +86-13928214007 (phone and WhatsApp), email santerson@qq.com, or use the contact page. Office hours are Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8), and enquiries receive a response within 24 hours.