A mixed open and closed wall unit looks simple on a drawing: some shelves on show, some doors to hide the clutter. In production it is one of the easiest places for a project to go wrong, because the visible surfaces carry every tolerance, edge and colour decision twice. If you are specifying Santerson Mixed Open & Closed Systems for a villa living room, a guest suite or a lounge, the following finish details are the ones worth putting in writing before an order is released.
Why finishes matter more on a mixed unit than on a fully closed one
On a fully closed cabinet, the door does most of the visual work and everything behind it stays out of sight. A mixed open and closed system puts carcass interiors, shelf edges, back panels and hardware in permanent view, right next to the door fronts. That means two families of surfaces have to agree with each other: colour, sheen, grain direction and edge treatment all sit side by side at close reading distance.
These systems are made to measure, with layout, dimensions and finish specified per project. That flexibility is the point of the product, but it also means nothing is standard until you confirm it. The questions below are the ones we suggest putting into your specification sheet or purchase order, so that what arrives on site matches what was approved.
1. Surface material and sheen: name the exact option
Santerson's cabinetry and joinery ranges are offered across several surface families, and each one reads differently under the same lighting. When you specify a finish for this system, record the surface family and the sheen level together, not just a colour name or a code.
| Surface family | What to confirm before ordering |
|---|---|
| Wood veneer | Species and cut, grain direction across doors and shelf sides, whether grain runs vertically or horizontally on adjacent units, and the sheen of the topcoat (matte or higher gloss). |
| Lacquer | Number of coats, sheen value, and how the panel is finished on all faces if edges will be visible in open bays. |
| Acrylic | Whether the panel is edge-wrapped or edged with a separate strip, and the direction of any directional or metallic effect. |
| Melamine / laminated board | Décor reference, surface texture, and the matching edge tape for every exposed board edge. |
Where a project needs joinery elsewhere in the same building to match, it is worth referencing an existing approved range rather than describing a colour from memory. Wardrobe collections such as matte finish veneer, matte lacquer and matte acrylic panels are specified the same way, so a matching decision can be carried consistently across bedrooms, living areas and built-in units.
2. Exposed edges and shelf thickness
This is the detail most often left out of an enquiry. On open bays every edge is a design line, so confirm for each visible board:
- Board thickness for shelves and vertical dividers, and whether it changes between load-bearing spans and display niches.
- Edge treatment: solid timber lipping, matching ABS/PVC tape, or a wrapped panel edge, plus the tape reference where tape is used.
- Edge radius or chamfer, which decides whether the shadow line reads sharp or soft next to a door front.
- Maximum unsupported shelf span and any intermediate supports needed for books, stone or heavy display pieces.
3. Interior finish of closed compartments
Doors open, so the inside is part of the product. Specify the carcass interior colour and sheen, whether it matches the exterior or is a lower-cost standard option, and how the back panel is fixed and finished where it is visible in an open bay. Where the unit holds glassware or display objects, ask what the shelf surface is and whether a protective lining is available.
4. Doors, drawers and hardware
- Door style and panel profile, and whether handleless (push or profile-pull) or a named handle; record the handle model and finish.
- Hinge and slide brand or series, load rating, and whether soft close is included on every door and drawer.
- Drawer count, sizes and interior layout: dividers, trays, pull-out baskets or plain boxes.
- Door alignment method (overlay, inset or flush) and the gap width between doors and adjacent open frames.
5. Lighting and services inside the unit
Integrated lighting changes a mixed unit from furniture into a wall composition, and it has to be coordinated before panels are cut. If you want lit niches or shelves, specify the fitting type and finish, driver location and access, switching or dimming control, cable routes, and the electrical ratings for your market. Santerson's integrated cabinet lighting range is configured together with the unit; where media or appliances sit in the wall, plan ventilation and service access at the same time. Confirm electrical specifications and compatibility with the cabinet design for your project.
6. Fixing, site conditions and tolerance
A made-to-measure wall system only fits once. Before manufacture, confirm:
- Final floor, wall and ceiling finishes in the area, plus setting-out levels and any scribe or filler panels.
- Wall construction and fixing method for suspended or floor-to-ceiling elements, including any reinforcement required.
- How skirting, architraves, cornices and switches are resolved where they meet the unit.
- Delivery route, lift or stair dimensions, and how the units will be brought to the opening.
7. Samples and approvals: what to sign off
For any project of more than one unit, we recommend a physical approval sequence rather than a colour chat:
| Stage | What you approve |
|---|---|
| Finish sample | A real panel sample in the chosen surface and sheen, viewed on site in both daylight and artificial light, including its edge treatment. |
| Shop drawing | Dimensions, layout, door swing and drawer positions, shelf spans, lighting positions, and the finish callout for every visible face. |
| Bench check | Door alignment, hardware operation and lighting function before crating, with a snag list recorded. |
A short specification checklist
Copy this into your enquiry so the quotation comes back comparable:
- Surface family, décor reference and sheen for exterior faces; interior colour and sheen.
- Shelf thickness, edge treatment and tape or lipping reference for every exposed edge.
- Door style, hardware series, handle finish, soft-close scope, drawer interiors.
- Lighting fittings, control, driver access and electrical ratings for the destination market.
- Made-to-measure dimensions tied to confirmed finished levels, with scribe panels noted.
- Delivery terms, packing standard, installation support and what is covered afterwards.
Related wall systems in the same family
If the design calls for more concealment or a different balance of display, these configurable collections are usually quoted alongside a mixed unit and share the same finish-approval process:
- Santerson Mixed Open & Closed Storage — the integrated storage wall version of the same open/closed idea.
- Santerson Closed Modular Units — where most contents are behind doors.
- Santerson Open Display Niches — for lit display bays inside a wall system.
- Santerson Floating Modular Systems and Floor to Ceiling Modular Systems — for wall-spanning or suspended compositions.
How Santerson supports this from order to site
Santerson is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008. For built-in work the company offers custom furniture design and prototyping, bespoke material finishes and textures, OEM manufacturing and flexible minimum order quantities, alongside project coordination from drawings through production. Freight is arranged by sea, air and rail with customs paperwork, packing and door-to-door delivery, and installation, inspection and after-sales support are part of the service scope. Terms such as Incoterms, duties, transit time, warranty coverage and response times vary case by case, so have them confirmed in writing for your project.
Send us your drawings
Share the layout, the finishes you are working to and the destination country, and we will quote a configuration with the finish schedule, edge details and hardware listed line by line. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com, or use the contact page.