A cabinet quotation is not one number. It is a set of decisions written down, and the differences between two quotes usually sit in the lines that are easiest to skim past. If your project includes the Santerson Glass Front Pvc Cabinet, this guide lists exactly what a complete, comparable quotation should state, so you can line up offers side by side instead of guessing which one is really lower.
Work through the sections below in order. Each one names the item to confirm, why it changes the delivered cost, and the question to put to the supplier in writing.
Start From the Drawing, Not the Cabinet Count
PVC kitchen cabinetry in this range is made to measure: sizing, material and finish are specified per project, and the layout follows the space. That means a quote based on "twelve metres of kitchen" is not a quote at all yet. Ask for the quotation to be built from a dimensioned elevation drawing that your team has signed off, with each run, return and appliance housing shown.
- Elevation drawings with overall height, depth and run lengths marked, plus floor-to-ceiling restrictions such as skirting, cornices and service runs.
- A plan showing the working triangle and door swing directions, so cabinet doors and glass fronts do not clash when opened.
- The exact wall build-up where tall or wall-hung units are fixed, because fixing details change once tile, insulation or framing is involved.
A supplier who quotes from a signed drawing is quoting the same job you will receive. A supplier who quotes from a room size is quoting an estimate that will move at the first site measurement.
Read How "Glass Front" Is Actually Specified
Two quotes can both say "glass front" and describe different products. For a glazed door on a PVC cabinet, the items worth separating out are:
| Item | What the quote should state | Why it matters |
|---|---|---|
| Glass type and thickness | Clear, frosted or tinted glass; the thickness; tempered or not | Sets cost, safety behaviour and how much contents show through |
| Glazing method | Bead, rebate, silicone-set or removable trim; whether the glazing bead is visible on both faces | Affects cleaning, glass replacement and whether a broken pane can be swapped on site |
| Door construction | Frame profile, whether the frame is PVC with an aluminium edge, and how corners are joined | Determines whether the frame holds square after repeated opening |
| Handle and opening method | Profile handle, recessed pull or push mechanism; matching solid-door hardware | Mixed hardware across a run is one of the most common snag list items |
| Lining and interior finish | Interior colour of the carcass behind the glass, plus shelf material and edge banding | Glass doors show the inside face; a mismatched lining reads as a defect |
| Lighting interface | Whether lighting is quoted with the cabinet, and where the transformer, switch and cable route sit | Wiring discovered after delivery turns into site variation costs |
Where a product page lists made-to-measure sizing and finish options without fixed figures, ask for the specification to be written into the quotation itself. Do not assume that a brochure image equals the delivered detail.
Check the Body, Shelves and Hardware Line by Line
The door is what people see; the carcass and hardware decide how the cabinet wears. A comparable quote lists these separately rather than bundling them into "cabinet as per drawing".
- Carcass material and thickness. Confirm what the box is made of and whether it matches the door specification, or whether a different board is used for bodies.
- Edge treatment. Edge banding on visible edges, and who quotes the profile that closes the glass rebate.
- Hinges and runners. Brand and model line, soft close or not, load rating for drawers, and whether cover plates are included.
- Shelves. Number, material, thickness, adjustability, and whether glass shelves behind glazed doors are quoted with supports.
- Fixings and levelling. Plinth or toe kick, adjustable legs, wall rails and packers — the items most often left out of a low quote.
Ask for hardware to be quoted as a visible line list with quantities. When two offers differ sharply in price, the gap is usually here rather than in the doors.
Confirm What the Finish Line Covers
PVC-wrapped fronts are chosen for their look and their consistency across a run, so the quotation should say how that finish is delivered and protected. Put these in writing:
- The exact finish reference — colour, gloss level and grain direction — with a physical sample approved before production.
- Whether all doors for one room come from the same production batch, so sheen and tone match across the run.
- Which surfaces are finished on all faces, and which edges stay unfinished because they are hidden by the wall or plinth.
- Packaging standard for glazed units, including corner protection and whether glass travels loose or pre-glazed.
Related products in the same collection show how wide the option set is: High Gloss PVC Cabinets for a reflective front, matte pvc cabinets for a low-sheen front, and wood grain pvc cabinet finishes when the glazed front needs to sit against timber tones. If your quote names only one of these, ask whether the alternative finish carries a different price before you commit.
Price Structure: What Must Be Separated Out
A single all-in figure hides risk. Ask each supplier to break the offer into the same six blocks so the comparison is honest.
| Block | Question to ask |
|---|---|
| Unit prices | Price per cabinet module, not per linear metre, so substitutions are visible |
| Customisation | What is charged extra for non-standard height, depth or a made-to-measure opening |
| Glass and hardware | Glass type, thickness and hardware model as separate priced items |
| Design and sampling | Whether drawings, revisions and the pre-production sample are included or billed |
| Packaging and freight | Container or shipment basis, Incoterms, insurance, customs paperwork and who clears import |
| Site work | Whether installation, on-site adjustment and snag rectification are in scope, and by whom |
For an overseas order, the freight block is where a low quote becomes an expensive one. Confirm the trade term on the quotation, whether duties and taxes are excluded, and whether glazed modules travel in the same container as carcasses or separately.
Lead Time, Tolerances and Site Handover
Glazed cabinets fail on site for two reasons: measurement drift and unclear handover. Close both in the quotation terms.
- Final measurements taken after wall finishes, tiling and floor levels are complete — with the date of that measurement recorded
- A stated tolerance for the opening, and who is responsible for making good if the built opening differs
- Production start defined as "after approved drawing plus approved finish sample", with both named in the order
- Delivery address, delivery window and storage arrangements confirmed before dispatch
- A snag process: what gets rectified, who attends, and how replacement glass or a replacement door is ordered
- Warranty terms in writing, including what is excluded for glass, hardware and finish
Response times, warranty periods and installer arrangements vary by project and region. Treat any figure quoted in marketing copy as something to confirm on your own order documents before it reaches a programme or a client report.
Who Should Sign Off Before the Order Is Placed
For a villa or hospitality fit-out, the cabinet order touches several trades. The quotation should be reviewed by the designer who issued the elevations, the site lead responsible for openings and levels, and whoever signs the import paperwork. When cabinetry is coordinated with other joinery and finishes in one package, that coordination is usually where time is saved — see Turnkey Interior Project Solutions for how a single supplier scope covers design through installation.
If the glazed units sit in a kitchen or bar run, compare the cabinet quote with Custom Kitchen Cabinets for Residential and Hotel Projects, so appliance housings, tall units and glass-front doors are specified on the same drawing revision rather than in separate orders.
A Five-Minute Comparison Test
Take two quotations and put them side by side against four questions. If either answer is vague, the quote is not comparable yet.
- Does each cabinet have a module number that appears on both the drawing and the packing list?
- Is every glass pane specified by type, thickness and glazing method?
- Is hardware named by model rather than described as "soft close throughout"?
- Are freight, duties and site installation either priced in or explicitly excluded?
Two offers that pass these four tests can be compared on price with confidence. Two that fail them will produce a variation order later, at whoever's cost the contract does not name.
Send your elevations and finish references for the Santerson Glass Front Pvc Cabinet and receive a quotation broken into the blocks above — unit prices, glazing, hardware, sampling, freight and site scope — so every line can be compared. Enquiries are handled through Contact Us.