A swim spa is not a catalogue item you can order by model code alone. Before Outdoor Swim Spa WS-S06B-T reaches production, the manufacturer needs a brief that states where it will sit, how it will be used, and which equipment belongs in the finished unit. The clearer that document is, the fewer revision rounds you will run and the more accurate your quotation will be. Here is what to put in front of the factory.

Start With the Site Conditions, Not the Product

Send the site information first. An outdoor swim spa sits on a prepared base, draws power from a local supply, and is reached by delivery vehicles through whatever gate or driveway the property offers. The manufacturer cannot size packaging, plan loading, or confirm equipment options without knowing:

  • The exact placement — terrace, garden, pool deck, rooftop or an indoor recess — plus the finished floor level and the clear access route from the street.
  • The base detail: slab thickness, reinforcement and drainage around the shell.
  • Electrical supply available on site: phase, voltage and the location of the isolator and control point.
  • Whether a crane, forklift or manual carry is realistic at the delivery point.

This is also where you flag local approval requirements. Import rules, electrical certification and building permits are handled by the buyer's local consultants; state them in the brief so the factory designs to your conditions rather than to a generic assumption.

List the Configuration You Actually Want

WS-S06B-T is part of a configurable outdoor swim and hydrotherapy range. The catalogue records the following for this model:

Item shown in the catalogueCatalogue entry
ModelWS-S06B-T
Dimensions5800 × 2200 × 1420 mm
Control system1 set
Swim training system1 set
Water pump / filter pump1 pcs / 1 pc
Jet total40 pcs
LED lighting3 lights plus 26 small LED lights
Total power8.75 kW
Features shownWater jets, temperature setting, LED lighting, ozone, swim training system

Treat these figures as the starting point of the conversation, not the final specification. Confirm the included equipment and the electrical requirements for the configuration you select in writing before the order is placed.

Separate Standard Equipment From Options

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so list each option you want and ask the factory to confirm it applies to WS-S06B-T. Two decisions matter most for running cost and comfort:

  • Heating. State your target water temperature and how many months a year the spa will be used. That drives the heat pump sizing and the insulation package.
  • Filtration and sanitation. Ozone appears in the standard feature list; UV sterilisation and sand filtration are options. Say which combination you expect, and who maintains it after handover.

Say How It Will Be Used

Usage patterns change the specification more than buyers expect. A lap swimmer needs the swim training system set for continuous counter-flow; a hotel or villa guest programme needs jet positions, seating depth and entry steps arranged for a wider range of users; a family household usually asks for shallower seating and easier access. Write down:

  • Primary use — swim training, hydrotherapy, casual soaking, or a mix.
  • Expected number of bathers at one time.
  • Who operates and maintains the unit after handover.
  • Whether the spa sits inside a larger outdoor package alongside outdoor furniture, paving and lighting, so that finishes and levels are coordinated across trades.

Ask About the Non-Standard Route Early

If the site does not fit a catalogue footprint, raise it at the enquiry stage rather than after a quotation. Shapes can be customised for constrained gardens and terraces — see Customizable Shape Outdoor Spa, Personalized Hydrotherapy Pool — and SANTERSON's Custom & OEM Service covers bespoke sizing, material finishes and prototyping. A custom shell changes drawings, lead time and packaging, so it needs to be in the first version of the brief.

Set Out Delivery and Installation in the Same Document

A swim spa is a heavy, glazed, instrumented unit that travels internationally. The brief should state the delivery address, the Incoterms you intend to trade on, and who handles import clearance. Logistics & Door-to-Door Delivery covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking; Installation & After-sales Support covers on-site installation, inspection and snags, spare parts and maintenance. Confirm the practical details for your country case by case — transit arrangements, warranty terms and installer availability all vary.

A Short Checklist to Attach to Your Enquiry

  • Model reference: WS-S06B-T, with a marked-up catalogue page showing what is included and what is optional.
  • Site plan, access route, base detail and electrical supply.
  • Target water temperature, season of use and expected bather load.
  • Option list: heat pump, insulation, UV sterilisation, sand filtration, steps, control upgrades.
  • Quantity and whether this is a single villa unit or a multi-unit hospitality order.
  • Delivery terms, destination port or address, and who clears customs.
  • The questions you need answered in writing: confirmed equipment list, electrical requirements, spare-parts supply and what happens if the site conditions change after production starts.

One sentence worth adding to any brief: "Please confirm the included equipment and electrical requirements for this configuration, and identify anything in our specification that is not available on WS-S06B-T." That single line forces the gaps into the open before a quotation becomes an order.

Send your brief to SANTERSON, a China-based furniture and building materials manufacturer working on villa, hospitality and office projects worldwide. Tell us the site conditions and the configuration you want for WS-S06B-T, and we will confirm the equipment list, options and delivery arrangements for your project.