A laundry area falls out of the drawings late on many villa and apartment projects, and it is usually the cabinetry that suffers. The appliance schedule arrives after the joinery detail has been signed off, so the cabinet is asked to fit whatever is left of the room. Our WasherDryer Cabinets are made to measure for each project, which means the specification conversation can start with the room and the appliances rather than with a catalogue size. The list below is the set of measurements and project inputs we ask buyers, designers and contractors to send before we quote laundry joinery.
Why the cabinet needs its own set of dimensions
Washing machines and tumble dryers are sold as free-standing boxes with service clearances around them. A built-in enclosure changes the rules: the doors of the cabinet have to swing or slide without hitting the appliance controls, the hoses and power outlets sit behind the carcass and still need access, and ventilation has to leave the machine enough air to work as the manufacturer intends. None of that can be resolved from a plan view alone, which is why we treat laundry cabinetry in the same way as kitchen cabinetry — measured on site, coordinated with services, then drawn for approval.
Measurements to take before the enquiry
| Input | What to record | Why it matters |
|---|---|---|
| Clear opening | Width, height and depth of the space, measured at floor level, mid-height and ceiling level; note finished floor height if the floor covering is not yet laid. | Older buildings are rarely square. Three readings per axis tell us whether the carcass can be levelled or has to be scribed. |
| Appliance footprint | Model reference from the appliance schedule, or width, depth and height of each machine plus door swing direction. | Determines shelf heights, whether a stack is possible and how much clearance the cabinet doors need. |
| Services positions | Height and offset of water inlet, waste outlet, power points and any isolating tap; note whether they sit in the wall cavity or surface mounted. | The carcass has to allow access without cutting through structural panels, and the plinth has to clear what is already fixed. |
| Door and traffic line | Where the room door swings, and whether the cabinet face will block circulation when open. | Decides hinged, sliding or bi-fold fronts on the enclosure. |
| Adjacent finishes | Wall finish, skirting detail, floor material and any window reveal or radiator within the run. | Lets us plan scribes, end panels and a front that reads as part of the room rather than an addition. |
Send photographs of the space from each wall, with the tape visible in one of them. A short set of photos resolves most of the questions that would otherwise come back as email exchanges.
Project inputs that shape the layout
Beyond the tape measurements, four project decisions change what we build:
- Stacked or side by side. A stacked pair puts the dryer at working height and frees floor space for a folding surface; a side-by-side pair keeps both appliances at a comfortable loading height but consumes more width. Our Stacked Laundry Units are drawn around the stacked arrangement, with the enclosure and shelf detail designed for that configuration.
- How much storage the household or guest floor needs. Detergents, linen, ironing and hanging space each need a different depth. Where the room is narrow we work vertically instead, using tall units and pull-out fittings so the floor area stays clear.
- Whether the laundry is a shared service space. On apartment and villa projects the same wall often carries Laundry & Storage Combo runs, so the linen store, hamper and appliance enclosure are drawn as one elevation with a consistent door profile.
- The finish language of the rest of the building. Laundry fronts usually continue the kitchen or bathroom joinery. Tell us which door style and surface you have specified elsewhere — handleless, shaker, high gloss or matte — and we match the carcass to it rather than proposing a separate look.
How the inputs come back as drawings
Once we have the measurements, appliance data and finish direction, we return marked-up elevations showing the enclosure, shelf positions, ventilation route and service access. You approve or adjust on paper, and production follows the approved drawing. Because these cabinets are made to measure with material and finish options chosen per project, nothing in that drawing is a compromise against a fixed size — which is exactly what makes early measurement worth the effort.
Send us the room dimensions, the appliance schedule and one elevation sketch, and we will come back with a layout you can put in front of the client.
Common specification problems we see
- Appliance depth measured without the hoses. A machine pushed hard against the wall loses its waste connection. We allow for the plumbing set-back in the carcass depth, but only if the outlet positions are known.
- Ventilation left to chance on a stacked pair. The enclosure must not trap heat around the dryer. We show the air path on the drawing and build the corresponding openings into the panels.
- Cabinet doors specified before the control panel is checked. Some appliance controls sit proud of the front face, which changes the reveal needed for a flush door.
- No allowance for levelling. Where floors are out of level by more than a few millimetres over the run, an adjustable plinth and scribed end panels keep the front line straight.
Where laundry joinery sits in a wider package
On most of our projects the laundry is one elevation inside a larger fit-out that also covers bathrooms, kitchens and built-in storage. Ordering it together with those elements means one drawing set, one production run and one shipment, and the door profiles, worktop materials and hardware are consistent across the whole building. If your project needs cabinetry, sanitary fixtures or other interior fixtures from the same supplier, our turnkey solutions cover design coordination, custom manufacturing, door-to-door delivery and installation support as one scope.
A short checklist for your enquiry
- Three readings each for width, height and depth of the space, plus finished floor level.
- Appliance models or their dimensions, with door swing direction.
- Positions of water inlet, waste and power, with a photo of the wall.
- Door style and surface finish specified elsewhere in the project.
- Storage requirements: linen, hanging, ironing, hamper, folding surface.
- Delivery destination and the installation arrangement you have on site.
If any of those items is still unknown, send what you have. Part information is enough for us to produce a first layout and mark the questions that remain, which is usually faster than waiting for a complete survey.
Talk to us about your laundry cabinetry
SANTERSON has manufactured furniture and building materials for residential, villa and hospitality projects since 2008. Send your measurements, appliance schedule and finish direction, and we will return drawings and a quotation for the enclosure. Contact PHILLIP by phone or WhatsApp on +86-13928214007, or by email at santerson@qq.com.