A tall cabinet looks simple on a drawing: a floor-to-ceiling box with doors. In production it is one of the easiest items in a joinery package to get wrong, because everything that matters — height, door swing, internal layout, load path, finish edge detail — sits inside the carcass and only becomes visible after delivery. A product submittal is where those decisions are fixed before your purchase order is released.

The Santerson Utility Tall Cabinets page describes a configurable tall unit for residential projects, where finish, layout and dimensions are specified per space. That configurability is exactly why the submittal matters: nothing about this item is standard until you write it down and both sides sign it. Below is the checklist we use when preparing and reviewing these documents, so that what arrives on site matches what the designer intended.

1. Dimensional Drawings: Overall Size, Interface Levels and Tolerance

Send a dimensioned elevation of each unit, not one generic detail. A submittal that shows a single typical section cannot be checked against a room.

  • Overall height, width and depth for every unit, tied to the grid or wall reference on your architectural drawings.
  • Floor finish levels. State whether the dimension includes the finished floor, and how much build-up is expected. A 20 mm difference in screed or tile changes a recessed niche into a protruding one.
  • Ceiling interface. Say whether the unit stops at the slab, meets a set-down, or is scribed to a plasterboard ceiling — and who supplies the scribe.
  • Adjacent obstruction. Skirting, door architraves, pipework and switch plates should appear on the drawing with their offsets.
  • Tolerance and adjustment. Record the allowable manufacturing tolerance and how the unit is levelled or scribed on site.
If a dimension appears only in a schedule table and never on a drawing, it will be interpreted differently by the designer, the factory and the installer. Draw it once and reference that drawing everywhere else.

2. Carcass, Door Construction and Material Schedule

Name every material as a specification, not as an appearance. "Grey matte" is a look; a board grade with a named finish system is a specification.

  • Carcass substrate and thickness, plus edge banding material and colour code.
  • Door construction type — flat panel, framed, shaker or glass-fronted — with the core and surface layer identified.
  • Finish system, including primer and top-coat, or the laminate, acrylic or veneer make-up, together with the reference code you are holding the factory to.
  • Backing panel thickness and fixing method, which affects how the unit absorbs wall irregularity.
  • Exposure conditions. For bathroom-adjacent installations, record the humidity exposure so board grade and edge sealing can be selected against it rather than assumed.

3. Internal Layout: Shelves, Drawers and Storage Bays

The internal layout is where project-specific value lives, and where a vague submittal costs the most to revise later.

  • Shelf positions, fixed versus adjustable, with pitch and shelf-pin system identified.
  • Drawer stack: number of drawers, front heights, runner type and extension. Confirm whether soft-close applies to runners, doors or both.
  • Hanging or broom bay: rail height and quantity. A unit that has to take a vacuum cleaner, ironing board and cleaning supplies needs a different bay from one holding towels and bed linen.
  • Clear aperture and shelf depth for the deepest drawer, checked against the actual items the client intends to store — not against a typical section.
  • Appliance integration, if any. Where a tall unit houses an appliance, as in our Integrated Appliance Tall Cabinets, the submittal must carry the cut-out dimensions, ventilation route and electrical point location taken from the appliance manufacturer's own sheet.

4. Hardware Schedule with Brands and Load Ratings

ItemWhat the submittal must state
HingesBrand, model, cup diameter, opening angle, soft-close yes/no, quantity per door
RunnersBrand, model, extension, load rating, soft-close, fixing method
Handles or profilesFinish code, centre distance, screw length; for a handleless design, the profile section and edge detail
Shelf supportsSystem type, load per shelf, spacing
Kickplate or plinthMaterial, height, recess, whether removable for access
Wall fixingsBatten or bracket detail, fixing type by wall substrate

Where a handleless look is required, draw the door edge profile and finger clearance rather than supplying a photograph. A sample can look correct while the production edge feels wrong to use — the same detail governs handleless minimalist kitchen cabinetry, where the profile sets both appearance and grip.

5. Finish Samples, Colour Codes and Batch Control

A submittal that names a colour without a physical sample and code invites a mismatch between this cabinet and the rest of the joinery package.

  • Physical sample of door face and carcass edge, signed and dated by the approving party and retained as the production reference.
  • Finish code and batch note, which matter most for wood veneer and for metallic or high-gloss surfaces where sheen varies between batches.
  • Grain direction marked on the elevation — vertical or horizontal — including on each drawer front within a stack.
  • Matching scope: state whether this unit must match an order already produced, and quote that order's code instead of requesting a fresh sample.

6. Interface Details: Door Swing, Reveals and Clearances

Tall units fail most often at the interface rather than inside the box.

  • Door swing and door sequence for double-door units, with the reveal between doors dimensioned.
  • Corner returns, if the run turns a corner. Our Corner Tall Cabinets show how a returned run is configured; draw the return width on your elevation.
  • Door-to-wall and door-to-appliance clearance, checked against handle projections and against any appliance door that must open beyond 90 degrees.
  • Base detail: whether the unit is on adjustable feet, a set-back plinth or a raised base, and how it meets the floor finish.
  • Service access. If the unit covers a valve, trap or filter, show the access panel or removable shelf on the elevation before production starts.

7. Performance Claims: Ask for the Document Behind the Number

Do not accept a generic supplier statement in place of documentation your consultant can verify.

  • Board grade and formaldehyde class, with the test report attached rather than a label name alone.
  • Hardware cycle-test data from the hinge and runner manufacturer.
  • Fixing detail by wall substrate, checked against your joinery or structural engineer's requirements where the unit is tall, heavily loaded or fixed to a non-solid wall.
  • Moisture or fire classification only where your project actually requires it — and then with certificate numbers verified for the destination market, not assumed from domestic paperwork.
Any performance figure quoted in a submittal should carry a document reference. A number without a test report is marketing copy, and it will not survive a consultant's review.

8. Packaging, Marking and Delivery Sequence

A tall cabinet is long, heavy and awkward to carry through a finished interior, so the logistics section belongs in the same document as the technical one.

  • Packaging build-up: corner protection, panel separation, and carton marking with room and unit codes that match your delivery schedule.
  • Panelised or assembled supply — and if panelised, include the assembly drawing and fixing sequence.
  • Delivery sequence by room, so tall units arrive after wet trades and floor finishes are complete.
  • Access route check: confirm lift, stair and door widths against the longest single package.

9. Installation Method and Snag Tolerance

  • Fixing method and sequence, including levelling and wall battens, and who supplies them.
  • Sealing and make-good responsibility at wall, ceiling and floor lines.
  • Snag tolerance stated numerically — door alignment, reveal variation, levelness — so acceptance is not a matter of opinion at handover.
  • Care and cleaning instructions for the specified finish, issued with handover.

10. Approval Block, Revisions and Version Control

Every page should carry a document number, revision, date and approval signature line. Mark each change visibly and re-issue the complete submittal instead of annotating an old PDF. If production starts from "revision 3 approved" while someone on site is holding revision 1, the resulting argument is paid for by whoever cannot prove which drawing was signed.

Submittal Readiness Checklist

SectionIncluded?Approved / Comment
Dimensioned elevations per unitYes / No
Floor and ceiling interface detailYes / No
Material and finish schedule with codesYes / No
Internal layout, shelf and drawer scheduleYes / No
Hardware schedule with load ratingsYes / No
Signed physical finish sampleYes / No
Door swing, reveal and clearance checksYes / No
Appliance cut-out, ventilation and electrical pointsYes / No
Test reports for board grade and hardware cyclesYes / No
Packaging, marking and delivery sequenceYes / No
Installation method and snag toleranceYes / No
Revision control and approval signaturesYes / No

What This Means When You Order Made-to-Measure

Because these cabinets are built to the space, the submittal is also where a supplier demonstrates they can coordinate a whole joinery package rather than sell one item on its own. A utility unit rarely stands alone: it has to match the linen cabinets in the same corridor, and sit on the same finish codes as the kitchen run — for example our custom built-in kitchen cabinets. Working with one one-stop furniture and building materials supplier keeps those items inside a single drawing set, finish schedule and revision history.

SANTERSON works on villa, hospitality and office projects, covering design coordination, custom production, door-to-door delivery and installation support. Send us your room drawings together with what each unit must store, and we return a submittal pack in the structure above for your review before any production release.

Send us your tall cabinet schedule. Provide elevations, floor finish levels and the storage items each unit must carry, and our team prepares a dimensioned, fully specified submittal for approval — hardware schedule, finish samples and packaging plan included.

Contact SANTERSON to open a submittal review for your project.