A glass paneled wardrobe often gets approved on a render. The elevation looks clean, the client likes the way light moves through the doors, and the schedule is already tight. What has not been settled yet are the details that decide whether the unit fits the opening on site, hangs true and still reads well years into occupancy. Below is the checklist we ask project teams to work through before sign-off, written from what our production and coordination teams have to resolve on every joinery package.
1. The opening, not the drawing dimension
Wardrobe carcasses are built to a setting-out dimension taken off the architectural drawing; they are installed against a finished wall that has moved since that drawing was issued. Before approval, confirm who is responsible for the site re-measure and at what stage it happens.
- Has the screed, plasterboard lining and finished floor level been confirmed as built, rather than as drawn?
- Which trade sets out the opening, and which tolerance band applies to plumb, level and square?
- Is there a documented process for reconciling the re-measure with the shop drawing before the order is released?
Our built-in joinery is made to measure for each project, so this step happens on our side too — but it only works when the site information reaches us before production release, not after.
2. What "glass" actually means on the schedule
Two projects can both specify glass paneled doors and end up with completely different assemblies. The approval pack should state the glazing type, the panel construction and the framing system in the same language your specifier will inspect against.
- Toughened or laminated glazing, and who specifies that based on the fitting's use and location?
- Clear, bronze, smoked, frosted or ribbed glass — each behaves differently under artificial light and against a coloured carcass interior.
- Whether the glass sits in an aluminium frame, a timber-framed panel, or a combination of glass with a solid or lacquered panel.
This is why we publish the collections separately rather than as one generic "glass wardrobe" line. A glass paneled wardrobe from our Classic Paneled Wardrobes range is a different build from an aluminium frame glass wardrobe, and both differ again from a glass sliding door wardrobe where the track, door overlap and clearance requirements change the whole setout. Approving the wrong reference is one of the most expensive late corrections in a joinery package.
3. Door operation and clearances under real ceiling height
Glass is heavy, and hardware selection follows from door weight, door height and how often the doors will be used. Confirm the operating method before you confirm the finish.
- Hinged, sliding or folding — and is there clearance for the door swing or the pocket in front of the unit?
- Ceiling height and whether the wardrobe runs floor to ceiling, which changes both panel size and hardware loading.
- Hinge, runner and handle specification: make, load rating, and whether soft close is included as standard or priced as an option.
- Spare hardware policy — what ships with the unit, and what has to be ordered separately for maintenance stock.
For guest-facing projects, we recommend the operations team physically works the sample door before sign-off. A runner that feels acceptable in a showroom can read as stiff or noisy in a quiet bedroom at night.
4. Interior layout agreed with the end user, not the specifier alone
The exterior elevation is what gets approved; the interior layout is what gets used every day. Hanging heights, drawer stacks, shelf depths and lighting all have to be locked before panels are cut.
- Hanging zones: short hang, long hang, or both — and at which heights?
- Drawers, pull-out trays, shelving, jewellery trays, shoe storage, ironing or laundry integration.
- Internal lighting: sensor type, cable route, transformer location and how the fitting is accessed for service.
- Carcass interior finish — a light interior reads brighter through glass doors but shows dust and fingerprints more readily than a dark one.
Layout is tailored per project on our side, so send the storage schedule with the enquiry. A wardrobe specified for a serviced apartment needs a different internal mix from a private villa dressing room, even at identical dimensions.
5. Finish samples in physical form
Glass and high-sheen surfaces are the two places where a screen proof is least reliable. Reflection, sheen level and colour cast only read correctly on a sample at project scale.
- A physical glass swatch viewed against the actual carcass colour and the room's lighting design.
- Frame finish — anodised, powder-coated or painted — with the sample assessed under both daylight and artificial light.
- Edge treatment and visible fixings on the show faces, agreed in writing.
- A signed physical sample retained as the inspection reference for delivery.
We supply material and finish options as samples for this reason. What you sign is what we manufacture against, and it protects both sides at handover.
6. Packaging, sequence and site readiness
Built-in joinery fails on site far more often than in the factory, and most of those failures are logistics problems that were visible months earlier.
- Room-by-room labelling and a packing list matched to the room schedule, so crews are not sorting panels in a corridor.
- Delivery sequence aligned with the site programme — wardrobes arriving before painting or flooring are a damage risk.
- Storage conditions on site: glass panels need dry, upright, restricted-access storage.
- Who installs, and whether the installation crew is briefed on the fixings and pack arrangement before arrival.
Our scope covers freight and door-to-door delivery through to installation and after-sales support, which means the packing list and room schedule matter as much to us as they do to your site team. The more precise the room-by-room information at order stage, the fewer surprises at handover.
Before you release the order, confirm in writing:
- Site re-measure completed and reconciled with the shop drawing
- Exact product reference, glazing type and framing system named on the approval
- Door operation, hardware make and load rating specified
- Interior storage schedule signed by the end user or operator
- Physical finish samples signed and retained
- Room-by-room labelling, delivery sequence and installer briefed
Specifications, hardware options and lead times are confirmed per project. Figures quoted on product pages are indicative; the approved shop drawing and signed sample set govern production.
If you have a joinery package in tender, send us the room schedule, the elevations and your glass reference. We will return made-to-measure construction with material and finish options, and flag any clearance or hardware conflicts before your client signs off — not after.
Contact SANTERSON to start a wardrobe or wider joinery enquiry.