A door schedule looks small on a villa or hotel bill of quantities until it lands in the middle of the programme. Joinery lines, wall finishes, floor thresholds and hardware all touch it. Santerson Wooden Sliding Doors sit inside that same coordination problem, and they are easier to place when the whole fit-out is bought as one coordinated package rather than item by item.
Why doors are usually bought last, and why that costs money
On most villa and hospitality projects the door schedule is confirmed late. Design intent moves, openings get resized on site, and a specialist door supplier is brought in after cabinetry and wall panelling are already fixed. The result is usually visible at handover: an off-white frame against a warmer veneer panel, a track that cannot be recessed because the ceiling build-up was set elsewhere, or a sliding leaf that clashes with a skirting detail already installed.
Buying doors as part of a wider package removes most of that. When the same supplier is producing integrated door and panelling, cabinetry and finishes, the leaf, the reveal and the surrounding panel are cut from one set of approved drawings and one finish reference. That matters most on flush and near-flush details, where a mismatch reads as poor workmanship even when every component is within tolerance.
What the product actually offers
Santerson Wooden Sliding Doors are made-to-measure residential sliding doors. Dimensions, material and finish are specified per project, and the layout is tailored to the opening rather than picked from a fixed catalogue size. For procurement teams that means the schedule can follow the architecture instead of the other way round: full-height leaves to a slab soffit, bi-parting leaves on a wardrobe wall, or a single panel closing off a study alcove.
The same configurable approach runs across the wider door range, which is useful when one package covers several door types in a building:
- Flush sliding doors where the leaf sits level with the finished wall face.
- Wood veneer pocket doors for openings where the leaf must disappear into the cavity.
- Sliding-door wardrobe fronts and open-plan partitions, specified to the same finish family as the cabinetry around them.
Because the specification is per project, material and finish selections are confirmed with drawings at order stage. The product page does not publish a fixed timber species or a standard leaf size, so treat both as items to close out in your own schedule rather than assuming a default.
How it fits alongside the rest of the fit-out
A coordinated package usually groups three things that share materials and tolerances: loose furniture, built-in joinery, and finishes. Doors sit in the second group but are finished to match the third.
| Package element | Typical scope | Coordination point with sliding doors |
|---|---|---|
| Built-in joinery | Kitchens, wardrobes, media walls, vanities | Shared veneer or lacquer reference; matching edge and handle details |
| Wall and ceiling finishes | Panelling systems, decorative panels, ceilings | Reveal size, track housing, flush alignment with panel joints |
| Flooring | Engineered wood flooring, thresholds | Bottom guide position, threshold upstand, carpet transition |
| Loose furniture and lighting | Sofas, tables, lamps, sconces | Swing and slide clearance, switch and socket positions on the wall the leaf travels across |
On a kitchen or utility wall, for example, a sliding leaf in front of tall storage needs the track setout agreed before the cabinetry carcass is fixed. Where the same supplier builds custom built-in kitchen cabinets and the doors, that sequence is settled in one drawing review rather than across three trade packages.
A procurement sequence that holds up on site
The workflow Santerson describes for project work runs from consultation and design through production, logistics, installation and after-sales support. Applied to a door schedule inside a larger package, that looks like this:
- Issue one opening schedule. Every opening, with clear width, finished floor level, wall build-up and whether the leaf travels on the face or into a cavity.
- Lock the finish reference early. Veneer, lacquer or paint is approved against the same sample used for panelling and joinery, before production starts.
- Fix track and guide details with the ceiling and floor packages. Recessed tracks need a pocket in the slab or ceiling build-up; face-mounted hardware needs nothing structural but changes the reveal.
- Confirm hardware and glass separately if used. Handles, locks and any glazed infill are specified per project, not carried over from another job.
- Sequence delivery with wet trades finished. Sliding leaves and tracks are last-stage items; early delivery puts them in the path of paint and plaster traffic.
What to close out in writing before production
Exact opening dimensions taken on site after finishes; the approved finish sample and reference; track type and load path; hardware set; and who fixes the frame on site. These are the items that most often move cost and lead time.
Single-source supply for villa and hospitality packages
Santerson operates as a China-based manufacturer and one-stop furniture and building materials supplier, with project work across villas, hospitality and offices. Published project references include villa and apartment work in Willoughby, Perth, North Turramurra, Melbourne and Sydney, alongside hotel and office projects in China and the Middle East. Offices are listed in China, Vietnam, Singapore and South Africa.
For buyers, the practical benefit of one supplier across doors, joinery, flooring, lighting and finishes is a single set of shop drawings, one production queue and one packing and shipping plan rather than six separate consignments arriving on different dates. Santerson's stated service scope covers custom and OEM work, freight with customs documentation and door-to-door delivery, installation support and after-sales service. Import terms, duties, transit time, warranty terms and local installer arrangements should be confirmed for each project, because the published site copy is not a guarantee of a service level in any particular country.
Send us your opening schedule. Share dimensions, wall build-up and the finish reference you are working to, and we will price the sliding door line against the rest of the joinery and finishes package so it is produced, packed and delivered as one consignment.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Product specification, material and finish options for Santerson Wooden Sliding Doors are confirmed per project. Confirm dimensions and selected specifications before order.