A matte acrylic kitchen looks calm and expensive on a rendering, then arrives as forty separate panels in three shades of off-white that do not match the wardrobes down the hall. The finish is rarely the problem. Quantity take-off and cross-product coordination are. This guide walks through both for matte acrylic cabinets, in the order a buyer actually has to work: count first, coordinate second.
Why matte acrylic rewards careful counting more than most finishes
Santerson's matte acrylic line sits inside the Acrylic Kitchen Cabinet collection and is built to order: made-to-measure sizing, selectable material and finish, and a layout drawn around each specific space. Nothing is stocked off-shelf, so every panel you list has to be produced for your job.
Two consequences follow directly from that:
- Substitution is limited once production starts. A 600 mm base unit can usually be re-cut smaller; a missing tall housing cannot be conjured without restarting a panel order.
- Batch consistency matters more than with wood grain. Wood-veneer and wood-grain panels hide variation in the natural figure of the material. A solid matte surface does not. Panels specified for one wall but ordered against another drawing will read as two different colours under the same lights.
The practical rule: lock your elevation drawings before you count, and count from those drawings rather than from a room list or a floor plan.
Step 1 — Build the quantity schedule from elevations, not plans
Work each wall as its own elevation and give every unit three identifiers: room code, wall code and unit code. That is what lets a site team find "BR2-W3-U07" on a packing list instead of guessing which tall cabinet they are standing in front of.
Count units by family, not as one lump
Split the schedule into base units, wall (upper) units, tall housings, and specialty items such as island or peninsula carcases. Matte acrylic doors are specified per door leaf, while the carcase behind them is a separate line with its own material. Counting "12 cabinets" tells the factory nothing; counting 8 base carcases, 5 wall carcases, 3 tall housings and 31 door leaves gives it everything.
Then derive doors, drawers and hardware
For each unit, record the door count, drawer count and opening type. Handleless layouts change the arithmetic again: a run of handleless minimalist kitchen cabinets needs profile or push-open hardware on every leaf rather than a handle per door, and the hardware quantity should be pulled from the same sheet as the panels.
Santerson's custom built-in kitchen cabinets programme can supply matching furniture hardware alongside the cabinetry — cabinet hinges, drawer slide rails, support legs and connecting brackets. That is convenient, but it only works if you specify these items in the schedule yourself. Hardware left off a purchase order is hardware that arrives as an afterthought from a local supplier, in a different finish, at a different date.
Add spares deliberately
On multi-unit jobs, add spare door leaves and drawer fronts against the schedule rather than leaving them to chance. A damaged panel during transit or installation otherwise becomes a re-production order with a new batch number — which is precisely how a matte surface ends up slightly off-tone. For single villas, spares are optional; for apartment blocks and hotel floors they are usually cheaper than the disruption.
Step 2 — Coordinate matte acrylic with the rest of the fit-out
This is where most kitchen budgets leak. The cabinetry is one line in a package that also contains appliances, worktops, tall housings, laundry joinery and, in villas and hotels, wardrobes in matching finishes.
Appliances before panels
Built-in ovens, cooktops, dishwashers and fridges decide the internal dimensions of the housings that hold them. Fix appliance models — or at minimum their nominal cut-out sizes, ventilation requirements and electrical points — before you finalise tall housing dimensions. Santerson's integrated appliance tall cabinets are configurable for exactly this purpose, but the page itself asks that appliance dimensions, ventilation and electrical requirements be confirmed per project. Do that confirmation in writing, against the actual appliance data sheet.
Worktops and splashbacks
Worktop thickness changes door heights and drawer clearances, and a stone splashback has to be templated or dimensioned after the base run is set out. Where the design calls for stone or marble surfaces, stone and marble surfaces are made to measure as well, so order them from the same verified dimensions you used for the cabinetry — not from a second set of numbers taken off a rendering.
Lighting inside the joinery
Glass display cabinets and open shelving need lighting specified at panel stage, because cable routes and transformer positions have to be routed into carcases. Integrated cabinet lighting should be listed on the same schedule as the units it lights, with electrical specifications confirmed for each cabinet design.
Extend the finish beyond the kitchen
If the matte acrylic tone is meant to continue into bedrooms and laundry areas, order those items in the same batch. The matte acrylic wardrobes sit in a parallel Acrylic Wardrobe collection with the same made-to-measure configuration, and laundry joinery such as washer/dryer cabinets is configured the same way. One purchase order, one production window, one batch — that is how a whole villa reads as a single design instead of three.
A quantity schedule that a factory can actually quote from
Below is the column set to use. Every column exists because leaving it out has caused a re-order at least once.
| Column | What goes in it |
|---|---|
| Item code | Room–wall–unit code, e.g. KIT-W2-U04 |
| Unit type | Base / wall / tall housing / island carcase / specialty |
| Width × height × depth | Finished external dimensions, in one unit of measure across the whole schedule |
| Door leaves and drawer fronts | Count per unit, plus opening direction where it matters |
| Finish code | Matte acrylic colour as confirmed on a physical sample, not a screen swatch |
| Internal configuration | Shelves, drawer stacks, pull-outs, appliance cut-outs |
| Hardware | Hinges, slide rails, legs, brackets, handleless profile or push-open sets |
| Appliance reference | Model or nominal cut-out size for every housing that receives one |
| Spares | Extra door fronts and drawer fronts, stated openly as spares |
| Delivery sequence | Which zone ships first when installation is staged across floors or buildings |
Common quantity and coordination mistakes
- Counting from a floor plan. Plans show runs, not carcases. Panels, plinths, scribes and end panels disappear from the count.
- Specifying colour from a screen. Matte acrylic reads differently under warm and cool light. Approve a physical sample against the actual lighting design before the schedule is signed.
- Mixing finish families across one sightline. Matte acrylic next to high gloss acrylic cabinets in the same tone is a deliberate design decision, not a substitute. Confirm both families exist in that colour before you commit.
- Ordering tall housings before appliances are fixed. The single most common cause of dimension rework on kitchen packages.
- Splitting the villa across three suppliers. Cabinetry, wardrobes and laundry joinery from different sources means three batch tolerances and three delivery dates to defend.
Sequence the order, then protect it at handover
The order that works in practice: elevations signed → appliance cut-outs confirmed → physical finish sample approved → schedule issued for quotation → production drawings returned and checked against the schedule → production → packing list matched item-by-item to your item codes on site.
Santerson operates as a furniture and building materials manufacturer supplying cabinetry, joinery, bathrooms, lighting and other fit-out products through one procurement route, with one-stop supply covering design consultation, material selection, manufacturing, project coordination, logistics and installation support. For a matte acrylic kitchen that has to sit alongside wardrobes, tall housings and laundry joinery in the same tone, that single route is where the coordination problem gets solved — provided your quantity schedule arrives complete.
Send us your elevations and unit schedule
Share drawings, appliance list and finish preference, and we will quote the matte acrylic cabinetry together with matching wardrobes, tall housings and laundry joinery in one production batch. Enquiries through our contact page.