A swim spa is one of the few outdoor amenities that works as hard for a hotel or villa as it does for the guest who uses it. It gives a rooftop or terrace something to sell, adds a wellness reason to book, and it does all of that in a fraction of the footprint of a lap pool. If you are specifying one for a hospitality or residential project, the Outdoor Swim Spa WS-115F III is a useful reference point: it sits in the middle of our configurable swim and hydrotherapy range, and most of the decisions you make around it apply to every other model on that page.

This guide walks through the choices that matter at specification stage — footprint, how the unit will actually be used, what is included in the quoted configuration, and what has to be confirmed with your engineer before an order is placed.

Start with the space, not the model number

Every swim spa decision begins with a measurement. The WS-115F III is listed at 5000 x 2200 x 1250 mm, which means a five-metre run of terrace, deck, courtyard or plant room, just over two metres of width, and enough structural capacity to carry the shell when it is full. Compare that with the shorter WS-115A III at 3880 x 2200 x 1250 mm: same width and depth, roughly a metre less length. On a tight rooftop or an inner-courtyard villa, that metre is often the difference between a workable layout and no unit at all.

Where the project has room to spend — a resort pool deck, a villa with a long garden axis — longer shells in the same range run from around 5.5 metres up to eight or more, and they let you separate a genuine swimming channel from a jetted relaxation end. The practical rule is to measure the clear opening, the access route from the delivery vehicle, and the load path first, then shortlist the models that fit. A model chosen before the site survey usually gets rejected after it.

Decide what the unit is for

Hotels and villas buy swim spas for different jobs, and the configuration should follow the job.

  • Guest wellness and lap training. A hotel gym, spa deck or villa that wants a genuine swim option needs the swim training system. The WS-115F III is listed with one set of it, plus 24 jets, four LED lights and ozone treatment, so it covers exercise and hydrotherapy in one shell.
  • Hydrotherapy and lounge. If the brief is massage seating, evening ambience and a photogenic terrace rather than lengths, an equivalent shell without the swim unit — listed in our range as the "-U" variants — usually suits better and is cheaper to run.
  • Show home or display installation. Developers, display villas and sales galleries typically want the visual impact with a simple service envelope. Some shells in the range are listed with an automatic cover option, which is what these buyers usually ask about first.

Write the intended use into the enquiry. Two projects with identical dimensions often end up on different models once the operator explains whether guests will swim in them at six in the morning or soak in them at nine at night.

What the catalog specification covers — and what it does not

The published figures for this model are a starting point, not a finished specification. This is what the catalog lists:

ItemCatalog value for WS-115F III
Overall dimensions5000 x 2200 x 1250 mm
Control system1 set
Swim training system1 set
Water pump / filter pump1 pc each
Jets24 pcs total
LED lights4 pcs
Total power as listed8.05 kW

That 8.05 kW is the listed total for the base configuration. Heating, heat pump, UV sterilisation, sand filtration, additional insulation and steps are catalog options rather than standard inclusions, and adding them changes both the equipment list and the electrical load. Treat the number on the product page as the base case, and ask for a written configuration sheet before anything enters a drawing set.

Before an order is placed, confirm three things with your mechanical and electrical engineer: the supply and circuit capacity at the intended location, the insulation and heating package for the local climate, and the drainage, access and maintenance clearance around the shell. These are project-specific and they vary by country.

How it fits into a wider project order

The reason buyers bring swim spas to us rather than to a reseller is coordination. A spa on a villa terrace arrives in the same conversation as the outdoor furniture for villas and resorts arranged around it — loungers, dining sets, pergolas and cabana daybeds — and often alongside interior fixtures such as bathroom ceramics, wall panelling, ceiling systems and flooring. Ordering the outdoor and interior envelope through one turnkey project solution team means one set of drawings, one production schedule and one shipment plan, instead of six suppliers arguing over who was supposed to prepare the deck substrate.

Our interior design service covers space planning and layout, 3D renderings and whole-space indoor and outdoor furnishing schemes, so a swim spa can be positioned while the terrace materiality is still being decided. Custom and OEM work covers bespoke finishes on cabinets and surrounds where a standard shell needs to disappear into a designed landscape.

A checklist before you commit

  • Clear internal dimensions of the intended location, plus the delivery route from kerb to position.
  • Structural sign-off for a filled shell, including maintenance and dynamic loads.
  • Confirmed equipment list: jets, swim system, lighting, ozone, and exactly which options are quoted.
  • Electrical supply, protection device and control location agreed with the site engineer.
  • Heating, insulation and cover strategy for the local climate and the intended running hours.
  • Access panels, filter service clearance and a written maintenance schedule for the operations team.
  • Freight mode, packaging, import paperwork and installation support agreed in writing.

Getting a configuration quoted

Send us the plan drawing or a set of site photographs together with the intended use, and we will return a configuration sheet for the WS-115F III or the closest shell in the range, with equipment and options priced line by line. Browse the full swimming pools and swim spas catalogue first if you want to see how the shells scale across lengths.

Planning a hotel, resort or villa project with an outdoor water feature? Send your drawings to SANTERSON and we will specify the swim spa, the surrounding outdoor furniture and the interior fixtures as one coordinated package, from production through door-to-door delivery and installation support.