A request for quote on drawer-focused modular wardrobes is where a wardrobe project usually starts to go wrong or go right. Because these units are made to measure, with layout, finish and dimensions specified per space, a vague enquiry produces a vague price and a re-cut set of drawings later in the job. What follows is the information we need from a buyer, architect or contractor to quote drawer-focused modular wardrobes accurately the first time.

Why Wardrobe RFQs Go Wrong

Modular wardrobes are not catalogue items that ship in standard sizes. Our Drawer Focused Modular Wardrobes sit within the Modular Wardrobes collection and are produced with made-to-measure sizing, selectable materials and finishes, and a layout tailored to each project. The same is true for the Combination Modular Wardrobes and the Hanging Modular Wardrobes in that collection.

That flexibility is the reason an RFQ needs detail. Drawer count, drawer depth, carcass height and door type all change panel cutting, hardware sets and packing. An enquiry that only says "wardrobe, 2.4 m wide" leaves us to guess at everything that drives cost.

The Drawings and Dimensions Section

Send what you have, even if it is rough. The more of the following you attach, the closer the first number will be to the final one.

  • Room or elevation drawings with overall width, height and depth for each wardrobe run, in millimetres.
  • Floor-to-ceiling condition: whether the unit runs to the true ceiling, and whether there is a bulkhead, skirting or cornice to scribe around.
  • Outlets and obstructions — switches, air grilles, downlights, radiators, door swings — marked on the drawing.
  • Wall condition notes. New build framing behaves differently from an older renovated villa where surfaces are out of plumb; we need to know which before setting carcass tolerances.
  • Whether dimensions are finished-floor levels or structural slabs, and whether flooring is already laid.

If no drawings exist yet, tell us. Our interior design service covers space layout planning and 3D visual renderings, so we can work from photographs and site measurements instead.

Specifying the Drawer Layout Itself

This is the part most enquiries skip. A drawer-focused configuration is defined by more than a number of drawers.

Item to state in the RFQWhy it changes the quote
Number of drawers per bay, and which bays they sit inDetermines carcass division and whether hanging space remains in the same run
Drawer heights: shallow sock and accessory drawers versus deep bedding drawersPanel yield and runner selection differ between depths
Open or closed drawer fronts, and handle or handleless edge pullFront profile, machining and hardware all change
Internal drawer finish: melamine, lacquer, acrylic or veneer interiorInterior material is a cost line, not an assumption
Runners: soft-close side mount or undermount, and required load ratingHardware brand and rating are priced separately
Add-ons: dividers, trays, felt-lined jewellery inserts, pull-out hampersEach accessory is quoted as a defined item
Integrated lighting in drawers or open niches, and where the transformer sitsAffects machining, wiring route and electrical coordination on site

Materials, Finishes and Door Type

Name the finish you want and give us a reference. In our built-in furniture range, wardrobe doors and carcasses are available in melamine, matte or high-gloss lacquer, acrylic, wood veneer, solid timber and glass with an aluminium frame. A paint code such as RAL, a laminate reference, or a sample you have already approved on site removes most of the guesswork.

State the door type alongside the finish, because it drives clearance and hardware: hinged, sliding, folding, pocket or open. Sliding doors need track depth and a level running surface; hinged doors need swing clearance from the bed or the opposite wall.

For multi-unit jobs, list finishes by unit rather than applying one finish to the whole order. In villa and apartment packages it is common for master-bedroom units to differ from secondary-bedroom units.

Quantity, Units of Measure and Programme

Be explicit about scope and timing:

  • Number of wardrobe sets per unit type, and the number of unit types in the project.
  • Whether you are quoting one show suite or apartment, a full building, or several phases.
  • Required delivery date on site, and any phased release schedule.
  • Related built-in items in the same order — kitchen cabinetry, vanities, tall storage units, sideboards — since shared finishes and shared shipping reduce coordination work.

Commercials, Packaging and Delivery Terms

Tell us how you want to buy as well as what you want to buy:

  • Incoterm and destination — port or site address, and who handles import clearance.
  • Packaging expectation: flat-packed panels with labelled cartons for on-site assembly, or part-assembled carcasses where site labour is limited.
  • Marking convention, so each carton matches the room or apartment number on your own drawings.
  • Currency, payment terms, and whether you want a separate line for spare hardware.

We arrange freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery. Confirm the Incoterm, duties and transit time for your specific destination in writing before an order is placed; published service descriptions are not a substitute for a project-specific quotation.

How We Handle a Complete Enquiry

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008. Wardrobes are usually part of a wider fit-out, so an enquiry can also cover built-in furniture, interior fixtures and the finishes around them. Our cooperation steps are straightforward: a project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up, with installation support and after-sales service available on request.

If you want an indicative price quickly, send dimensions, drawer layout and finish. If you want a firm production price, add the site condition notes, door type, hardware preference and delivery terms. We will return a quotation with drawings for your sign-off before anything is cut.

Send your drawings and specification through our contact page, and include the room list or unit schedule if the project has more than one wardrobe type.