A swim spa is one of the few pool-sized amenities that can be added to a hotel or villa site without rebuilding the whole landscape. The Outdoor Swim Spa WS-S06M is a 5900 × 2200 × 1610 mm unit from our configurable outdoor swim and hydrotherapy range, which is why specifiers keep asking us where it actually fits. The short answer: on any podium, terrace, courtyard or garden plot that can carry the shell, hold the plant room allowance and give maintenance staff a working access route. This article walks through the site conditions, the project types we supply it into, and the decisions to settle before an order is placed.

Where the unit fits on site: four placement patterns

In our project work the same shell tends to appear in four different settings. Each one changes what has to be coordinated, not the spa itself.

1. Ground-level garden or courtyard (private villas)

On a villa plot the unit normally sits on a prepared slab beside the house, close enough that guests walk to it in a bathrobe rather than across the property. The decisions here are drainage around the surround, an access gate wide enough for the shell, and a run for power from the house. Because the footprint is fixed at 5900 × 2200 mm, landscape layout usually starts from the spa and works outward, not the other way round.

2. Roof deck or podium (city hotels and serviced apartments)

On a rooftop or podium slab the spa becomes a wellness amenity shared by guest rooms above it. Structural loading, waterproofing to the deck below, and how water is drained and replaced all have to be signed off by the local engineer before we ship. We supply the unit and its specification; the structural and waterproofing design stays with the project's local consultants, and we coordinate against their drawings.

3. Semi-enclosed wellness zone (boutique hotels, gyms, spa villas)

Where a hotel wants year-round use without an indoor pool hall, the unit goes under a louvered aluminium pergola, inside a glazed pavilion, or against a wellness court with changing rooms nearby. The spa becomes part of the interior fit-out rather than landscaping, so its finishes need to be read alongside wall panelling, lighting and flooring. Our range covers those adjacent items, which is why one purchase order can cover the spa shell, the surround and the seating around it.

4. Clustered units for resort villas

For villa resorts and serviced-villa developments we regularly quote more than one unit, one per private villa, in a single shipment. The same shell repeats across units, so spare parts, filter pumps and control systems stay identical across the property — a real advantage for the facilities team once the resort is open.

What the WS-S06M specification means for a project

Catalogue specification, Outdoor Swim Spa WS-S06M

  • Overall dimensions: 5900 × 2200 × 1610 mm
  • Jet total: 48 pcs, with 4 water columns shown as a feature of this configuration
  • Water pump: 2 pcs; filter pump: 1 pc
  • Control system: 1 set
  • LED lights: 17, plus 17 small LED lights
  • Ozone shown as a listed feature
  • Total power: 6.95 kW

Two numbers drive most of the site work. Total power of 6.95 kW sets the electrical supply and protection the project has to provide, and the 1610 mm depth sets coping height, steps and safety arrangements for the users you are designing for — a family villa and a hotel wellness zone do not have the same requirements there.

The jet count and water columns place this configuration on the hydrotherapy and relaxation side rather than as a lap-training product. The captured specification for this model does not list a swim training system, so if a client brief asks for counter-current swimming, we confirm the configuration against that brief before quoting and, where needed, point to another model in the range.

Catalogue-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the configuration is confirmed with us before ordering rather than assumed from a brochure page.

Site conditions to confirm before you order

  • Slab and loading. Confirm the filled weight load with our team and hand it to the structural engineer who designs the slab, podium or deck.
  • Electrical supply. Size the supply, protection and earthing to the confirmed configuration's total power, using your local wiring rules and a local licensed electrician.
  • Delivery route. Measure the gate, driveway or lift that the shell has to pass through on the way to its final position, and confirm crane or rigging needs early.
  • Plant and access. Leave working space around pumps, filtration and the control system so routine maintenance does not require removing the surround.
  • Drainage and water supply. Confirm fill, drain and overflow routes with your services consultant, especially on decks and podiums.
  • Surround finishes. Decide whether coping, decking, steps and seating are in our scope or the main contractor's, and write it into the order.

Buying it as part of a wider package instead of as a single item

A spa ordered alone arrives as one crate and one invoice, and everything around it — paving, shading, loungers, lighting, changing-room joinery — is then bought from other suppliers on other schedules. On hotel and villa projects that split usually shows up later as interface gaps: an electrical point in the wrong place, a deck level that does not meet the coping, seating that arrives after handover.

As a hospitality furniture and building materials supplier, we handle swim spas together with the surrounding scope: outdoor furniture for the poolside and terrace, lighting, shading structures such as pergolas and gazebos, wall panelling and ceilings, cabinetry and bathroom fixtures. Our turnkey project workflow runs from consultation and design planning through production, logistics, installation and after-sales, so one specification package covers items that would otherwise sit with five different vendors.

For buyers comparing options in the same category, the wider swimming pool and swim spa range covers different lengths and configurations, including longer formats with a separate relaxation zone. Send us the site drawing and the intended user profile and we will shortlist the models that suit it.

Questions procurement teams ask us most often

Can this model be used in a commercial hotel, not only a private villa?

Yes. The unit appears in both settings in our project work. For commercial use the differences are on the project side: higher bather load affects filtration and treatment planning, and access, steps and supervision arrangements follow the requirements your local authority applies to a public or guest-use facility.

Does it need a building permit?

Rules differ by country, state and even by council, and they depend on depth, location and whether the use is private or commercial. We supply the product documentation you need for an application; we do not tell you what your local authority requires. Confirm this with your project's local consultant before ordering.

What is included in the price?

The base configuration plus whatever options are written into the order — heat pump, UV sterilisation, sand filtration, insulation, steps and so on. Freight terms and delivery address also change the quotation, so send drawings and site details rather than asking for a model price in isolation.

Can finishes or dimensions be changed?

We run custom and OEM work across our product range, including bespoke finishes and materials. For a swim spa, changes to the shell structure affect engineering, so we confirm what is adjustable and what is fixed before committing anything to production.

Send us your drawings

If you are specifying a swim spa for a hotel, resort or villa project, share the site plan, the intended use (private or commercial) and your target handover date. We will confirm the configuration, the options that suit the site and what has to come from your local consultants — then quote the full package in one document.