A wood grain melamine wardrobe looks simple on a finishes schedule: one line, one reference, one approval. The problems start later, when the carcass arrives with the wrong substrate, the doors do not align with the reveal detail, or the grain direction no longer matches the room elevation. Writing those details into the procurement brief before the order is placed is far cheaper than correcting them on site.

What a Wood Grain Melamine Wardrobe Actually Consists Of

In supplier terms, "melamine" usually describes the decorative paper-faced laminate pressed onto a board substrate — most often particleboard or MDF. The wear layer carries the printed wood pattern and an embossed texture, so the visual character of the panel is decided by the print, the texture plate and the edge treatment rather than by solid timber. That distinction matters when you write the brief, because two panels with the same colour name can look completely different once one is glossy and the other has a deep wood-grain emboss.

A wardrobe specification therefore has four separate layers to describe: the substrate and its thickness, the laminate decor and finish, the edge banding method and colour match, and the hardware set. Treating them as one line item is the most common source of substitution disputes on residential and multi-unit projects.

Reading the Brief Back to Front: What the Factory Needs From You

Made-to-measure joinery is built from the information in your document, not from the intent behind it. Before a quotation can be compared line by line between suppliers, the brief should state the following for every wardrobe type on the schedule.

Brief sectionWhat to recordWhy it changes the price or the result
Scope and locationsFully fitted, part-height or freestanding; room by room; quantity of each typeDetermines panel yield, number of unique sizes and how much on-site trimming is expected
Dimensions and datumFinished internal dimensions, floor-to-ceiling heights, which wall is the reference line, tolerance for out-of-plumb wallsOld and new buildings rarely have square corners; without a stated datum the fitter improvises
SubstrateParticleboard or MDF, board thickness per component, moisture-resistant board where requiredAffects screw holding, edge appearance, cost and behaviour in humid rooms
Laminate decor and finishSupplier decor code, sheen level, texture direction, grain orientation per doorWood prints have a repeat and a direction; unspecified grain runs cause visible mismatch across a run of doors
Edge treatmentMatching ABS or PVC edge banding, thickness, colour match, exposed versus concealed edgesThin tape on a high-use door chips; unmatched edges read as a substitute at handover
Doors and accessHinged, sliding, bi-fold or open; door size limits; track and hinge brand or gradeSliding sets need clearance and pocket depth that architecture drawings often miss
Internal configurationRails, shelves, drawers, pull-out baskets, lighting, mirror panelsInterior layout drives the number of cut parts and is where late change orders hurt most
Interface detailsSkirting treatment, scribe and filler widths, cornice or shadow gap, architrave revealDecides whether the unit reads as built-in joinery or as furniture placed against a wall
Handover conditionsPackaging, container loading sequence, delivery access, installation window, snag list processCross-docking by room avoids fitters opening forty cartons to find one door panel

Finish Families Worth Naming in the Same Brief

Most projects that specify a wood grain decor also need matching or complementary wardrobes elsewhere in the same building — a lighter oak tone in the guest rooms, a solid colour in the utility area, a textured surface where fingerprints matter. Naming those variants in one document keeps them on the same panel batch and the same production run.

Ask for the same decor code to be used across wardrobes and any matching cabinetry in the same building, so that a bedroom frontage and a hallway linen cupboard do not end up in two slightly different shades of "walnut".

Details That Are Cheap to Fix on Paper and Expensive On Site

Grain direction and pattern repeat

State whether the grain runs vertically or horizontally, and whether doors in a run must match sequentially. A factory that is not told will cut for panel yield, which can place two adjacent doors from different parts of the print side by side.

Scribe and filler widths

Give the fitter an explicit range for filler panels rather than leaving it to be resolved on the day. If the brief fixes a flush, tight reveal but the walls are not straight, somebody has to choose between the drawing and the wall.

Sliding versus hinged clearance

Sliding doors need track depth and overlap; hinged doors need swing clearance from beds, vanities and door openings. Confirm which one the room actually supports before the schedule is priced, because changing access type after production starts usually means re-making the carcass.

Edge banding on visible edges

List which edges are exposed to view and require a matching, slightly thicker edge with a rounded arris. Concealed edges can take a thinner tape. That single line item protects both the budget and the appearance.

Hardware grade and replacement

Name the hinge and slide grade or brand, and ask what the standard replacement part is for each fitting. On a multi-unit handover, spare hinges of an obsolete profile become a maintenance problem years later.

Sample and Approval Stage

Before release to production, request physical samples rather than printed or screen colour references: a laminate chip showing the decor and sheen, an edge-banded corner showing the tape match and arris, and one drawer or door front showing the hardware set. Then record in the brief which sample governs, with its date and reference number, so that the approved item at handover can be traced back to it.

Approval checklist for the file: decor code and sheen; texture direction; edge tape colour and thickness; substrate and thickness per component; hardware schedule; sample reference and approval date; who signed off. Keep all of it in one document, not across three emails.

Working With a Made-to-Measure Supplier

Custom joinery is where a brief earns its keep. SANTERSON manufactures built-in furniture to project-specific dimensions, finishes and layouts, with custom and OEM service covering bespoke material finishes, textures and prototyping from design through production. For a wardrobe package that means the carcass size, door style, laminate decor and internal configuration are all specified rather than chosen from fixed catalogue sizes.

The same coordination covers the rest of the fit-out. Cabinetry, wall panelling, interior doors, flooring and lighting are produced under one roof, which reduces the number of separate submittals you have to reconcile and keeps complementary finishes on a single panel batch. Logistics is handled door to door — freight forwarding, packaging and container loading sequence, customs documentation — with installation support and after-sales service for snags and spare parts.

Confirm current production lead time, minimum order quantity, board options, hardware brands, freight terms and warranty scope in writing for your project. Published figures vary across the site, so treat any capacity or response-time number as unconfirmed until it appears in your quotation.

A Short Submission Template

  • Project, unit type and room list with quantities per wardrobe type.
  • Dimensioned drawings with the reference wall, finished heights and stated tolerance for out-of-plumb walls.
  • Finish schedule: decor code, sheen, texture direction, grain orientation, edge tape specification.
  • Substrate schedule: board type and thickness per component, moisture-resistant board where required.
  • Hardware schedule: hinges, slides, handles, tracks, internal fittings, lighting.
  • Interface details: skirting, scribe range, cornice or shadow gap, architrave reveal.
  • Sample register: approved physical samples with references and dates.
  • Delivery plan: packaging marking by room, container loading sequence, access notes, installation window.
  • Commercial terms: quotation validity, freight basis, spare parts list, snag and warranty process.

Write the brief once at that level of detail and every quotation you receive afterwards becomes comparable. The savings are not only in price — they are in the number of site questions, re-cuts and replacement panels you avoid between order and handover.

Send us your wardrobe schedule, drawings and finish requirements, and we will quote a made-to-measure wood grain melamine wardrobe package against your brief, including matching cabinetry, freight to site and installation support. Contact: SANTERSON contact page.