A swim spa shell arrives on site in one condition and gets installed in another. Everything that decides whether the finished installation looks and performs as intended sits in the finish schedule, and most of it is fixed long before the container ships. This guide walks through the finish details to confirm for Outdoor Swim Spa WS-PC05CH, model by model, with the questions to put to your supplier and the documents that should carry each answer.

What the published specification already settles

The catalogue record for this model gives you a starting point, so write it into your own document rather than relying on a supplier PDF. The listed figures are: cabinet 5000 × 3000 × 900 mm, one control system, one water pump, one filter pump, 30 jets in total, one LED light and a total power figure of 2.45 kW. The features shown against the model are water jets, LED lighting and ozone. No swim training system is listed for this configuration.

Treat those numbers as the baseline of the standard catalogue build, not as a guaranteed delivery specification. Options listed across the range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps, and availability varies by model. The practical consequence is that your purchase order should reproduce the figures you have confirmed, item by item, instead of referring to "the standard WS-PC05CH".

ItemCatalogue figureWhat to confirm on your order
Cabinet dimensions5000 × 3000 × 900 mmFinal external and internal dimensions, plus access width for delivery
Jet total30 pcsJet count, layout on the shell and jet face finish in the chosen colour
Total power2.45 kWWhether the heat pump, if added, is inside or outside this figure
Water pump / filter pump1 pc eachPump make and model as fitted, not as an option category
LED light1 pcFitting position, colour mode and control method
Water treatmentOzone shownWhether UV sterilization is added and how the two interact

Shell and cabinet finishes

The acrylic shell is the surface you see and touch every day. Confirm the colour to a physical sample, not to a screen render or a printed brochure page, because pigment reads very differently under underwater LED light than it does on a swatch card. Ask which surface finish the shell carries and how edge trims, coping and corner radii are detailed where the shell meets the cabinet.

The cabinet wrap is the part that has to survive being outdoors. The catalogue range includes insulation as an option, which affects both the outer profile of the cabinet and what cladding material can be fitted over it. Confirm the substrate behind the cladding, the fixing method, and how inspection access to pumps and the control system is preserved once the panels are on. A cabinet that cannot be opened without removing permanent cladding will cost you every future service visit.

Where the swim spa sits against a deck, wall or paving edge, ask for the transition detail in writing: which material forms the top edge, how it is fixed, and what sealant is specified at the joint. This is the detail most often left out of an order and most often argued about on site.

Hardware, jets and fittings

With 30 jets in this configuration, jet finish and placement are visible decisions. Confirm the face colour of jets, return inlets and suction covers against your shell colour, and ask for a layout drawing that shows where each jet sits relative to the seating and lounging positions. Jet layout is what determines whether the hydrotherapy actually reaches the shoulders and calves, and it cannot be changed after the shell is laid.

Ask which fittings are included as fitted hardware and which are optional extras: steps, handrail, cover and cover lifter, control panel housing. Steps in particular change the footprint and the approach to the water edge, so they belong in the setting-out drawing rather than in a late variation.

Control system, lighting and electrical finish

The control system is a user-facing finish as much as a technical component. Confirm the panel location on the cabinet, whether it is recessed or surface mounted, the language of the display and the operating range. If you intend to control the spa from a wall panel or a building management system, raise that at quotation stage; retrofitting control wiring after installation is disruptive.

The total power figure of 2.45 kW covers the standard configuration as listed. Adding a heat pump changes both the electrical load and the circuit requirements. Confirm the supply voltage and phase your site can provide, the dedicated circuit size, the isolation and protection required, and which party supplies the final connection. Get the as-fitted wiring diagram before the spa is crated.

Water treatment finish: ozone, UV and filtration

Ozone appears in the features shown for this model. Confirm what is supplied as standard and what you are adding: UV sterilization and sand filtration both appear as options across the range. Ask how dosing and sanitisation are handled alongside ozone, where each unit sits inside the cabinet, and what maintenance access each needs. A treatment package that fits on paper but blocks pump access in reality is a common complaint.

Documentation to receive before shipping

  • A specification sheet restating confirmed dimensions, jet count, pumps, LED and power for your unit
  • A shell and cabinet colour schedule referencing physical sample codes
  • A jet and fitting layout drawing with face-finish callouts
  • An electrical schedule: voltage, phase, circuit protection, isolation point
  • Treatment equipment list showing what is standard and what is added
  • A cabinet access and inspection plan for pumps, filters and controls

Comparing against a neighbouring configuration

Model suffixes in this range change the specification meaningfully, so check the record for the exact variant rather than assuming. Outdoor Swim Spa WS-PC05, for instance, is catalogued at 5000 × 3000 × 1100 mm with 18 jets, two LED lights and a total power figure of 2.25 kW, with water columns shown as an additional feature. Same model family, different depth, jet count, lighting and load. If a project specifies one suffix and receives another, the finish schedule will not match what was approved.

How this fits into a wider project package

Swim spas rarely arrive alone. In a villa or resort package they sit alongside paving, outdoor furniture, lighting and bathroom fixtures, and the finish decisions need to be coordinated across all of them at the same time. Our Turnkey Solutions cover design consultation, material selection and product specification, manufacturing, logistics and site coordination through to handover, so the swim spa finish schedule is reviewed together with the deck, coping and outdoor furniture selections rather than in isolation. The Interior Design Services team handles the space planning, renderings and production coordination side of that work.

Figures quoted above are transcribed from the catalogue listing for the standard configuration. Confirm every dimension, component and power figure for your specific order in writing before production begins. Electrical requirements, insulation levels and local installation conditions vary by site and should be verified with your own designer, installer or engineer.

Send us the model suffix, your site's supply voltage and phase, and the finish samples you are working to, and we will return a specification sheet for the exact configuration you intend to install — with jet layout, cabinet access and treatment options shown before anything enters production. Enquiries reach our team at contact page.