Procurement Checklist / Dining Cabinets & Sideboards

A wall-mounted sideboard looks like the simplest item on a villa joinery schedule — until it arrives in three cartons, the fixing detail does not match the substrate, and the finish sample no longer matches the kitchen run. Because these units are made to measure rather than picked from a catalogue, almost everything that determines the outcome is decided on paper, before production starts. This guide sets out what procurement teams should have written down for Santerson wall mounted sideboards at each stage of a residential project.

Why the Paperwork Carries More Weight Than Usual

Santerson is a China-based manufacturer and one-stop supplier of furniture and building materials, working on villa, hospitality and office projects from design and production through to door-to-door delivery, installation support and after-sales service. That scope is an advantage on a project, but it also means the sideboard is only as good as the specification that reaches the factory.

The product page for this line describes configurable wall-mounted sideboards for residential living projects, with finish, layout and dimensions specified to suit each space. The configuration options listed are made-to-measure sizing, material and finish options, and a layout tailored to the project. There is no fixed width, depth or carcass build to fall back on — every number has to come from your documentation. Two practical consequences follow:

  • Anything you leave unstated will be decided by someone else — usually the factory's default practice, or an installer improvising on site.
  • Corrections after production starts are expensive and slow, because the unit is not a stocked item that can simply be swapped.

Dimension and Setting-Out Records

Record the finished opening or wall run the sideboard occupies, not the rough structural dimension. Note floor finish build-up as well: a wall-hung unit set out against a bare slab will sit at the wrong height once stone or engineered timber is laid.

Item to documentWhy it matters for a made-to-measure unit
Overall width and height of the intended run, with toleranceSets the carcass size; on long runs you also need to state whether the unit is one piece or segmented for transport
Depth, including the allowance for doors, drawer fronts and hardwareDetermines clear circulation in a dining or hallway route once the unit is fitted
Finished floor level and finished ceiling level at that wallPrevents height clashes after floor finishes and skirting are installed
Wall construction and substrate behind the fixing lineA wall-hung unit needs a competent substrate; blocking or steel backing has to be built in, not discovered later
Position of sockets, switches, radiators, downlights and skirtingCut-outs and clearances are factory work, not site work
Adjacent returns, doors and reveal depthsAvoids the unit fouling a door swing or sitting proud of an alcove
Worth doing: have the site team sign off a dimension sheet with photographs of the wall in its finished state, and keep that sheet as the production reference. Where a project also includes other joinery from the same collection — buffet cabinets, classic sideboards or a tall dining cabinet — issue one dimension pack covering all of them so the heights, depths and reveals are read from a single source.

Layout, Interior Configuration and Use

State what the unit is for. A sideboard used for tableware storage, a bar station, or a display run with glass and lighting each needs a different interior, and the factory cannot infer it from an elevation alone.

  • Storage mix: number of drawers and their depths, shelf positions, tall internal bays for bottles or linen, closed versus open compartments.
  • Front treatment: hinged, sliding or open; handleless or specified hardware; whether fronts continue the panel language used elsewhere in the property.
  • Display elements: niche shelving, glass panels, illuminated recesses. If lighting is required, record the driver location, switching and access for maintenance.
  • Worktop, if any: whether a stone or other counter top sits on the unit, its edge profile, and the load it must carry — coffee machines and decanters are real weights.

A worked reference helps here. In the site's dark wood minimalist home project, the wall-mounted sideboard is paired with two tiers of floating shelves for bottles and decorative objects, a stone counter carrying a coffee machine and tableware, and recessed soft lighting that picks out the display items. That combination — closed storage below, open display above, a working surface in between — is a configuration you can describe in the same terms on your own schedule.

Material and Finish Documentation

The product line lists material and finish options as configurable, so specify rather than assume. For each visible surface record:

  • The substrate or door construction being specified, and where a wood-veneer, lacquer, laminate or solid-wood option has been chosen.
  • Colour reference — physical sample number, batch notes and sheen level, not a photograph or a screen swatch.
  • Grun and grain direction across doors and drawer fronts, particularly on long horizontal runs where direction mismatch is obvious.
  • Edge treatment and how it meets the adjacent material, especially where the sideboard abuts plasterboard, stone or a floor finish.

Where the sideboard must match joinery produced by another supplier or an earlier phase, obtain a physical approved sample and hold it against the delivered fronts on site. Keep the signed sample; it is the only reliable evidence in a finish dispute.

Fixing Method and Interface Responsibilities

This is the section most often left blank, and the one that causes the most rework on wall-hung cabinetry. Document who supplies and installs what:

Interface itemWho should be named in the record
Concealed fixing rail, brackets or cleatsSupplied by the unit manufacturer or provided on site — state which
Wall blocking, backing steel or plywood substrateMain contractor, with setting-out dimensions issued before first fix
Fixings for masonry, stud or timber frameNamed by type and load rating once the substrate is confirmed
Level and alignment on site, packers and scribe fillsFitting contractor; confirm who signs off before fixing is concealed
Protection after installation in an occupied projectContractor or handover team, with the method stated

Santerson's service navigation includes installation and after-sales support alongside production and delivery. Ask what that support covers on your specific order — supervision, a fitting crew, snag inspection, spare parts — and get the answer in writing with the quotation rather than relying on the general description.

Commercial and Logistics Records

The commercial file should mirror the technical one. For each unit record the drawing number and revision, the quantity, the approved finish reference, the packing configuration and carton marking, and the delivery address with a named receiver who can inspect on arrival.

  • Drawings: keep a revision log so nobody produces from superseded dimensions. Note which revision each unit was built to.
  • Quotation basis: state what is included — carcass, fronts, hardware, worktop, lighting, spare panels — and what is excluded.
  • Packaging and handling: confirm carton count, weight per carton and access route to the room, particularly for upper floors and narrow staircases.
  • Inspection on delivery: check carton labels against the schedule before signing, and photograph any damage at the point of handover.
  • Snag list: record door alignment, gap consistency, drawer runner operation and finish condition at handover, with dates.
A useful test before you release an order: could a site manager who has never seen the drawings install this unit correctly from your documents alone? If not, the gap is in your paperwork, not on the wall.
Confirm the figures with the supplier. The company's own site gives different factory-area and export-share numbers on different pages, so do not carry any of those figures into your project records or purchase documents without written confirmation from SANTERSON. Apply the same rule to lead times, warranty terms, response targets and delivery scope: confirm them for this order rather than inferring them from general service descriptions.

Common Gaps Worth Avoiding

  • Ordering to structural dimensions. Measure against finished surfaces and record floor build-up.
  • Assuming the substrate will take a wall-hung load. Confirm construction and specify backing before first fix.
  • Specifying finishes from images. Approve physical samples, then keep them.
  • Leaving lighting to site. Drivers, cable runs and access need factory-side cut-outs.
  • Treating each unit as its own package. Where a sideboard sits in a wider joinery scheme, order the whole group against one dimension pack so heights and reveals line up.

Confirm the Numbers That Are Not Fixed

Santerson's own site carries inconsistent company figures — the factory area is given as 100,000 m² on one page and differently elsewhere, and the export share is stated as both 92% and 95%. Treat those as unverified until the supplier confirms them in writing. The same discipline applies to your order: lead times, warranty terms, response targets and delivery scope should be confirmed for the specific project rather than inferred from marketing copy.

Before You Release the Order

A made-to-measure wall-mounted sideboard is a documentation task disguised as a piece of furniture. Dimensions taken against finished surfaces, an interior layout tied to how the unit will actually be used, physical finish approvals, a named fixing method with a competent substrate behind it, and a commercial file that matches the technical drawings — recorded together, these turn a custom item into a routine one. Gaps in any of them are paid for later, on site, at a far higher cost than an extra hour with the drawing sheet.

Start With a Complete Specification Pack

Send the dimension sheet, interior layout, finish references and fixing details together, and a made-to-measure wall-mounted sideboard becomes a routine item instead of a project risk. SANTERSON works on villa, hospitality and office projects with custom/OEM production, logistics and door-to-door delivery as part of the same scope.