A floating TV unit looks simple on a drawing: one clean horizontal volume, no legs touching the floor, cables out of sight. In production it is one of the most detail-sensitive pieces of joinery in a living room or guest suite, because almost every decision has to be locked before the panels are cut. If you are specifying these units for a villa, apartment or hospitality fit-out, the checklist below is what we ask project teams to settle before an order goes into manufacturing.

1. Wall structure and fixing method

A wall-hung unit carries its own weight plus televisions, soundbars and shelving load, so the substrate matters more than the cabinet face. Before we quote, we need to know whether the background is masonry, light-gauge steel stud partition, timber framing or an existing finished surface that will be built over. That answer determines the batten frame, anchor type and whether a concealed steel backing is required.

  • Clear height of the wall and where the unit starts and finishes relative to skirting, cornices and adjacent openings.
  • Whether the wall can take point loads, and who supplies the structural backing - the site contractor or the joinery package.
  • How adjustments are handled: on-site packing, shimmed frames, or shop-finished panels set out to a surveyed dimension.

2. Exact dimensions and the tolerance you will accept

Floating units fail most often on measurement, not craftsmanship. We produce floating TV units made to measure, which means the opening width, unit depth, projection from the finished floor level and the height of every drawer bank come from a survey of the completed room - after flooring, plastering and paint are done. Confirm three numbers before production: overall length, depth including any overhanging top, and the setting-out height off the finished floor.

If your drawings show nominal dimensions, state which party signs off the final site measurement. That single line in the order removes most rework claims later.

3. Television size, mounting and viewing height

The screen drives the carcass. Confirm the display size and its VESA pattern, whether a fixed bracket, tilt bracket or full-motion arm is used, and whether the TV sits on a recessed panel or in front of the joinery face. A pull-out arm needs a pocket depth that a standard 350 mm cabinet will not give you. Also agree the finished centre height of the screen for the room's main seating position - this is a comfort decision best made before, not after, installation.

4. Cables, sockets and equipment access

Ask for the electrical layout drawing early. We need to know where the power and data outlets sit, whether they fall behind the carcass or in an adjacent panel, and how many devices will live inside: console, soundbar, router, set-top box. Equipment stored inside a closed cabinet needs ventilation openings and enough internal depth for the deepest device plus its rear connectors. Where sockets must stay reachable, we cut and edge-finish the openings at the factory rather than leaving them to site.

  • Number and position of power, TV antenna and network points.
  • Whether a cable-management tray, brush grommet or rear cut-out is required.
  • How remote-control signal reaches equipment: open shelf, glass-front section or IR-friendly door panel.

5. Storage layout and how the unit will actually be used

Two households can order the same silhouette and need completely different internals. Decide the split between open display niches, closed cabinets, drawers and media storage, and note anything unusual you are storing - a record player, a games console with its own power brick, board games, or a safe. Drawer runners and hinges are specified to the use frequency of the piece, so tell us whether this is a family living room used daily or a guest suite used occasionally.

Where a floating unit feels too small for the storage requirement, we move to a full-height scheme instead - full height media walls and wall-mounted systems let the same material palette run floor to ceiling while hiding equipment and clutter behind concealed doors.

6. Materials, finish and matching the rest of the joinery

Send the finish reference, not just a colour name. Veneer species and cut direction, lacquer sheen level, melamine or acrylic board, metal accents and glass type all change price and lead time, and veneer in particular has to be ordered in one batch with matching grain direction across the whole wall. If the TV unit is part of a wider package - kitchen cabinetry, wardrobes, wall panelling - order it together so the wood tone and hardware are consistent throughout the project.

DecisionWhat to confirm
Board and substrateMoisture-rated core where the wall backs onto a wet area; standard core elsewhere.
Surface finishVeneer, lacquer, melamine or acrylic, plus sheen level and edge treatment.
HardwareRunners, soft-close hinges, push-open or handleless profiles, load rating.
Integrated lightingNiche or shelf lighting, driver location, and how it is switched from site wiring.

7. Delivery route, packaging and installation sequence

A long one-piece carcass that fits the wall may not fit the lift, stairwell or front door. Confirm the access route from the kerb to the room, and tell us the maximum package size that route accepts; we will split the unit into shipped sections and join them on site where needed. For projects overseas, this is also the point to agree who receives the goods and who fixes the unit to the wall.

As a one-stop furniture and building materials supplier, SANTERSON handles this handover as part of the package: door-to-door delivery with freight forwarding and customs documentation, then on-site installation, snag inspection and after-sales support. Our cooperation steps are straightforward - brief and design proposal, quotation with confirmed details, then production, shipment and follow-up.

8. Drawings, samples and sign-off

Before cutting anything, we want three things in writing: approved shop drawings with dimensions and elevations, a confirmed finish sample or reference code, and the agreed installation sequence with other trades on site. Where a project needs it, 3D visual renderings help non-technical stakeholders sign off proportions and finish without guessing.

  • Shop drawings signed by the designer or main contractor.
  • Finish sample approved against the project's material board.
  • Written confirmation of who prepares the wall, who supplies electrical, and who installs.

Ready to price your unit?

Send us the room elevation, the TV size, the socket positions and your preferred finish, and we will come back with a specification and quotation for made-to-measure floating units - or a wall-system alternative if that suits the space better. Browse the floating TV unit collection to see the configurations we build most often, and contact our team to start a project enquiry.