A vanity that arrives with the wrong cut-out position, a basin that sits too high for the mirror, or a worktop edge that clashes with the wall tile — these are not design problems. They are specification problems. On an integrated countertop vanity the basin, the worktop and the cabinet are one assembly, so every dimension has to be agreed before production starts, not adjusted on site.

This guide walks through the eight fields we ask buyers, designers and builders to complete when they specify a Santerson Integrated Countertop Vanity. Each item is something our production team needs in writing before cutting material.

Why an integrated countertop vanity is specified differently

With a separate worktop and basin, the trades can correct small errors during installation. The counter is cut on site, the basin is dropped in, and sealant hides a few millimetres of deviation. An integrated unit removes that flexibility: the basin wells are formed into the countertop material, so the geometry is fixed at the factory. That means the specification you send determines the drainage location, the tap hole positions, the mirror height and the cabinet interior layout all at once.

Our Vanities range — including the integrated countertop vanity, the double vanity and the floating vanity — is made to measure for each project rather than offered in fixed sizes. Made-to-measure only works when the numbers are final, so treat the specification sheet as a contract document.

The eight fields of a complete specification

FieldWhat to stateWhy it matters
Unit type and mountingFloor-standing, wall-hung or recessed; the exact wall build-up if the unit is wall-hung.Determines carrier frame, fixing detail and whether the waste runs in the floor or the wall.
Overall dimensionsWidth, depth and height, plus the finished floor level and finished wall face.An integrated top cannot be trimmed on site; a 20 mm error moves the basin off the waste.
Countertop material and finishStone or engineered surface, edge profile, splashback height, and whether the surface wraps the side returns.Edge profiles and veining are decided at fabrication; samples confirm the tone against your tiles.
Basin arrangementNumber of basins, centre-to-centre spacing, basin offset from each end, and rim detail.Sets the waste pipe positions before the screed is poured.
Tap and overflow detailsDeck-mounted or wall-mounted taps, hole count, spout reach, overflow requirement.Holes are machined into the stone; wall-mounted taps need the rough-in valve set first.
Cabinet interior layoutDrawer stack, doors, open shelving, socket cut-outs for electric toothbrush or shaver points.Interior partitions and cable holes are built into the carcass during production.
Mirror and lighting coordinationMirror size and centre line; vanity lighting type and mounting height.The mirror must clear the splashback, and the light must fall on faces rather than on the worktop.
Quantity, room schedule and deliveryItem code per bathroom, pack list, delivery address and receiving arrangements.Prevents identical-looking units being sent to the wrong rooms on a multi-storey job.

Worktop material: what to decide before you ask for a quotation

The countertop is the most visible part of the assembly and the hardest to replace. Our Santerson Stone & Marble Surfaces page covers configurable stone and engineered surfaces with made-to-measure sizing and finish options. When you specify, state the surface family you want and let us confirm which finishes are currently available for that family — tone and veining vary between blocks, so approve a physical sample rather than a photograph before releasing production.

Then fix four secondary details in writing: the edge profile on the front and return edges, whether a matched splashback is required and to what height, whether the surface wraps around a column or abuts a tiled wall, and how the unit meets an adjacent skirting or bath edge. These are fabrication decisions, and each one changes the cutting file.

Basin integration: integrated, undermount or above-counter

Not every project wants the basin formed into the top. If you prefer a basin fixed beneath the worktop, specify it as an undermount basin and give us the cut-out dimensions and the required rim inset. For a basin sitting on the surface, an above-counter vessel basin changes both the tap reach and the mirror height, because the washbasin rim rises above the worktop level. Where a fully seamless surface is wanted, an integrated basin keeps the counter and bowl in one material with no visible joint.

For a shared family bathroom or an ensuite used by two people, the double basin countertop arrangement sets the minimum width of the run. Give us the centre-to-centre distance between the two wastes and confirm that the cabinet below is designed around it, because a drawer stack cannot cross a waste pipe.

Storage layout: specify contents, not just doors

Write down what each household or guest will keep in the unit — daily glasses, hair tools, cleaning products, towels, medicines. A specification that says "three drawers" tells us nothing; one that says "two shallow drawers above the basin waste for grooming items, one deep drawer below for towels, one open shelf at floor level for a laundry basket" gives us something to build. Note also whether you want internal power points behind the cabinet for charging, and which side.

Coordinating lighting and mirrors

Bathroom lighting is usually left too late. Our vanity lighting range is also made to measure, so its length and finish can be matched to the unit width and the tapware metal. Decide at specification stage whether the light is a mirror-integrated fitting or a separate fixture above the glass, because that determines where the cable is terminated in the wall. A decorative fitting such as the Modern Splash Mirror Wall Lamp is set out for the vanity area and needs its own back box position before the wall is closed.

How we take a specification from drawing to installed unit

Santerson is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008, with custom/OEM manufacturing, logistics and installation support under one roof. For a bathroom package that means the vanity, mirror, lighting, shower set and WC do not have to be coordinated between five different vendors.

  • Brief and drawings. Send plans, elevations and your completed specification sheet. We review dimensions, waste positions and clearances with you.
  • Design proposal and quotation. You receive a layout drawing showing basin centres, tap holes, drawer fronts and lighting positions, priced against the agreed materials.
  • Detail confirmation. Sample approval of surface and finish, then sign-off of the production drawings. Nothing is cut before this step.
  • Production and quality control. The units are fabricated to the signed drawings, with the machining files taken directly from them.
  • Packaging and freight. Crating, container loading, export paperwork and door-to-door delivery are arranged by our logistics team; you confirm the receiving address and access conditions.
  • Installation and after-sales. On-site fitting guidance, inspection with a snag list, spare parts and maintenance support follow handover.
Specification tip: send one consolidated sheet per project covering all bathrooms, with an item code for each unit (for example VTY-01 master ensuite, VTY-02 guest WC). Identical dimensions across rooms do not mean identical units — tapware side, waste side and door swing frequently differ.

A pre-production checklist

  • Finished floor levels and finished wall faces confirmed on the latest drawing revision
  • Waste and water rough-in positions marked, with a photograph of the setting-out
  • Countertop sample approved in writing, including edge profile and splashback height
  • Basin type fixed: integrated, undermount or above-counter, with rim heights stated
  • Tapware selection confirmed as deck-mounted or wall-mounted, with spout reach
  • Mirror size, centre line and lighting cable position agreed
  • Cabinet interior layout signed off, including power points behind the carcass
  • Room schedule, quantities and delivery address verified against the purchase order

If you are sourcing vanities together with other bathroom and interior products — shower systems, WC suites, cabinetry, wall panelling or flooring — sending one combined enquiry lets us check dimensions across trades before anything enters production. That single coordination step is where most on-site rework gets avoided.

Send us your vanity schedule

Share your drawings, room list and the eight specification fields above, and our project team will return a layout drawing and a quotation against your selected materials and finishes.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com  |  Enquiries: santerson.com/contact