Bathroom fit-out / Procurement note

An integrated countertop vanity looks simple on a drawing: one continuous top, basin set into it, cabinet below. In practice that single line item carries most of the coordination risk in a guest bathroom, because countertop, basin, tapware, waste, mirror and lighting all have to agree before the cabinet is cut. The Santerson Integrated Countertop Vanity is a made-to-measure piece in our Vanities collection, so finish, layout and dimensions are set by the buyer rather than picked from a stock list. This note lists what we ask project buyers to confirm before an order is released, and why each item changes the price or the site programme.

Why the integrated top is the item that decides everything else

With a separate countertop and a drop-in basin, mistakes can be corrected at installation. With an integrated top, the cut-out, the waste connection below it, the thickness of the top and the position of the tapware are all fixed in one panel that has already travelled in a container. If a dimension is wrong, the replacement is a new panel and a new freight leg, not a trip to a local fabricator.

That is why our Custom & OEM Service starts from your drawings rather than from a catalogue size. The same logic applies across the wider Sanitary Fixtures / Bathrooms range, where vanities, mirror cabinets and storage units are specified together.

1. Countertop material and the edge you want to see

Our Stone & Marble Surfaces are offered with made-to-measure sizing and material and finish options, and the same configurable approach applies to an integrated vanity top. Before we quote, tell us:

  • The material family for the top, and whether it must match a countertop already specified elsewhere in the building.
  • Panel thickness at the front edge, and whether the edge is square, eased, mitred or built up.
  • Whether the splashback is one piece with the top or a separate panel fixed on site — this changes both how the panel is made and the joint you will live with.
  • Sealing and edge sealing requirements, and who applies them: us at the factory, or your installer on site.

For a guest bathroom that is used several times a day, ask for the same surface treatment across every basin in the project. Different seals on identical tops show up as uneven sheen under vanity lighting within a few months.

2. Basin type: integrated, undermount or vessel

The integrated top carries its own basin shape. If your design instead calls for a basin that sits below or above the surface, we machine the top to suit the basin you name:

Basin arrangementWhat you must confirm before we cut
Integrated basin, formed with the top — Integrated BasinBowl depth and front-to-back bowl position; whether the overflow is required; waste type and finish.
Undermount basin — Santerson Undermount BasinBasin outline and cut-out dimensions, minimum rim width around the cut, fixing method, and clearance under the top for the waste set.
Vessel basin above the counter — Santerson Vessel Basin (Above Counter)Basin height so the tap spout clears the rim, tap reach, and whether the tap goes through the top or into the wall.
Two basins in one top — Santerson Double Basin CountertopDistance between basin centres, distance from each centre to the side return, and whether both wastes share one wall pocket.

Send us the actual basin you intend to buy if it is not ours. A cut-out drawn from a brochure image is the most common cause of a rejected top; a cut-out drawn from the basin's technical sheet is not.

3. Tapware, waste and the wall behind them

  • Deck-mounted or wall-mounted tap, with the spout reach you expect. Wall-mounted taps fix the rough-in height long before the cabinet arrives.
  • Number and diameter of tap holes in the top, and whether a pop-up waste with a rod is acceptable given the drawer layout below.
  • Waste position relative to the front edge, so your plumber's trap matches the cabinet interior rather than fighting it.
Where tapware or shower sets come from the same order — for example a Modern Rainfall Shower System with Handheld Sprayer in the adjoining shower — we can coordinate finishes across both items, but rough-in dimensions remain your site contractor's setting-out. Confirm them against the finished wall line, not the structural one.

4. Cabinet construction: floating or floor-standing

The integrated countertop vanity sits on a carcass you choose. A Santerson Floating Vanity keeps the floor clear and reads lighter in a small guest bathroom, but it needs solid blocking in the wall and that blocking must be set before the tiles go on. A floor-standing unit carries its own weight and is easier to service. Compare both against a Santerson Double Vanity if the room width allows two basins.

  • Carcase and door material and finish, matched to the joinery already specified in bedrooms and wardrobes.
  • Drawer or door layout below the basin, including whether a pull-out Santerson Drawer Unit is wanted for linen or toiletries.
  • Hinge and runner brand and opening angle, plus handle or handleless edge — these change the door gap you will see.
  • Wall-hung load path: blocking position, tile thickness over it, and who fixes the bracket.

5. Storage above the basin: mirror cabinet first, then lighting

A vanity order that stops at the cabinet leaves the wall above to a different supplier, which is where most mismatches appear. Our Santerson LED Mirror Cabinet and Standard Mirror Cabinet are made to measure, so the width can follow the vanity exactly and the depth can be set against the mirror's door swing. In a taller wall, a Santerson Tall Mirror Cabinet stores what the vanity drawers cannot.

  • Mirror cabinet width and depth, and which side the hinge is on relative to the door opening.
  • Whether integrated lighting sits inside the cabinet, around it, or as separate Vanity Lighting and Santerson Wall Sconces at the mirror edge.
  • Where the electrical feed lands, and who is responsible for running it to that point.

6. Electrical details you should settle in writing

Integrated lighting, demisting pads and a towel warmer or rail all need a supply that exists at the right height and in the right zone. We list the consumption and connection requirement for each configured item; your electrician confirms the circuit, protection and switch position against local requirements. Get this exchange into the drawing revision, not an email chain.

7. How the vanity meets the surrounding finishes

The joint between a vanity top and a tiled wall, and the joint between a side panel and a Matte Lacquer Panel or Textured Panel, decide how the finished room reads. Decide who supplies that junction:

  • Whether side returns are supplied with the vanity and scribed on site, or set by your tiler.
  • Tolerance allowance at the wall — we build to the dimension you give us, so tell us whether it is a finished-face or structural dimension.
  • Sealant colour and who applies it, matched to the sample board rather than left to the installer.

8. Quantities, spares and the site programme

For an apartment or villa package, order vanities by bathroom type with a fixed configuration per type, then add spares for the parts most likely to need replacing later: drawer runners, door hinges and waste sets. We work through Logistics & Door-to-Door Delivery, so bathroom-by-bathroom packing and labelling means your crew unpacks one complete set per room instead of hunting parts across a container. Confirm the delivery sequence against your fit-out programme before we load.

A confirmation sheet to send back

Before production, we ask buyers to sign off this list. Anything left blank comes back later as a variation.

Item to confirmYour answer
Vanity type and room referenceFloating / floor-standing, one or two basins, room code from the drawing
Top material, thickness, edge profile, splashback method 
Basin arrangement and basin technical sheet attached 
Tapware type, holes, spout reach, waste and overflow 
Cabinet layout, hardware brand, handle or handleless 
Mirror cabinet size, hinge side, lighting position 
Electrical feed position and circuit responsibility 
Finished-face dimensions and wall tolerance 
Packing by room, delivery sequence, spare parts list 

Ordering through a single supplier

When the vanity, mirror cabinet, storage units, wall panels and lighting accessories come from one manufacturer, one drawing set covers all of them and one revision carries through the package. That is the practical reason buyers group these items with a one-stop furniture and building materials supplier rather than sourcing each piece separately — and it is how our Turnkey Solutions for villa and hospitality projects are assembled, from design coordination through production to Installation & After-sales Support.

Send us the bathroom layout with your preferred top material and basin arrangement marked, and we will return a configuration drawing with the cut-out, tap holes and electrical points shown for your sign-off before any panel is machined.

Talk to our project team about vanity configurations for your bathroom package: Contact Us.